I'm so sorry to say this, but we are not supposed to answer these many multiple questions at a time in a single post and neither you're supposed to post. Please post as a section of 4 to get them answered as HOMEWORKLIB Honor Code. Please understand my concern thank you. Please please post them separately as HOMEWORKLIB Rules.
11. In a product layout, the task of deciding how to assign work to specific stations is referred to as - line balancing
13. A service organization for example, a hospital is likely to use a process layout because of variability in customer processing requirements.
14. A tool that is not used for quality management is a redesign
15. SO 9000 currently requires continual improvement of a
certified organization.
8. If a line is balanced with 80 percent efficiency, the "balance delay" will be: 20 percent. B. 80 pe...
Case Study Demand Forecasting For an organization to provide customer delight it is important that organization can understand what customer wants and how much do they want. If an organization can gauge future demand that manufacturing plan becomes simpler and cost-effective. The process of analyzing and understanding current and past information to understand future patterns through a scientific and systemic approach is called forecasting. And the process of estimating the future demand of the product in terms of a unit...
Question 1- Assembly Line Balancing A ball-bearing assembly firm wants to set up an assembly line that must have an output of 60 units per hour. The work elements, task times and their precedence relationships are shown in Table 1: Table 1 Work Element Time (sec.) Immediate Predecessor(s) A 40 NONE B 30 A C 50 A D 40 B E 6 B F 25 C G 15 C H 20 D, E I 18 F, G J 30 H,...
18. The quality tool which helps focus on the most important problem areas based on the 80-20 rule is: A. brainstorming. B. check sheets. C. Pareto analysis. D. cause-and-effect diagrams. E. fail-safe methods. 19 A control chart used to monitor the process mean is the: A. p-chart. B. R-chart. C. x-bar chart. D. c-chart EGantt chart 20. The range chart (R-chart) is most likely to detect a change in: A. proportion. B mean. C. number defective. D. variability. E sample...
1. [Layout Strategy-Line Balancing] The call center department of Jax-steel company needs to service 3,000 calls per 40-hour workweek. The process of servicing calls can be broken down into the six stations listed above. The precedence and time requirements for each element are as follows in the table below. The manager wants a new operational analyst to draw and label a precedence diagram for the service process. Finally, the manager needs to balance the line, calculate the efficiency of the...
1.An assembly line consists of 3 tasks with individual times 5, 3, and 2 minutes and the cycle time of 5 minutes. Calculate the theoretical minimum number of workstations. Select one:A. 3 B. 2 C. 6 D. 5 E. Cannot be calculated with the given information 2.Which is true for product layout? Select one:A. Very flexible B. High job satisfaction C. Lower work-in-process inventories D. Easy to add new products 3.Which type of layout is best for high volumes of...
TASK SECONDS TASKS THAT MUST PRECEDE A 25 — B 15 A C 20 B D 29 B E 16 C F 8 D G 35 E, F H 32 G The workday is 10.5 hours long. Demand for completed product is 900 per day. a. Find the cycle time required to meet the desired output rate. (Round your answer to 1 decimal place.) b. What is the theoretical number of workstations required to meet the desired output rate? (Round...
DO NOT ANSWER AT ALL IF YOU ARE ONLY ANSWERING 5 QUESTIONS THANK YOU True or false Process design includes selecting the appropriate technology, sizing the process over time, determining the role of inventory in the process, and locating the process. Operations and supply chain strategy is concerned with setting broad policies and plans for using the resources of a firm and must be integrated with corporate strategy. "Social" pertains to fair and beneficial business practices toward labour, the community,...
23. Various financial data for SunPath Manufacturing for 2012 and 2013 follow. 2015 2016 Output: Sales $300,000 $330,000 Inputs: Labour $40,000 $43,000 Raw Materials: $45,000 $51,000 Energy: $10,000 $9,000 Capital $250,000 $262,000 Employed: Other: $2,000 $6,000 What is the percentage change in SunPath’s total productivity measure between 2015 and 2016? -9.22 2.33 -0.53 D. 2.88 E. 10.39 24. A company wants to generate a forecast for unit demand for year 2017 using exponential smoothing. The actual demand in year 2016...
3.1. The inventory turnover ratio used in measuring supply-chain efficiency is found by the ratio of which of the following? A. Cost of goods sold/Average aggregate inventory value B. Fixed costs/Variable costs C. Sales costs/Marketing costs D. Cost of goods sold/Cost to sell goods E. Operations flow costs/Suppliers flow costs 3.2. In designing a lean production facility layout a designer should do which of the following? A. Design for work flow balance B. Locate flexible workstations off line C. Link...
Answer questions 32-37, they are all oart of the same question Theres no more information provided,what are you asking for? Questions 32 to 37 refer to the following: The maker of the world-famous Chocolate Chip Cookies needs to design a product layout for a new product, Mint Chocolate Chip. The company plans to use this new production line eight hours a day in order to meet projected demand of 1,440 cases per day. The following table describes the tasks involved...