Question

Transmissions are delivered to the fabrication line four at a time. It takes one hour for...

Transmissions are delivered to the fabrication line four at a time. It takes one hour for transmissions to be delivered. Approximately four vehicles are produced each hour, and management has decided that 50 percent of expected demand should be maintained as safety stock. How many kanban card sets are needed? (Round up your answer to the next whole number.)

Number of kanban card sets
0 0
Add a comment Improve this question Transcribed image text
Answer #1

The aim of Kanban is to promote transparency in the workflow within the organization in order to make the employees and management aware of the process they are involved in and what is their role within the organization. In this way employees and management could improve their effort to make the entire process effective for the organization.

Add a comment
Know the answer?
Add Answer to:
Transmissions are delivered to the fabrication line four at a time. It takes one hour for...
Your Answer:

Post as a guest

Your Name:

What's your source?

Earn Coins

Coins can be redeemed for fabulous gifts.

Not the answer you're looking for? Ask your own homework help question. Our experts will answer your question WITHIN MINUTES for Free.
Similar Homework Help Questions
  • please show work and 14 are $35,000 and $40,000, Copcuy.vn Bonus Problem (6 points) (Bonus points...

    please show work and 14 are $35,000 and $40,000, Copcuy.vn Bonus Problem (6 points) (Bonus points will be added to your homework score). a) A supplier of instrument gauge clusters uses a kanban system to control material flow. The gauge cluster housings are transported five at a time. A fabrication center produces approximately 10 gauges per hour. It takes approximately two hours for the housing to be replenished. Due to variations in processing times, management has decided to keep 20...

  • A bottling plant fills 2,400 bottles every two hours. The lead time is 50 minutes and...

    A bottling plant fills 2,400 bottles every two hours. The lead time is 50 minutes and a container accommodates 80 bottles. The safety stock is 30 percent of expected demand. How many kanban cards are needed? (Round up your answer to the next whole number.) Number of kanban card sets

  • The welding department supplies parts to the final assembly line. Management decides to implement a kanban...

    The welding department supplies parts to the final assembly line. Management decides to implement a kanban system and has collected the following data. The daily demand is 2,600 units. The production lead time is 6 days (this includes processing time, transport time, and waiting time). Management has decided to have 2 day(s) of safety stock One container fits 350 units How many kanban containers will be needed to support this system? (Round up to next whole number). containers

  • Meritor, a company that makes muffler assemblies for the automotive industry, is committed to the use...

    Meritor, a company that makes muffler assemblies for the automotive industry, is committed to the use of kanban to pull material through its manufacturing cells. Meritor has designed each cell to fabricate a specific family of muffler products. Fabricating a muffler assembly involves cutting and bending pieces of pipe that are welded to a muffler and a catalytic converter. The mufflers and catalytic converters are pulled into the cell based on current demand. The catalytic converters are made in a...

  • ​Meritor, a company that makes muffler assemblies for the automotive industry, is committed to the use of kanban to pull material through its manufacturing cells.

    Meritor, a company that makes muffler assemblies for the automotive industry, is committed to the use of kanban to pull material through its manufacturing cells. Meritor has designed each cell to fabricate a specific family of muffler products. Fabricating a muffler assembly involves cutting and bending pieces of pipe that are welded to a muffler and a catalytic converter. The mufflers and catalytic converters are pulled into the cell based on current demand. The catalytic converters are made in a...

  • Meritor is so pleased with the outcome from previous suggestions that the consultants are invited back...

    Meritor is so pleased with the outcome from previous suggestions that the consultants are invited back for more work. The consultants now suggest a more complete robotic automation of the making of muffler assemblies and also a reduction in container size to four per container. Meritor implements these suggestions and the result is that the muffler assembly fabrication cell now averages approximately 30 assemblies per hour, and the catalytic converter assembly cell can now respond to an order for a...

  • Question Help Consider the following information: Demand rate (D) = 1,500 units per hour Lead time...

    Question Help Consider the following information: Demand rate (D) = 1,500 units per hour Lead time (T) = 7 hours Container capacity (C)= 220 units Safety factor (x) = 20% a. The number of kanban production cards is (Enter your response rounded up to the next whole number.) b. The cards will represent hours' worth of demand. (Enter your response rounded to one decimal place.) c. Suppose the safety factor is eliminated. The number of kanban production cards is to...

  • Consider the following information: Demand rate (D) = 270 units per hour Lead time (T) =...

    Consider the following information: Demand rate (D) = 270 units per hour Lead time (T) = 10 hours Container capacity (C) = 30 units Safety factor (x) = 10% a. The number of kanban production cards is (Enter your response rounded up to the next whole number.)

  • A manufacturing assembly line has a demand for specific part of 1,200 parts per eight-hour day....

    A manufacturing assembly line has a demand for specific part of 1,200 parts per eight-hour day. It wants to design a lean system using containers. It takes about four hours to round-trip a container from one work center to the next and back again. It also wants to hold 10% safety stock of this part in its system. a) Design a container system. State each container's size and how many are needed. b) Calculate the maximum system inventory for this...

  • Knott's Industries manufactures standard and super premium backyard swing sets. Currently it has four identical swing-set-making...

    Knott's Industries manufactures standard and super premium backyard swing sets. Currently it has four identical swing-set-making machines, which are operated 250 days per year and 8 hours each day. A capacity cushion of 15 percent is desired. The following information is also known: i Standard Model Super Premium Model Annual Demand 20,000 10,000 Standard Processing Time 7 min 20 min Average Lot Size 25 Standard Setup Time per Lot 30 min 45 min a. Does Knott's have sufficient capacity to...

ADVERTISEMENT
Free Homework Help App
Download From Google Play
Scan Your Homework
to Get Instant Free Answers
Need Online Homework Help?
Ask a Question
Get Answers For Free
Most questions answered within 3 hours.
ADVERTISEMENT
ADVERTISEMENT
ADVERTISEMENT