Answer:
Annual requirement (in units) per year = 300,000
Time required to produce 1 unit = 5 min
Production machine Running hours per year = 2000 hrs = 2000 * 60 =
120000
Number of plastic toy units a machine can churn out every year =
120000 / 5 = 24000
Defect rate = 2%
=> Defective pieces produced out of 24000 units = 24000 * 2 /
100 = 480 units
So, Net yearly plastic toy units production of a single machine
= 24000 - 480 = 23520
Hence total number of machines required to produce 300,000
= 300,000 / (Net yearly plastic toy units production of a single
machine)
= 300,000 / 23520 = 12.755
The company should by 13 machines to meet the annual
plastic toy production target.
8. A toy manufacturer specializes in making a very popular plastic toy. The company wants to...
Jackson Hole Manufacturing is a small manufacturer of plastic products used in the automotive and computer industries. One of its major contracts is with a large computer company and involves the production of plastic printer cases for the computer companys portable printers. The printer cases are produced on two injection molding machines. The M-100 machine has a production capacity of 25 printer cases per hour, and the M-200 machine has a production capacity of 40 cases per hour. Both machines...
Bakground: Duraweld is a British plastic binding manufacturer established in 1959 and the result of a merger between two local small and medium enterprises (SMEs) in 1970. This company has sailed through the recent economic downturn and has reinvented itself thanks to following lean principles. Duraweld produces customized plastic elements, such as stationery, and decided to move away from standardization to resist the growing competition from Asia on higher volume items resulting in low volume/high variety production profile. Their website...
Case 27 To Use or Not to Use? Beaufort Sea Production Company (BSPC) operates a medium-sized oil field on Alaska’s north coast. The field is still producing at its maximum rate, 325,000 barrels of oil per day (BOPD). However, to sustain this rate the company started a waterflood of the reservoir two years ago. Now a capacity bottleneck in the water disposal process is threatening to curtail production. In waterflooding, salt water from the Beaufort Sea is treated to remove...
SYNOPSIS The product manager for coffee development at Kraft Canada must decide whether to introduce the company's new line of single-serve coffee pods or to await results from the product's launch in the United States. Key strategic decisions include choosing the target market to focus on and determining the value proposition to emphasize. Important questions are also raised in regard to how the new product should be branded, the flavors to offer, whether Kraft should use traditional distribution channels or...
Should World Kitchen outsource Pyrex production and close the Charleroi plant? If so, how many suppliers should the company employ and where should they be located? We were unable to transcribe this imagedishwas resulted from a process that pressed together yers of thin, strengthened opaque glass. products if they were moved overseas and simply source the lower-cost private-label versions directly sales and marketing functions. THE MARKET Givsn its extensive experience with outsourcing the Giobal Sourcing Department at World Kitchen had...