Question

Problem Statement: A factory producing the new COVID-19 at-home testing kits is determining how to best line balance their pr

0 0
Add a comment Improve this question Transcribed image text
Answer #1

A.

1587440787196_image.png

B.

Takt time = (7 * 60) minutes / 28 kites = 15 minutes per kit

C.

Sum of task times = 70 minutes

Number of workstations needed theoretically = Sum of task times / takt time = 70/15 = 4.7 or 5 stations.

D.

Station Remaining time Eligibles Was fit Assigned time Time remains Idle time
I 15 A A 12 3
3 B - - 3 3
II 15 B B 6 9
9 C, D, E, F C 6 3
3 D, E, F D 2 1
1 E, F, G - - 1 1
III 15 E, F, G F 12 3
3 E, G E 2 1
1 I, G I 1 0
0 G, J - - 0 0
IV 15 G, J G 7 8
8 H, J H 5 3
3 J - - 3 3
V 15 J J 4 11 1
11 K K 6 5
5 L - - 5 5
VI 15 L L 7 8 8

E.

Efficiency = Sum of all task times / (no. of stations * cycle time) = 70 / (6*15) = 77.78%

Add a comment
Know the answer?
Add Answer to:
Problem Statement: A factory producing the new COVID-19 at-home testing kits is determining how to best...
Your Answer:

Post as a guest

Your Name:

What's your source?

Earn Coins

Coins can be redeemed for fabulous gifts.

Not the answer you're looking for? Ask your own homework help question. Our experts will answer your question WITHIN MINUTES for Free.
Similar Homework Help Questions
  • Stanford Rosenberg Computing wants to establish an assembly line for producing a new product, the Personal...

    Stanford Rosenberg Computing wants to establish an assembly line for producing a new product, the Personal Digital Assistant (PDA). The tasks, task times, and immediate predecessors for the tasks are as follows: Task Immediate Predecessor A B с D E Time (sec) 12 14 8 5 18 A A B,C D Rosenberg's goal is to produce 180 PDAs per hour. a) The cycle time for the production of a PDA = 20.57 seconds (round your response to two decimal places)....

  • Problem 2: Workstation Assignment (8 points) A product has a takt time of 70 seconds and...

    Problem 2: Workstation Assignment (8 points) A product has a takt time of 70 seconds and the following precedence diagram. Task A 20 sec Task B 40 sec Task E 60 sec Task G 50 sec Task C 40 sec Task D 10 sec Task F 20 sec a) Assign tasks to workstations using the most following tasks" heuristic rule to break any ties. Show which tasks are assigned to each workstation (4 points) b) Assign tasks to workstations using...

  • Problem 2: Workstation Assignment (8 points) A product has a takt time of 70 seconds and...

    Problem 2: Workstation Assignment (8 points) A product has a takt time of 70 seconds and the following precedence diagram. Task A 20 sec Task B 40 sec Task E 60 sec Task G 50 sec Task C 40 sec Task D 10 sec Task F 20 sec a) Assign tasks to workstations using the "most following tasks" heuristic rule to break any ties. Show which tasks are assigned to each workstation (4 points). b) Assign tasks to workstations using...

  • QUESTION 37 A company is designing a product layout for a new product. It plans to...

    QUESTION 37 A company is designing a product layout for a new product. It plans to use this production line eight hours a day in order to meet a schedule of 400 units per day. The tasks necessary to produce this product are detailed in the table below. Task Predecessor Time (seconds) 50 А B А 20 С А 26 D 40 B, C C E 30 a. Draw the network described in the table. b. What is the required...

  • IBT Industrial Solutions produces forty units of rack and pinion type steering gears during an eight...

    IBT Industrial Solutions produces forty units of rack and pinion type steering gears during an eight hour work day. The tasks, times, and predecessor activities involved in the production process are given below. Task Time (minutes) Predecessor(s) A 2 - B 2 A C 8 - D 6 C E 3 B F 10 D, E G 4 F H 3 G a) Determine the cycle time. b) How many work stations are required to produce the forty units of...

  • I need help with the total idle time per cycle question, please include steps with explanations...

    I need help with the total idle time per cycle question, please include steps with explanations & Problem 9.15 The Action Toy Company has decided to manufacture a new train set, the production of which is broken into six steps. T Question Help he demand for the train is 4,800 units p 40-hour workweek Performance Time Task Predecessors 20 27 B, C D.E 12 This exeroise only contains parts b, c, d, e, and f b) Given the demand, the...

  • Answer questions 32-37, they are all oart of the same question Theres no more information provided,what...

    Answer questions 32-37, they are all oart of the same question Theres no more information provided,what are you asking for? Questions 32 to 37 refer to the following: The maker of the world-famous Chocolate Chip Cookies needs to design a product layout for a new product, Mint Chocolate Chip. The company plans to use this new production line eight hours a day in order to meet projected demand of 1,440 cases per day. The following table describes the tasks involved...

  • Hello, I need to see the solution, how they got these numbers? Will appreciate help. The...

    Hello, I need to see the solution, how they got these numbers? Will appreciate help. The Action Toy Company has decided to manufacture a new train set, the production of which is broken into six steps. The demand for the train is 4,600 units per 40-hour workweek: Predecessors Task A B С D E F Performance Time (seconds) 22 27 14 15 10 28 А A А B, C DE This exercise only contains parts b, c, d, e, and...

  • The operations manager of an instruments company is balancing an assembly line. The company needs to...

    The operations manager of an instruments company is balancing an assembly line. The company needs to build 96 instruments per 24-hour day. The assembly line activities are: a. Draw the precedence diagram. b. If the daily (24-hour) production rate is 96 units, what is the greatest possible cycle time? c. If the cycle time after allowances is given as 10 minutes, what is the daily (24-hour) production rate? d. With a 10-minute cycle time, what is the theoretical minimum number...

  • Question 2: (a) A Muscat Tools company manufactures toolkits and supplies to the local and overseas...

    Question 2: (a) A Muscat Tools company manufactures toolkits and supplies to the local and overseas market within the GCC region. In the assembly line, the kits are packed in the tool boxes. The company produces the specified demand rate of toolkit in 8 hours per daywithtasks, description of tasks, and time for each task shown in Table Q2a. (i) Draw the precedence diagram anddetermine the cycle time,and number of workstations; iii) Balance the line using the longest task time...

ADVERTISEMENT
Free Homework Help App
Download From Google Play
Scan Your Homework
to Get Instant Free Answers
Need Online Homework Help?
Ask a Question
Get Answers For Free
Most questions answered within 3 hours.
ADVERTISEMENT
ADVERTISEMENT
ADVERTISEMENT