Question a).
D = 10 gauges per hour
L = 2 hours
S = 0.20
C= 5 gauges
K= DL(1+S)/C
K = 10(2)(1+0.20) / 5 = 4.8 Þ 5 Kanban card sets
Question b).
Demand Rate (D)
cycle time (t)
capacity at container= C
X=0.50
(N) = DT (1+X)/C
4 vehicles per hour are produced
1 hours for transmissions to be delive
sy transmission de livered to fab line
N= DT(1+X)/C
D=4
T=1
C= 4
N = 4x1(1+0.50)/4 =1.5
Number at Kanban card sets = 1.5
please show work and 14 are $35,000 and $40,000, Copcuy.vn Bonus Problem (6 points) (Bonus points...
Transmissions are delivered to the fabrication line four at a time. It takes one hour for transmissions to be delivered. Approximately four vehicles are produced each hour, and management has decided that 50 percent of expected demand should be maintained as safety stock. How many kanban card sets are needed? (Round up your answer to the next whole number.) Number of kanban card sets
Please help with these case questions. Thank you Balagny Clothing Company Inc. is a major apparel manufacturer in the United States. It makes men's, women's, and children's casual wear such as denim jeans, cotton slacks, skirts, and sweaters. Balagny Clothing has taken the low-cost provider strategy and is constantly trying to find ways to cut costs and maintain its 4 percent profit margin while maintaining a competitive advantage over its major competitors. Because direct labor makes up approximately 65 percent...