Calculation of Expected Returns and standard deviation of each stock | |||||||
Stock A | Stock B | Standard Deviation | |||||
Economy | Probability | Returns | Expected Returns | Returns | Expected Returns | Stock A | Stock B |
x | a | a*x | b | b*x | x{(a-∑x)^2} | x(b-∑b)^2 | |
Recession | 0.1 | -18 | -1.80 | -10 | -1 | 78.40 | 28.22 |
below avg | 0.2 | -4 | -0.80 | 2 | 0.4 | 39.20 | 4.61 |
average | 0.4 | 12 | 4.80 | 8 | 3.2 | 1.60 | 0.58 |
above avg | 0.2 | 24 | 4.80 | 12 | 2.4 | 39.20 | 5.41 |
boom | 0.1 | 30 | 3.00 | 18 | 1.8 | 40.00 | 12.54 |
Expected Return | ∑x | 10.00 | ∑b | 6.8 | |||
∑ | 198.40 | 51.36 | |||||
Standard deviation | (198.4)^(1/2) | (51.36)^(1/2) | |||||
= | 14.09 | 7.17 |
- 10.0 2. Consider the two assets A and B for which returns (%) under different...
Suppose a portfolio manager wishes to construct a portfolio using two securities Coll and USR. Specifically, the manger allocates $60,000 in the Coll and $30,000 in the USR. Please calculate (1) Portfolio Expected Return (2) Portfolio Standard Deviation Economy Prob. T-Bills HT Coll USR MP Recession 0.1 5.5% -27.0% 27.0% 6.0% -17.0% Below avg 0.2 5.5% -7.0% 13.0% -14.0% -3.0% Average 0.4 5.5% 15.0% 0.0% 3.0% 10.0% Above avg 0.2 5.5% 30.0% -11.0% 41.0% 25.0% Boom 0.1 5.5% 45.0% -21.0%...
Suppose a portfolio manager wishes to construct a portfolio using two securities Coll and USR, both of their return data are shown in the Slide 5 with the title “Hypothetical Investment Alternatives”. Specifically, the manger allocates $60,000 in the Coll and $30,000 in the USR. Please calculate (1) Portfolio Expected Return (2) Portfolio Standard Deviation Economy Prob. T-Bills HT Coll USR MP Recession 0.1 5.5% -27.0% 27.0% 6.0% -17.0% Below avg 0.2 5.5% -7.0% 13.0% -14.0% -3.0% Average 0.4 5.5%...
Suppose a portfolio manager wishes to construct a portfolio using two securities Coll and USR, both of their return data are shown in the Slide 5 with the title “Hypothetical Investment Alternatives”. Specifically, the manger allocates $60,000 in the Coll and $30,000 in the USR. Please calculate (1) Portfolio Expected Return (2) Portfolio Standard Deviation Economy Prob. T-Bills HT Coll USR MP Recession 0.1 5.5% -27.0% 27.0% 6.0% -17.0% Below avg 0.2 5.5% -7.0% 13.0% -14.0% -3.0% Average 0.4 5.5%...
10.1 Consider the following probability distribution of returns estimated for a proposed project that involves a new ultrasound machine: State of the Economy Very poor Poor Average Good Very good Probability of Occurrence 0.10 0.20 Rate of Return -10.0% 0.0 0.40 10.0 0.20 20.0 0.10 30.0 a. What is the expected rate of return on the project? b. What is the project's standard deviation of returns? What is the project's co- efficient of variation (CV) of returns? (Hint: CV is...
Given the following information concerning ASSETS X and Y: Possible Returns of Assets Outcomes Probability X Y 1 0.10 20.0% -10.0% 2 0.20 -8.0% 10.0% 3 0.45 12.0% 12.0% 4 0.15 30.0% 14.0% 5 0.10 40.0% 16.0% Variance of Returns 0.02081 0.00478 Covariance 0.001137 What is the expected return of a portfolio comprised of 30percentof an investor's wealth invested in ASSET X and 70 percentinvested in ASSET Y? a. 12.62 percent d. 11.36 percent b. 12.20 percent e. 10.94 percent c. 11.78 percent What is the CORRELATION between these two securities? (Hint: Compute using the short-cut approach; it will save you a lot of time.) a. -0.248 d. 0.198 b. 0.254 e. 0.365 c. 0.114 What is...
How do you solve for B?
10.1 Consider the following probability distribution of returns estimated for a proposed project that involves a new ultrasound machine: State of the Economy Very poor Poor Average Good Very good Probability of Occurrence 0.10 0.20 0.40 0.20 0.10 Rate of Return -10.0% 0.0 10.0 20.0 30.0 a. What is the expected rate of return on the project? b. What is the project's standard deviation of returns? What is the project's coefficient of variation (CV)...
1. Assume that there are two assets and three state of economy as followState Of EconomyProbability Of State Of EconomyRate Of Return If State OccursAsset AAsset BRecession 0.20-0.150.20Normal 0.500.200.30Boom 0.300.600.40Assume further that Br. 15,000 invested in asset A and Br. 5,000 invested in asset B. Based on this information, answer the following questions.a) Compute expected returns and standard deviation of the portfolio à5Marks b) Compute covariance of the assets (CovAB) à2Marks c) If the assets...
An analyst has predicted the following returns for Stock A and Stock B in three possible states of the economy. State Probability A Boom Normal Recession 0.24 0.27 0.49 0.16 0.20 0.10 0.17 0.25 a. What is the probability of a recession? (Round your answer to 2 decimal places.) Probability 0.26 b. Calculate the expected return for Stock A and Stock B. (Round your answers to 2 decimal places) Expected Return Stocks A Stocks B c. Calculate the expected return...
Attempts: 0 Average: 12 5. The probabilistic approach to calculate expected returns Investors are willing to make investments because they expect a return from doing so. As the name suggests, expected returns are not assured. Because they occur in the future, expected returns cannot be observed either, so stock analysts substitute historical realized returns in their mathematical analyses. Realized return is the name for returns that have actually been earned. Many analysts use past realized returns to both predict future...
Question4 Kamet is an investment fund that invests on the Ghana Stock Exchange. In recent times the economy has gone through four different cycles which analyst believe may be repeated in the years ahead. Kamet is reviewing its investment strategy and is looking for the best way to malke good returns for its clients. The returns on thrce assets selected by Kamet are provided below Business Cyele Probability Unilever Normal Boom Near Recession Recession 0.30 0.40 0.10 ???,20.1.. 40% 20%...