Question 2 How much concrete (CY) is required for an 7 inch thick slab for a building with an 54 foot by 123 foot footprint?

0 0
Add a comment Improve this question Transcribed image text
Answer #1

2) Thickness = Tin = 7/12 Ft : Area = $548123 Fť? Volume = Thickness & Area = I x 54X123 = 3874.5 Ft 1 cubic Feet = 0.03703 T| 1 ft 3 = 0,0370 37631 c Vokeme of concrete = 85.5X0.037037037 = 3.167 CM 4 Thickness = 8 in Height =5ft, Footprint = 59x86

Add a comment
Know the answer?
Add Answer to:
Question 2 How much concrete (CY) is required for an 7 inch thick slab for a...
Your Answer:

Post as a guest

Your Name:

What's your source?

Earn Coins

Coins can be redeemed for fabulous gifts.

Not the answer you're looking for? Ask your own homework help question. Our experts will answer your question WITHIN MINUTES for Free.
Similar Homework Help Questions
  • 3 4657.3 12. 12. How many cubic yards of concrete are needed to pour a slab...

    3 4657.3 12. 12. How many cubic yards of concrete are needed to pour a slab 60' x 80' × 5" thick? 13. 13. How many gallons of paint are required to paint one side of a block wall of the following dimensions: 6'x 172? The paint being used will cover 200 ft per gallon. 14. 14. Compute the gallons of sealer required to seal a floor 120 x 250. The sealer being used will cover 175 ft per gallon....

  • The question is as follows:- Q) Design the concrete mixture for the slab

    The question is as follows:- Q) Design the concrete mixture for the slab 2. A reinforced slab concrete foundation is to be poured for a building. The building is to be constructed near Edmonton. The slab will be in direct contact with the soil, and the soil typically has a sulphate content of 0.3 percent by mass. The minimum rebar spacing in the slab is 100 mm. The contractor is certain that his workers can place a concrete with a...

  • 12. A slab on grade measures 120 long x 60" wide x 2' 6" thick. What is the cost to form the slab...

    12. A slab on grade measures 120 long x 60" wide x 2' 6" thick. What is the cost to form the slab if formwork costs S1 per square foot of contact area? A. $72 B.S90 C.S162 D.S180 13. A place concrete' activity requires the placement of 2,080 cubic yards. If the individual production rate is 2 cubic yards per workhour per person, with a 10-person crew and 8-hour workday, how many days are needed to complete this activity? A....

  • Could you please help me on question 7. Thank you very much. The floor system shown...

    Could you please help me on question 7. Thank you very much. The floor system shown below consists of normalweight concrete (150 pcf). Beams C2 ! LT 1 7.0 inch ! h=20 in G2! 12 in Girders BI 1 7.0 inch Slab 8 ft span h 24 in ----- - -- - --- 15 in 15 ft 15 ft Use 4000 psi concrete and Gr. 60 reinforcing steel. Assume 0.75 inch clear cover. Include concrete self-weight and a superimposed dead...

  • Auge Steel Framing Details 1. Complete all light g auge steel componente ir the following wall se...

    auge Steel Framing Details 1. Complete all light g auge steel componente ir the following wall section, including floor joists, wall studs, roof rafters, and required clips angles, stiffeners, and fasteners. Label all components. Roof sheathing Wall sheathing 。 Interior wallboard Subflooring Foundation 103 Scale: l square =2" (50 mm) Name: necessity of cutting holes in m on the construction ste 12.11. 12.15). Thack etions a sed for top and bottom plates, e construction, shemperature that col tural shapes. Prers...

ADVERTISEMENT
Free Homework Help App
Download From Google Play
Scan Your Homework
to Get Instant Free Answers
Need Online Homework Help?
Ask a Question
Get Answers For Free
Most questions answered within 3 hours.
ADVERTISEMENT
ADVERTISEMENT
ADVERTISEMENT