Question

Its About Time, Inc., manufacturers 2 lines of cocks Digital and Analog Under the current costing system, manufacturing over

0 0
Add a comment Improve this question Transcribed image text
Answer #1
0.375 0.625
4000
0.6
Correct Option is B. Since, allocation ratio in same ie.e 37.5% for digital and analog.
Digital Analog Digital Analog
Total expected machine hours 1500 2500 0.375 0.625
Budgeted Output 750 500
Number of clock to be Produced per machine setup 25 10
Total setup required 30 50 0.375 0.625
Ratio
Reasons for other options for being incorrect:
Option A If there are two products only in the company and overheads are allocated and if there is overcosting in one product then other costing MUST BE UNDERCOSTED not overcosted.
Option C Direct material and direct labor information is not relevant for determining overcosting and undercosting. Machine Hours and overhead expense are required only.
Option D Under current costing, out of total 4000 machine hours, 1500 hours are for digital which is 37.5% of total overhead hence, 60% is not correct.
Option E Under Activity based costing 62.5% overhead cost are applied to the analog product line.

*please give your valuable feedback. Your feedback is very important for me.

Add a comment
Know the answer?
Add Answer to:
It's About Time, Inc., manufacturers 2 lines of cocks Digital and Analog Under the current costing...
Your Answer:

Post as a guest

Your Name:

What's your source?

Earn Coins

Coins can be redeemed for fabulous gifts.

Not the answer you're looking for? Ask your own homework help question. Our experts will answer your question WITHIN MINUTES for Free.
Similar Homework Help Questions
  • It's About Time, Inc. manufacturers 2 lines of clocks: Digital and Analog. Under the current costing...

    It's About Time, Inc. manufacturers 2 lines of clocks: Digital and Analog. Under the current costing system, manufacturing overhead is applied to each line based on machine hours. Machine Setup costs account for the majority of manufacturing overhead and are expected to total $75,000 for the upcoming period. The controller for the company has suggested to management that an activity based costing system be analyzed and has determined that the number of machine setups drives the total machine setup costs....

  • The projected production levels for the upcoming period are 1,000 Square pillows and 5,000 Round pillows....

    The projected production levels for the upcoming period are 1,000 Square pillows and 5,000 Round pillows. The following information was compiled for the product lines: machine hours Square 0.9 hours per pillow 25 pillows per setup Round 0.3 hours per pillow 25 pillows per setup setups Which of the following statements is correct with regard to the above information? A. Under the current costing system, 37.5% of the machine setup manufacturing overhead costs are allocated to the Square product line....

  • 1. An important difference between activity-based costing and traditional costing is that under activity-based costing, _____....

    1. An important difference between activity-based costing and traditional costing is that under activity-based costing, _____. a.activities are not considered in determining product cost b.a plantwide overhead rate is used c.multiple overhead rates are calculated d.unit costs are less accurate 2. Activity-based customer costing: a.has a single driver for all customers. b.is not useful for companies with a JIT (just-in-time) structure. c.is not useful for companies with only one product. d.has customers as cost objects. 3. Which of the following...

  • 1. An important difference between activity-based costing and traditional costing is that under activity-based costing, _____....

    1. An important difference between activity-based costing and traditional costing is that under activity-based costing, _____. a.activities are not considered in determining product cost b.a plantwide overhead rate is used c.multiple overhead rates are calculated d.unit costs are less accurate 2. Activity-based customer costing: a.has a single driver for all customers. b.is not useful for companies with a JIT (just-in-time) structure. c.is not useful for companies with only one product. d.has customers as cost objects. 3. Which of the following...

  • Activity-Based Costing and Product Cost Distortion Digital Storage Concept Inc. is considering a change to activity-based...

    Activity-Based Costing and Product Cost Distortion Digital Storage Concept Inc. is considering a change to activity-based product costing. The company produces two products, cell phones and tablet PCs, in a single production department. The production department is estimated to require 4,000 direct labor hours. The total indirect labor is budgeted to be $504,000. Time records from indirect labor employees revealed that they spent 60% of their time setting up production runs and 40% of their time supporting actual production. The...

  • Which of the following would usually be found on a job cost sheet under a normal...

    Which of the following would usually be found on a job cost sheet under a normal costing system? Multiple Choice budgeted direct material costs, budgeted direct labor costs and budgeted factory overhead costs O actual direct material costs, actual direct labor costs and applied factory overhead costs budgeted direct material costs, budgeted direct labor costs and applied factory overhead costs O actual direct material costs, actual direct labor costs and actual factory overhead costs Multiple Choice 0 labor cost of...

  • Harwell, Inc. produces two different products, Product A and Product B. Harwell uses a traditional volume-based...

    Harwell, Inc. produces two different products, Product A and Product B. Harwell uses a traditional volume-based costing system in which direct labor hours are the allocation base. Harwell is considering switching to an ABC system by splitting its manufacturing overhead cost of $750,000 across three activities: Setup, Production, and Finishing. Under the traditional volume-based costing system, the predetermined overhead rate is $7.50/direct labor hour. Under the ABC system, the rate for each activity and usage of the activity drivers are...

  • Lupo Corporation uses a job-order costing system with a single plantwide predetermined overhead rate based on...

    Lupo Corporation uses a job-order costing system with a single plantwide predetermined overhead rate based on machine-hours. The company based its predetermined overhead rate for the current year on the following data: Total machine-hours 30,000 Total fixed manufacturing overhead cost $ 252,000 Variable manufacturing overhead per machine-hour $ 2.10 Recently, Job T687 was completed with the following characteristics: Number of units in the job 10 Total machine-hours 30 Direct materials $ 675 Direct labor cost $ 1,050 The estimated total...

  • Lakeside Inc. manufactures four lines of remote control boats and uses activity-based costing to calculate product...

    Lakeside Inc. manufactures four lines of remote control boats and uses activity-based costing to calculate product cost Estimated Activity Cost Pools Total Cost Estimated Cost Driver Machining $333,000 12.800 machine hours 72,000 360 batches Quality control 88,000 850 inspections Setup Suppose the Luxury boat requires 5,250 machine hours, 155 inspections, and 59 batches. Using activity proportions, determine the amount of overhead assigned to the Luxury product line. (Round your intermediate calculations to the nearest whole percentage and your final answer...

  • CMA5-5 Chapter 5 Activity-Based Costing are given below Product AProductB CMAS-S. Atmel Inc. manufactures and sells...

    CMA5-5 Chapter 5 Activity-Based Costing are given below Product AProductB CMAS-S. Atmel Inc. manufactures and sells two products. Data with regard to these products are given be 30,000 12,000 Units produced and sold Machine hours required per unit.. Receiving orders per product line . Production orders per product line......... Production runs 2 50 12 8 20 150 18 12 30 Total budgeted machine hours are 100,000. The budgeted overhead costs are shown below .. $ 450,00 Receiving costs Engineering costs....

ADVERTISEMENT
Free Homework Help App
Download From Google Play
Scan Your Homework
to Get Instant Free Answers
Need Online Homework Help?
Ask a Question
Get Answers For Free
Most questions answered within 3 hours.
ADVERTISEMENT
ADVERTISEMENT
ADVERTISEMENT