Question

John is installing a production line in the kitchen of his successful restaurant “Light of the...

John is installing a production line in the kitchen of his successful restaurant “Light of the World” to make vanilla soufflé with caramel sauce. He figures his layout can be broken down into the following tasks: A. Egg separation – 8.5 min. B. Flour, milk, vanilla, egg yolk and sugar blend – 6.5 min. C. Fold egg whites into blend – 2.0 min. D. Bake – 8.9 min. E. Remove from oven, apply topping, garnish, stage, deliver – 8.0 min. Task A and Task B have no predecessors. Task C’s predecessors are Task A and Task B. Task D’s predecessor is Task C. Task E's predecessor is Task D. i. Please determine his desired cycle time in minutes based on an output of 30 soufflés per evening, assuming he starts at 5:30 pm and ends at 10:00 pm. a. 20 minutes b. 10 minutes c. 5 minutes d. 9 minutes ii. Please determine the minimum number of work stations he needs. a. 1 workstation b. 3 workstations c. 4 workstations d. 2 workstations iii. Please group the tasks into workstations based on Line Balancing principles. a. Workstation 1: Task A, Workstation 2: Tasks B and C, Workstation 3: Task D, Workstation 4: Task E b. Workstation 1: Tasks A,B and C; Workstation 2: Tasks E; Workstation 3: Task E c. Workstation 1: Tasks A and B; Workstation 2: Tasks C, D and E d. Workstation 1: Task A and B, Workstation 2: Task C, Workstation 3: Task D, Workstation 4: Task E iv. Please determine the % Balance Delay a. 8.5% b. 5.8% c. 13.5% d. 84.2% v. Please determine the % Efficiency a. 68.5% b. 86.5% c. 94.2% d. 13.5%

0 0
Add a comment Improve this question Transcribed image text
Answer #1

Ansser Given data 8.5min B Flour, mikVarllaeg yolk and ga blend- 6.Sm into plend omin c)Fold d Bate eRemove om oven apply topGiven that Cycle time in minutes based on an outpt ot 30 SputHes pen evoning Produclion tne pen day Time yele 1 outpat pe daywoic Stations TO detemine the minimum numbes Theovelical Hinimuam dumbesy cOakstations of Sum of total task times gele Time TWatstations 2 D Activitics A Tlle time Corect .. opfon (a)s iv)- the 7. Balance Delay. To detesmine Balance Peloy = (x9-23-9)Thevefove from Opfions Option D 9minutes :4 kstatians 2 option C option 3 : В: 5-8Y option Ч: c: 94.2/ 5 option

Add a comment
Know the answer?
Add Answer to:
John is installing a production line in the kitchen of his successful restaurant “Light of the...
Your Answer:

Post as a guest

Your Name:

What's your source?

Earn Coins

Coins can be redeemed for fabulous gifts.

Not the answer you're looking for? Ask your own homework help question. Our experts will answer your question WITHIN MINUTES for Free.
Similar Homework Help Questions
  • Stanford Rosenberg Computing wants to establish an assembly line for producing a new product, the Personal...

    Stanford Rosenberg Computing wants to establish an assembly line for producing a new product, the Personal Digital Assistant (PDA). The tasks, task times, and immediate predecessors for the tasks are as follows: Task Immediate Predecessor A B с D E Time (sec) 12 14 8 5 18 A A B,C D Rosenberg's goal is to produce 180 PDAs per hour. a) The cycle time for the production of a PDA = 20.57 seconds (round your response to two decimal places)....

  • a) The cycle time for the production of a PDA = ____ seconds. b) The theoretical...

    a) The cycle time for the production of a PDA = ____ seconds. b) The theoretical minimum number of workstations that Rosenburg can achieve in this assembly line = ____. c) For one to assign the tasks to the actual workstations and be able to use the "theoretical minimum" number, the activity assignment should be: ??? d) Were you able to assign all the tasks to the theoretical minimum number of workstations? Yes or No. Stanford Rosenberg Computing wants to...

