answer 6 : B- Logical data flow diagram
answer 7 : C - activities that retrieve , transform ,and file data
answer 8 : true
QUESTION 6 10 points Which data flow diagram shows what activities the system is performing without...
The following is a jumbled list of the activities suggested in this text for drafting data flow diagrams (DFDs) for an existing system II. Prepare a table of entities and activities. Prepare an annotated table of entities and activities Draw a physical data flow diagram Draw a logical data flow diagram. Draw a context diagram. IV. V. The best sequence for undertaking these activities is: a. I, V, III, II, IV b. II, I, III, V, IV C. II, IV,...
In a data flow diagram (DFD), a data flow symbol shown below represents a pathway for data True False QUESTION 10 In a data flow diagram (DFD), a square represents an internal entity. True False Click Save and Submit to save and submit Chick Save All Answers to save all answers.
uLaI 1O points QUESTION 1-Data Flow Diagrams Draw a context-level AND a logical level-O data flow diagram showing the processes described in the system below 25 points) For a local city council, letters of complaint received from citizens are scanned and saved in a complaints' master file by the City Manager's office. The date, department code, and a complaint description are stored for each letter. The municipality acknowledges by a return mail the receipt of the letter. At the same...
QUESTION 7 10 points Save Answer In a simple circular-flow diagram, firms O purchase resources from households O purchase the output produced by households O receive income by selling resources to households O All of the above are correct
fOne question but divided into sub connected questions * Question Completion Status: QUESTION 1 20 points Save Ans The heat-pump system shown is designed to provide water-heating and space-cooling. The system includes a heat exchanger to subcool the R134a refrigerant at the outlet of the water heater while heating the refrigerant at the outlet of the evaporator. Given the following data, determine the enthalpy at each station, 1 through 6, using the R134a property tables (click here). Type your answers...
QUESTION 1 3.8 points Save Ans The cost management plan has all of the following characteristics EXCEPT It may specify variance thresholds for monitoring cost performance to indicate an agreed-upon amount of variation to be allowed before some action needs to be taken. It describes how the project costs will be planned, structured, and controlled. It is based on project cost estimates and is separate from the project management plan. It may specify the level of precision, which is the...