Question

4.22 The table below lists the work elements in minutes to be performed on assembly line with precedence requirements. Annual
0 0
Add a comment Improve this question Transcribed image text
Answer #1

Goluson 0.4 3 0.5 0 3 100-5 balancing Solution using he loogegt condidalt 0le Line a) Allocation o elements to 9rations List501) 43 balanting al delay 5010) 0.14 Line balancing Son using te ilbioge ard wester metel List dt elements by poecedlen ce AColution hil bidge and using balanding Line the method westeo Clement by element testaton Albaton ok STE Element Te Teimin) 9

Add a comment
Know the answer?
Add Answer to:
4.22 The table below lists the work elements in minutes to be performed on assembly line...
Your Answer:

Post as a guest

Your Name:

What's your source?

Earn Coins

Coins can be redeemed for fabulous gifts.

Not the answer you're looking for? Ask your own homework help question. Our experts will answer your question WITHIN MINUTES for Free.
Similar Homework Help Questions
  • DO NOT COPY THE ANSWER FROM ANOTHER SIMILAR QUESTION!!! IT IS INCORRECT!!!! A new electrical device...

    DO NOT COPY THE ANSWER FROM ANOTHER SIMILAR QUESTION!!! IT IS INCORRECT!!!! A new electrical device is to be assembled in the new facility.The line will be operated 250 day/yr, 15 hr/day. The work content has been divided into work elements as defined in the table below. Also given are the element times and precedence requirements. Annual production is to be 400,000 units. It is anticipated that the line efficiency (proportion uptime) E = 0.97. The repositioning time for each...

  • 1. [Layout Strategy-Line Balancing] The call center department of Jax-steel company needs to service 3,000 calls...

    1. [Layout Strategy-Line Balancing] The call center department of Jax-steel company needs to service 3,000 calls per 40-hour workweek. The process of servicing calls can be broken down into the six stations listed above. The precedence and time requirements for each element are as follows in the table below. The manager wants a new operational analyst to draw and label a precedence diagram for the service process. Finally, the manager needs to balance the line, calculate the efficiency of the...

  • John is installing a production line in the kitchen of his successful restaurant “Light of the...

    John is installing a production line in the kitchen of his successful restaurant “Light of the World” to make vanilla soufflé with caramel sauce. He figures his layout can be broken down into the following tasks: A. Egg separation – 8.5 min. B. Flour, milk, vanilla, egg yolk and sugar blend – 6.5 min. C. Fold egg whites into blend – 2.0 min. D. Bake – 8.9 min. E. Remove from oven, apply topping, garnish, stage, deliver – 8.0 min....

  • the elements together with the predecessor and processing time of two models A and B are...

    the elements together with the predecessor and processing time of two models A and B are shown in table below. hourly production rate of model a and b are 25 units/hr and 18 units/hr. assume E=1.0, Er=1.0 and M=1. a) draw the precedence diagram for each model and both models b) find the theoretical number of workstation needed to achieve the required production rate. c) use K-W method to solve the line balancing problem d) determine the balance efficiency for...

ADVERTISEMENT
Free Homework Help App
Download From Google Play
Scan Your Homework
to Get Instant Free Answers
Need Online Homework Help?
Ask a Question
Get Answers For Free
Most questions answered within 3 hours.
ADVERTISEMENT
ADVERTISEMENT
ADVERTISEMENT