  • em 9.14 Question Help 3 per Sue Hains Appliances wants to establish an assembly line to...

    em 9.14 Question Help 3 per Sue Hains Appliances wants to establish an assembly line to manufacture its new product, the Micro Popcom Popper. The goal is to produce five poppers per hour The tasks, task times, and immediate predecessors for producing one Micro Popcorn Popper are as follows: estions: 3 Task tion 1 (0/1) А Performance Time Task Must Follow (mins Task Usted Below 10 12 А B 11 B,C 7 С 5 DE B D E F a)...

  • Problem Statement: A factory producing the new COVID-19 at-home testing kits is determining how to best...

    Problem Statement: A factory producing the new COVID-19 at-home testing kits is determining how to best line balance their production process. There are 12 steps to the production process, and they are presented below, along with their predecessors and how long it takes to complete each task. Assume all times are in minutes. This facility operates for 7 hours per day. Task C D E F G H I J K L A B Nil A B B B B...

  • Francis Johnson's plant needs to design an efficient assembly line to make a new product. The...

    Francis Johnson's plant needs to design an efficient assembly line to make a new product. The assembly line needs to produce 12 units per hour, and there is room for only five workstations. The tasks and the order in which they must be performed are shown in the following table. Tasks cannot be split, and it would be too expensive to duplicate any task. TASK TIME IMMEDIATE TASK (MINUTES) PREDECESSOR 2.5 2.0 2.0 3.0 3.0 3.0 3.0 A,B, C b....

  • 2. Show all the steps for the question to be worth any marks. The following table...

    2. Show all the steps for the question to be worth any marks. The following table presentss the tasks, durations, and immediate predecessors necessary to produce a particular Rroduct The required daily output is 320 units, and the working day is 8.0 hours on an assembly line. Immediate Predecessor Duration (in minutes) Activity A 0.9 B 0.7 C 0.8 Г E 0.4 В, с А, D E 0.5 0.4 G E 0.6 Н F, G 0.5 T 1.1 a. Draw...

  • Problem 6-22 Francis Johnson's plant needs to design an efficient assembly line to make a new...

    Problem 6-22 Francis Johnson's plant needs to design an efficient assembly line to make a new product. The assembly line needs to produce 24 units per hour, and there is room for only five workstations. The tasks and the order in which they must be performed are shown in the following table. Tasks cannot be split, and it would be too expensive to duplicate any task TASK TIME IMMEDIATE TASK (MINUTES) PREDECESSOR 1.0 1.0 2.5 1.5 A, B, C 1.5...

  • Wild Widget must set up an assembly line for widgets. Forecasts show that 68 units per...

    Wild Widget must set up an assembly line for widgets. Forecasts show that 68 units per hour should be produced. The tasks required, task times, and precedence relationships are as follows: TTT Task A B Time (seconds) 10 21 20 Predecessors A A 28 E 12 D 10 D G 40 E,F b. What is the takt time? (Round your answer to the nearest whole number.) Takt time seconds per unit c. What is the theoretical number of workstations? (Round...

  • The desired daily output for an assembly line is 540 units. This assembly line will operate...

    The desired daily output for an assembly line is 540 units. This assembly line will operate 729 minutes per day. The following table contains information on this product's task times and precedence relationships: TASK TASK TIME (SECONDS) IMMEDIATE PREDECESSOR A 30 — B 28 A C 18 B D 69 B E 34 A F 36 E G 42 C, D H 24 F, G b. What is the workstation cycle time? Cycle time seconds c. Balance this line using...

  • I need help with the total idle time per cycle question, please include steps with explanations...

    I need help with the total idle time per cycle question, please include steps with explanations & Problem 9.15 The Action Toy Company has decided to manufacture a new train set, the production of which is broken into six steps. T Question Help he demand for the train is 4,800 units p 40-hour workweek Performance Time Task Predecessors 20 27 B, C D.E 12 This exeroise only contains parts b, c, d, e, and f b) Given the demand, the...

ADVERTISEMENT
Free Homework Help App
Download From Google Play
Scan Your Homework
to Get Instant Free Answers
Need Online Homework Help?
Ask a Question
Get Answers For Free
Most questions answered within 3 hours.
ADVERTISEMENT
ADVERTISEMENT
ADVERTISEMENT