Question

11. Management t wants to design an assembly line that will turn out 800 videotapes per day. There will be eight working hour
0 0
Add a comment Improve this question Transcribed image text
Answer #1

Answer: -

11) Given demand = 800 videotapes per day

Working time = 8 hours in minutes = 8*60 = 480 minutes

a) Minimum cycle time is nothing but the longest task time = 0.6 minutes

Maximum cycle time is nothing but total of task time = 2.3 minutes

b) Cycle time = Operating time / Output per day

= 480 minutes / 800 videotapes per day = 0.6 minutes

c) Minimum number of stations required = total task time / cycle time

= 2.3 minutes/0.6 minutes = 3.83 ~ 4 stations

12) Given cycle time = 5.1 minutes

For station 1 idle time = cycle time - station time = 5.1 - 4.2 = 0.9 minutes

For station 2 = 5.1 - 4.7 = 0.4 minutes

For station 3 = 5.1 - 4.4 = 0.7 minutes

For station 4 = 5.1 - 4.8 = 0.3 minutes

Sum of all idle times = 0.9 + 0.4 + 0.7 + 0.3 = 2.3 minutes

Percent idle time = total idle time / (n*cycle time)

= 2.3 minutes/(4*5.1 minutes) = 2.3 / 20.4 = 11.27%

13) True

14) Option"D" --- Remain the same

15) Option"A" --- The EOQ

Add a comment
Know the answer?
Add Answer to:
11. Management t wants to design an assembly line that will turn out 800 videotapes per...
Your Answer:

Post as a guest

Your Name:

What's your source?

Earn Coins

Coins can be redeemed for fabulous gifts.

Not the answer you're looking for? Ask your own homework help question. Our experts will answer your question WITHIN MINUTES for Free.
Similar Homework Help Questions
  • Agent Smith, operations manager at the Matrix franchise, faces assembly line balancing problems. He has been...

    Agent Smith, operations manager at the Matrix franchise, faces assembly line balancing problems. He has been told that the firm needs to assemble 1400 agents per day. There are 420 minutes of productive time in each working day. The assembly line activities are given below: Task Time (seconds) Predecessor A 13 - B 4 A C 10 B D 10 - E 6 D F 12 E G 5 E H 6 F, G I 7 H J 5 H...

  • Question d) The idle time for the assembly line per cycle = _____ minute(s) The Mach...

    Question d) The idle time for the assembly line per cycle = _____ minute(s) The Mach 10 is a one-person sailboat manufactured by Creative Leisure. The final assembly plant is in Cupertino, California. The assembly area is available for production of the Mach 10 for 200 minutes per day. (The rest of the time it is busy making other products.) The daily demand is 60 boats. Given the following information: Task Predecessors Performance Time (mins) 2. 1 1 A B...

  • 8. If a line is balanced with 80 percent efficiency, the "balance delay" will be: 20 percent. B. 80 pe...

    8. If a line is balanced with 80 percent efficiency, the "balance delay" will be: 20 percent. B. 80 percent. C. 100 percent. D. unknown, since balance delay is not related to efficieney. E. depends on the next operation. 9. A common goal in designing process layouts is: A. minimizing the number of workers. B. minimizing number of machines. minimizing transportation costs. maximizing workstation productive time E. maximizing transportation distances. 07) vnit 10. The maximum allowable cycle time is computed...

  • Please answer all parts of question number 3 and type them and bold or underline the...

    Please answer all parts of question number 3 and type them and bold or underline the correct answers Baker Mfg Inc. wishes to compare its inventory turnover to those of industry leaders, who have turnover of about 1313 times per year and 88 % of their assets invested in inventory.    Baker Mfg. Inc. Net Revenue $27 comma 50027,500 Cost of sales $19 comma 41019,410 Inventory $1 comma 2901,290 Total assets $17 comma 82017,820 a) What is Baker's inventory turnover?...

  • 10. Write a one-page summary of the attached paper? INTRODUCTION Many problems can develop in activated...

    10. Write a one-page summary of the attached paper? INTRODUCTION Many problems can develop in activated sludge operation that adversely affect effluent quality with origins in the engineering, hydraulic and microbiological components of the process. The real "heart" of the activated sludge system is the development and maintenance of a mixed microbial culture (activated sludge) that treats wastewater and which can be managed. One definition of a wastewater treatment plant operator is a "bug farmer", one who controls the aeration...

ADVERTISEMENT
Free Homework Help App
Download From Google Play
Scan Your Homework
to Get Instant Free Answers
Need Online Homework Help?
Ask a Question
Get Answers For Free
Most questions answered within 3 hours.
ADVERTISEMENT
ADVERTISEMENT
ADVERTISEMENT