Given this information: Lead-time demand = 620 pounds Standard deviation of lead time demand = 50...

Given this information:
Lead-time demand = 620 pounds
Standard deviation of lead time demand = 50 pounds (Assume normality.)
Acceptable stockout risk during lead time = 4 percent
Use Table.


a.

What amount of safety stock is appropriate? (Round your answer to the nearest whole number.)


  Safety stock units


b.

When should this item be reordered? (Round your answer to the nearest whole number.)


  ROP units


c. What risk of stockout would result from a decision not to have any safety stock? (Omit the "%" sign in your response.)


  Stockout risk %
0 0
Add a comment Improve this question Transcribed image text
Answer #1

safety stock = z x SDLT where z for the service level of 96% would be 1.75

= 1.75 x 50 = 87.5 =88 units.

ROP = demand during lead time + safety stock

= 620+88 = 708

0 safety stock means z=0, which corresponds to the probability of stock out equal to 50%

Add a comment
Know the answer?
Add Answer to:
Given this information: Lead-time demand = 620 pounds Standard deviation of lead time demand = 50...
Your Answer:

Post as a guest

Your Name:

What's your source?

Earn Coins

Coins can be redeemed for fabulous gifts.

Not the answer you're looking for? Ask your own homework help question. Our experts will answer your question WITHIN MINUTES for Free.
Similar Homework Help Questions
  • Given this information: Expected demand during lead time = 285 units Standard deviation of lead time...

    Given this information: Expected demand during lead time = 285 units Standard deviation of lead time demand = 16 units Use Table. Determine each of the following, assuming that lead time demand is distributed normally: a. The ROP that will provide a risk of stockout of 1 percent during lead time. (Round your answer to the nearest whole number.) ROP _____ units    b. The safety stock needed to attain a 1 percent risk of stockout during lead time. (Do...

  • Given this information: Expected demand during lead time = 295 units Standard deviation of lead time...

    Given this information: Expected demand during lead time = 295 units Standard deviation of lead time demand = 20 units Use Table. Determine each of the following, assuming that lead time demand is distributed normally: a. The ROP that will provide a risk of stockout of 2 percent during lead time. (Round your answer to the nearest whole number.) ROP             units    b. The safety stock needed to attain a 2 percent risk of stockout during lead time....

  • Problem 6- Fixed Order Interval (FOI) Demand for walnut fudge ice cream at the Sweet Cream...

    Problem 6- Fixed Order Interval (FOI) Demand for walnut fudge ice cream at the Sweet Cream Dairy can be approximated by a normal distribution with a mean of 21 gallons per week and a standard deviation of 3.2 gallons per week. The new manager desires a service level of 90 percent. Lead time is two days, and the dairy is open seven days a week. (Hint: Work in terms of weeks.) Use Table B and Table B1. a-1. If an...

  • Average daily demand (d) 130 cases Demand Standard deviation (σd) 20 cases Service level 94.0% Service...

    Average daily demand (d) 130 cases Demand Standard deviation (σd) 20 cases Service level 94.0% Service level alternative 86.0% Lead tme, LT 6 days 1. What is the standard deviation of demand during lead time? Round your answer to one decimal place. _______ cases 2. What is the required safety stock at a 94 percent service level? Round your answer to the nearest whole number. _______ cases 3. What is the reorder point? Round your answer to the nearest whole...

  • Demand during lead time for one brand of TV is normally distributed with a mean of...

    Demand during lead time for one brand of TV is normally distributed with a mean of 36 TVs and a standard deviation of 15 TVs. What safety stock should be carried for 90% service level? What is the appropriate reorder point? Click the icon to view the normal table What safety stock should be carried for a 90% service level? Safety stock units (round your response to the nearest whole number).

  • Based on available​ information, lead time demand for PC jump drives averages 53 units​ (normally distributed),...

    Based on available​ information, lead time demand for PC jump drives averages 53 units​ (normally distributed), with a standard deviation of 5 drives. Management wants a 95​% service level. Refer to the standard normal table for​ z-values. ​a) What value of Z should be​ applied? (1.04/1.28/2.06/1.65) ​b) How many drives should be carried as safety​ stock? __________ units ​(round your response to the nearest whole​ number). ​c) What is the appropriate reorder​ point? __________ units ​(round your response to the...

  • Demand for walnut fudge ice cream at the Sweet Cream Dairy can be approximated by a...

    Demand for walnut fudge ice cream at the Sweet Cream Dairy can be approximated by a normal distribution with a mean of 21 gallons per week and a standard deviation of 3.0 gallons per week. The new manager desires a service level of 90 percent. Lead time is two days, and the dairy is open seven days a week. (Hint: Work in terms of weeks.) Use Table B and Table B1. a-1. If an ROP model is used, what ROP...

  • Problem 14-31 (Algorithmic) A product with an annual demand of 1100 units has Co = $24.5 and Ch = $7. The demand exhibits some variability such that the lead-time demand follows a normal probability d...

    Problem 14-31 (Algorithmic) A product with an annual demand of 1100 units has Co = $24.5 and Ch = $7. The demand exhibits some variability such that the lead-time demand follows a normal probability distribution with µ = 30 and σ = 6. What is the recommended order quantity? If required, round your answer to two decimal places. Q* = What are the reorder point and safety stock if the firm desires at most a 3% probability of stock-out on...

  • If the demand during review cycle is equal to 12, the demand during lead time is...

    If the demand during review cycle is equal to 12, the demand during lead time is 11, and the safety stock is equal to 8, what is the order point? What is the EOQ of an item with a project annual demand of 500, and ordering cost of $5, a holding cost percentage of 35%, and an item cost of $10. (Round to the nearest whole unit) For example, 8.52 = 9.

  • Question Help Consider the following information: Demand rate (D) = 1,500 units per hour Lead time...

    Question Help Consider the following information: Demand rate (D) = 1,500 units per hour Lead time (T) = 7 hours Container capacity (C)= 220 units Safety factor (x) = 20% a. The number of kanban production cards is (Enter your response rounded up to the next whole number.) b. The cards will represent hours' worth of demand. (Enter your response rounded to one decimal place.) c. Suppose the safety factor is eliminated. The number of kanban production cards is to...

ADVERTISEMENT
Free Homework Help App
Download From Google Play
Scan Your Homework
to Get Instant Free Answers
Need Online Homework Help?
Ask a Question
Get Answers For Free
Most questions answered within 3 hours.
ADVERTISEMENT
ADVERTISEMENT
ADVERTISEMENT