The total project budget consists of land, hard costs, soft costs and contingency. The contingency is 5% of total project budget excluding land. Land cost is $10, hard cost is $70 and soft cost is $15. What is the contingency, rounded to nearest penny?
Total project cost excluding land = 70+15 =85
Contingency =Project cost excluding land*contingency = 5%*85 = 4.25
The total project budget consists of land, hard costs, soft costs and contingency. The contingency is...
What is your YOC (%), spread (basis points), and is it worth developing economically? Assumptions: Market Rents are $5 NNN per square foot (psf) Land, Hard, Soft & Financing Costs total $70 psf Market Exit Cap Rates are 5%
Below is the time-phased baseline budget for a project and a table showing the progress as of End of Period 7. Baseline PV Task Total PV Time Period 0 1 2 3 4 5 6 7 8 9 10 11 A 30 15 15 B 40 20 20 C 80 10 10 10 10 20 20 D 30 5 5 5 5 10 E 20 5 5 5 5 F 40 10 20 5 5 G 10 5 5 PV...
1. Develop a project budget to add an unattached garage to your existing home. The garage will hold 3 cars, have a brick front and the remaining three sides will be wood. It will have electricity, two doors, two garage door openers, and will be heated. The project duration is six weeks. The project budget must list the project costs by week. The project budget should include labor costs for different skilled labor, material costs for different categories of material,...
Question 9 Below is the time phased baseline budget for a project and a table showing the progress as of End of Period 7. 2 Baseline PV Total Task Time Period PV 0 1 3 5 6 7 8 10 11 A 30 15 15 40 20 20 с 80 10 10 10 10 20 20 D 30 5 5 5 5 10 E 20 5 5 5 5 F 40 10 20 5 5 10 5 5 PV by...
Refer to the diagram to the right: Land is the other (fixed) factor of production. Currently the real wage is $15. Calculate the change in land rents due to a $5 increase in the real wage. - (Enter your response rounded to the nearest dollar. Be sure to include the minus sign if A Land rents = $ necessary.) Calculate the change to the total wage bill (total payment to labor). A Total payment to labor = $| (Enter your...
QUESTION 26/27 A mining engineer wishes to dig a tunnel from a point A lying in soft earth to a point B lying in hard bedrock. It costs c1 dollars per unit length to dig into the soft earth, and c2 dollars per unit length to dig into the bedrock. Where is it best to enter the bedrock to minimise costs? A-(0,a)e (a) (2 marks) Assume that A(0,a) and the point to reach is B-(bi.b2), as shown in the figure....
1- You are evaluating a capital project for equipment with a total installed cost of $750,000. The equipment has an estimated life of 30 years, with an expected salvage value at the end of the project of $50,000. The project will be depreciated via simplified straight-line depreciation method. In addition, a working capital investment of $5,000 is required. The project replaces an old piece of equipment which is currently in service and is fully depreciated, but has an expected after-tax...
Using the project budget template, prepare a budget for a project you are involved in. [Co-funder 1] [Co-funder 2] [Co-funder 3] [Co-funder 4] [Co-funder 5] Total External lacoat 100 Total INCOME 100 EXPENSES Amounts in $US SALARY SPECIFICATION: Haber Method of cost computation hours per Teck. I JUS an hour I Tecks Project staff manager Project coordinators) Administrative staff Technical production staff Financial coordinator Other Subto Specialists Consultant fees Accountant costs Bookkeeping costs Honoraris of lecturers Translation costs Other PR...
1. A firm is starting a new project that will cost $200,000. It is projected to last 5 years and to generate cash flows of $50,000, $70,000, $90,000, $50,000 and $30,000 from Years 1 through 5 respectively. If the discount rate is 10%, what is the EAA of this project? Round to the nearest penny. Do not include any unit such as $, %, etc. 2. Use the following information to answer next three questions: IO PI IRR LIFE Project...
4. Given the data and information that follow, compute the total direct cost for each project duration. If the indirect costs for each project duration are $90 (15 time units), $70 (14), $50 (13), $40 (12), and $30 (11), compute the total project cost for each duration. What is the optimum cost-time schedule for the project? What is this cost? Act. Crash Cost (Slope) Maximum Crash Time Normal Time Normal Cost WNUNUNAW OWLOI- 100 60 200 200 $730 Initial project...