Question

1.An assembly line consists of 3 tasks with individual times 5, 3, and 2 minutes and...

1.An assembly line consists of 3 tasks with individual times 5, 3, and 2 minutes and the cycle time of 5 minutes. Calculate the theoretical minimum number of workstations.

Select one:A. 3 B. 2 C. 6 D. 5 E. Cannot be calculated with the given information

2.Which is true for product layout?

Select one:A. Very flexible B. High job satisfaction C. Lower work-in-process inventories D. Easy to add new products

3.Which type of layout is best for high volumes of demand with few if any setups/changeovers?

Select one:A. Product B. Process C. Cellular D. Fixed position

0 0
Add a comment Improve this question Transcribed image text
Answer #1

1. Answer: B (2)

Rationale:

Total task time (TT) = 5+3+2 = 10 minutes

Cycle time (CT) = 5 minutes

Theoretical number of workstations = TT/CT

Theoretical number of workstations = 10/5

Theoretical number of workstations = 2

2. Answer: C (Lower work-in-process inventories)

Rationale: Product layouts generally have lower flexibility and therefore it is not easy to add new products. Product layouts have lower job satisfaction because of lower motivation as compared to process and fixed position layout. Some of advantages of product layout include lower cost, higher output and lower work-in-process inventories.

3. Answer: A (Product)

Rationale: Product layouts are commonly found in flow shops which produce high-volume and highly standardized products that require repetitive and highly standardized processes.

Add a comment
Know the answer?
Add Answer to:
1.An assembly line consists of 3 tasks with individual times 5, 3, and 2 minutes and...
Your Answer:

Post as a guest

Your Name:

What's your source?

Earn Coins

Coins can be redeemed for fabulous gifts.

Not the answer you're looking for? Ask your own homework help question. Our experts will answer your question WITHIN MINUTES for Free.
Similar Homework Help Questions
  • 1.An assembly line with 28 activities is to be balanced. The total amount of time required...

    1.An assembly line with 28 activities is to be balanced. The total amount of time required for all 28 activities is 39 minutes. The longest activity is 2.2 minutes and the shortest is 0.8 minutes. The line will operate for 450 minutes per day. What is the assembly line efficiency with 11 stations and a product produced every 5 minutes? 2.An assembly line consists of 3 tasks with individual times 5, 3, and 2 minutes and the cycle time of...

  • Your assembly line with 5 tasks is to be balanced. The longest task takes 3.2 minutes...

    Your assembly line with 5 tasks is to be balanced. The longest task takes 3.2 minutes to complete, and the total time for all tasks is 16.8 minutes. The line operates 435 minutes per day. How many workstations are needed if management wants 925 units to be produced each day?

  • Stanford Rosenberg Computing wants to establish an assembly line for producing a new product, the Personal...

    Stanford Rosenberg Computing wants to establish an assembly line for producing a new product, the Personal Digital Assistant (PDA). The tasks, task times, and immediate predecessors for the tasks are as follows: Task Immediate Predecessor A B с D E Time (sec) 12 14 8 5 18 A A B,C D Rosenberg's goal is to produce 180 PDAs per hour. a) The cycle time for the production of a PDA = 20.57 seconds (round your response to two decimal places)....

  • An assembly line with 17 tasks is to be balanced. The longest task is 2.4 minutes, and the total time for all tasks is 1...

    An assembly line with 17 tasks is to be balanced. The longest task is 2.4 minutes, and the total time for all tasks is 18 minutes. The line will operate for 450 minutes per day. a. What are the minimum and maximum cycle times? (Round your answers to 1 decimal place.)    Minimum cycle time minutes Maximum cycle time minutes b. What range of daily output is theoretically possible for the line? (Round your answers to 1 decimal place. Enter the...

  • An assembly line with 17 tasks is to be balanced. The longest task is 2.4 minutes,...

    An assembly line with 17 tasks is to be balanced. The longest task is 2.4 minutes, and the total time for all tasks is 18 minutes. The line will operate for 450 minutes per day. a. What are the minimum and maximum cycle times? (Round your answers to 1 decimal place.)    Minimum cycle time minutes Maximum cycle time minutes b. What range of daily output is theoretically possible for the line? (Round your answers to 1 decimal place. Enter...

  • An assembly line with 17 tasks is to be balanced. The longest task is 2.3 minutes,...

    An assembly line with 17 tasks is to be balanced. The longest task is 2.3 minutes, and the total time for all tasks is 18 minutes. The line will operate for 490 minutes per day. a. What is the minimum number of workstations needed if the output rate is to be 170 units per day? (Round the final answer to the next whole number.) Number of workstation             b. What cycle time will provide an output rate of 126 units per...

  • em 9.14 Question Help 3 per Sue Hains Appliances wants to establish an assembly line to...

    em 9.14 Question Help 3 per Sue Hains Appliances wants to establish an assembly line to manufacture its new product, the Micro Popcom Popper. The goal is to produce five poppers per hour The tasks, task times, and immediate predecessors for producing one Micro Popcorn Popper are as follows: estions: 3 Task tion 1 (0/1) А Performance Time Task Must Follow (mins Task Usted Below 10 12 А B 11 B,C 7 С 5 DE B D E F a)...

  • Consider the following tasks, times, and predecessors for an assembly of set top cable converter boxes:...

    Consider the following tasks, times, and predecessors for an assembly of set top cable converter boxes: TASK ELEMENT TIME (MINUTES) ELEMENT PREDECESSOR A 2 — B 1 A C 5 B D 4 B E 3 C, D F 3 A G 2 F H 1 G I 4 E, H Given a cycle time of seven minutes, what is the efficiency of your layout? Use the longest task time as primary criterion with largest number of following tasks as...

  • a) The correct precedence relationship with one of the possible assignment of tasks to workstations is...

    a) The correct precedence relationship with one of the possible assignment of tasks to workstations is shown in ? b) What is the operating efficiency of the assembly​ line, using your answer to​ (a)? c) What is the theoretical minimum number of​ workstations? d) What is the idle time per boat​ produced? IOIIGWufk. Cny Score: 0 of 1 pt Problem 9.18 Assembly Line Balancing 10 of 11 (6 complete) HW Score: 54.55%, 6 of 11 Question Holp The final assembly...

  • Question d) The idle time for the assembly line per cycle = _____ minute(s) The Mach...

    Question d) The idle time for the assembly line per cycle = _____ minute(s) The Mach 10 is a one-person sailboat manufactured by Creative Leisure. The final assembly plant is in Cupertino, California. The assembly area is available for production of the Mach 10 for 200 minutes per day. (The rest of the time it is busy making other products.) The daily demand is 60 boats. Given the following information: Task Predecessors Performance Time (mins) 2. 1 1 A B...

ADVERTISEMENT
Free Homework Help App
Download From Google Play
Scan Your Homework
to Get Instant Free Answers
Need Online Homework Help?
Ask a Question
Get Answers For Free
Most questions answered within 3 hours.
ADVERTISEMENT