Consider the following information: Demand rate (D) = 270 units per hour Lead time (T) = 10 hours Container capacity (C) = 30

0 0
Add a comment Improve this question Transcribed image text
Answer #1

The number of kanban production cards is computed as follows:

= Demand rate x container capacity x ( 1 + safety factor ) / lead time

= 270 x 30 x 1.10 / 10

= 891

Feel free to ask in case of any query relating to this question

Add a comment
Know the answer?
Add Answer to:
Consider the following information: Demand rate (D) = 270 units per hour Lead time (T) =...
Your Answer:

Post as a guest

Your Name:

What's your source?

Earn Coins

Coins can be redeemed for fabulous gifts.

Not the answer you're looking for? Ask your own homework help question. Our experts will answer your question WITHIN MINUTES for Free.
Similar Homework Help Questions
  • Question Help Consider the following information: Demand rate (D) = 1,500 units per hour Lead time...

    Question Help Consider the following information: Demand rate (D) = 1,500 units per hour Lead time (T) = 7 hours Container capacity (C)= 220 units Safety factor (x) = 20% a. The number of kanban production cards is (Enter your response rounded up to the next whole number.) b. The cards will represent hours' worth of demand. (Enter your response rounded to one decimal place.) c. Suppose the safety factor is eliminated. The number of kanban production cards is to...

  • Please solve in excel with all formulas shown You have the following information: 5. Demand rate...

    Please solve in excel with all formulas shown You have the following information: 5. Demand rate = 250 units per hour Lead time = 15 hours Container capacity 300 units Safety stock = 20% Determine the number of Kanban cards required. a. Convert these Kanban cards into the number of hours b. of demand they represent If the container size is reduced from 300 to 150 units C what impact, if any, will it have on inventory levels?

  • A bottling plant fills 2,400 bottles every two hours. The lead time is 50 minutes and...

    A bottling plant fills 2,400 bottles every two hours. The lead time is 50 minutes and a container accommodates 80 bottles. The safety stock is 30 percent of expected demand. How many kanban cards are needed? (Round up your answer to the next whole number.) Number of kanban card sets

  • JIT /Lean - Kanban: Daily demand for a product is 200 units. The production lead time...

    JIT /Lean - Kanban: Daily demand for a product is 200 units. The production lead time (wait time + production time) for a container is 2 days. A 1-day safety stock is kept. How many kanban containers will be needed if each container holds 50 units? [Show calculations.]

  • Given this information: Lead-time demand = 620 pounds Standard deviation of lead time demand = 50...

    Given this information: Lead-time demand = 620 pounds Standard deviation of lead time demand = 50 pounds (Assume normality.) Acceptable stockout risk during lead time = 4 percent Use Table. a. What amount of safety stock is appropriate? (Round your answer to the nearest whole number.)   Safety stock units b. When should this item be reordered? (Round your answer to the nearest whole number.)   ROP units c. What risk of stockout would result from a decision not to have any...

  • Given this information: Expected demand during lead time = 285 units Standard deviation of lead time...

    Given this information: Expected demand during lead time = 285 units Standard deviation of lead time demand = 16 units Use Table. Determine each of the following, assuming that lead time demand is distributed normally: a. The ROP that will provide a risk of stockout of 1 percent during lead time. (Round your answer to the nearest whole number.) ROP _____ units    b. The safety stock needed to attain a 1 percent risk of stockout during lead time. (Do...

  • Given this information: Expected demand during lead time = 295 units Standard deviation of lead time...

    Given this information: Expected demand during lead time = 295 units Standard deviation of lead time demand = 20 units Use Table. Determine each of the following, assuming that lead time demand is distributed normally: a. The ROP that will provide a risk of stockout of 2 percent during lead time. (Round your answer to the nearest whole number.) ROP             units    b. The safety stock needed to attain a 2 percent risk of stockout during lead time....

  • Answers must be to rounded to the nearest number Markland First National Bank of Rolla utilizes...

    Answers must be to rounded to the nearest number Markland First National Bank of Rolla utilizes kanban techniques in its check processing facility. The following information is known about the process. Each kanban container can hold 25 checks and spends 48 minutes a day in processing and 4 hours a day in materials handling and waiting. Finally, the facility operates 24 hours per day and utilizes a policy variable for unforeseen contingencies of 0.20. units. (Enter your response rounded to...

  • The welding department supplies parts to the final assembly line. Management decides to implement a kanban...

    The welding department supplies parts to the final assembly line. Management decides to implement a kanban system and has collected the following data. The daily demand is 2,600 units. The production lead time is 6 days (this includes processing time, transport time, and waiting time). Management has decided to have 2 day(s) of safety stock One container fits 350 units How many kanban containers will be needed to support this system? (Round up to next whole number). containers

  • Transmissions are delivered to the fabrication line four at a time. It takes one hour for...

    Transmissions are delivered to the fabrication line four at a time. It takes one hour for transmissions to be delivered. Approximately four vehicles are produced each hour, and management has decided that 50 percent of expected demand should be maintained as safety stock. How many kanban card sets are needed? (Round up your answer to the next whole number.) Number of kanban card sets

ADVERTISEMENT
Free Homework Help App
Download From Google Play
Scan Your Homework
to Get Instant Free Answers
Need Online Homework Help?
Ask a Question
Get Answers For Free
Most questions answered within 3 hours.
ADVERTISEMENT
ADVERTISEMENT
ADVERTISEMENT