a. Both Fig 2 and 3 follow the precedence relationship. How ever, fig 3 only qualified for the workstation assignment based on the cycle time.
b. Efficiency= total of task times/(number of work station* cycle time)= 14/(3*5)= 93%.
c. Theoretical cycle time= available time/ output= 300/58= 5.11
Number of work station= Total of task times/ cycle time= 14/5.11= 2.73= 3 work stations.
d. Idle time is on work station 3= 1 minute.
e. For 400 minutes available, Cycle time= 400/58= 6.89.
Number of work stations= total of task times/ cycle time= 14/6.89= 2.03= 3 work stations.
f. Efficiency for this case= Total of task times/ (Number of work stations* cycle time)= 14/(3*6.89)= 66.67%.
a) The correct precedence relationship with one of the possible assignment of tasks to workstations is...
Question d) The idle time for the assembly line per cycle = _____ minute(s) The Mach 10 is a one-person sailboat manufactured by Creative Leisure. The final assembly plant is in Cupertino, California. The assembly area is available for production of the Mach 10 for 200 minutes per day. (The rest of the time it is busy making other products.) The daily demand is 60 boats. Given the following information: Task Predecessors Performance Time (mins) 2. 1 1 A B...
J Packing 2.0 a-b) One of the possible assignment of tasks to workstations is shown correctly in Fig. 2. The efficiency of the assembly line with 3 workstations = 98.28 % (enter your response rounded to two decimal places). c) The goal is to have 100% efficiency. Is this possible? No d) The theoretical minimum number of workstations = 3 (round your response up to the next whole number). Teen The following table details the tasks required for Indiana-based Frank...
Tailwind, Inc, produces high-quality but expensive training shoes for runners. The Tailwind shoe, which sells for $210, contains both gas- and liquid filed compartments to provide more stability and better protection against knee, foot, and back injuries Manufacturing the shoes requires 10 separate tasks. There are 400 minutes available for manufacturing the shoes in the plant each day. Daily demand is 62. The information for the tasks is as follows Task Performance Time (mins) Predecessors <UO a-b) The correct precedence...
The Mach 10 is a one-person sailboat manufactured by Creative Leisure. The final assembly plant is in Cupertino, California. The assembly area is available for production of the Mach 10 for 200200 minutes per day. (The rest of the time it is busy making other products.) The daily demand is 6060 boats. Given the following information: Task Performance Time (mins) Predecessors A 22 minus− B 22 A C 11 A D 11 C E 33 C F 11 C...
Question 2 (20%): A precedence table is given below for a process with 6 tasks, their immediate predecessors and their task times: Immediate Task time label predecessors minutes) 2.0 1.5 2.0 3.0 15 2.0 Daily working time is 14 hours. The daily output need is 210 piece a) Draw the relationship structure of these tasks? 8) Calculate the cycle sims? Use the line balancing technique to determine the number of stations and arrange these tasks to each station? Calculate the...
em 9.14 Question Help 3 per Sue Hains Appliances wants to establish an assembly line to manufacture its new product, the Micro Popcom Popper. The goal is to produce five poppers per hour The tasks, task times, and immediate predecessors for producing one Micro Popcorn Popper are as follows: estions: 3 Task tion 1 (0/1) А Performance Time Task Must Follow (mins Task Usted Below 10 12 А B 11 B,C 7 С 5 DE B D E F a)...
Problem 2: Workstation Assignment (8 points) A product has a takt time of 70 seconds and the following precedence diagram. Task A 20 sec Task B 40 sec Task E 60 sec Task G 50 sec Task C 40 sec Task D 10 sec Task F 20 sec a) Assign tasks to workstations using the most following tasks" heuristic rule to break any ties. Show which tasks are assigned to each workstation (4 points) b) Assign tasks to workstations using...
Problem 2: Workstation Assignment (8 points) A product has a takt time of 70 seconds and the following precedence diagram. Task A 20 sec Task B 40 sec Task E 60 sec Task G 50 sec Task C 40 sec Task D 10 sec Task F 20 sec a) Assign tasks to workstations using the "most following tasks" heuristic rule to break any ties. Show which tasks are assigned to each workstation (4 points). b) Assign tasks to workstations using...
on Man HW Score: 2965 Score: 0 of 1 pt 3 of 3 (1 complete) Problem 9.16 Industries to manufacture a fully portable industrial vacuum cleaner. The times in the table are in minutes. Demand forecasts indicate a need to operate with a cycle time of 10 minutes. Test Performance Predecessors Activity Activity Description Time (min) Predecessors A Attach wheels to tub B Attach motor to lid C Attach battery pack D Attach safety cutoff E Attach filters F Attach...
Hello, I need to see the solution, how they got these numbers? Will appreciate help. The Action Toy Company has decided to manufacture a new train set, the production of which is broken into six steps. The demand for the train is 4,600 units per 40-hour workweek: Predecessors Task A B С D E F Performance Time (seconds) 22 27 14 15 10 28 А A А B, C DE This exercise only contains parts b, c, d, e, and...