Your assembly line with 5 tasks is to be balanced.

The longest task takes 3.2 minutes to complete, and the total time for all tasks is 16.8 minutes. The line operates 435 minutes per day.

How many workstations are needed if management wants 925 units to be produced each day?

0 0
Add a comment Improve this question Transcribed image text
Answer #1

Minimum cycle time of the line (Length of longest task) = 3.2 minutes

Maximum cycle time of the line = 16.8 minutes

Number of workstations needed for 925 units (considering mini. cycle time) = 925 * 3.2 / 435 =6.80 or 7 workstations

Add a comment
Know the answer?
Add Answer to:
Your assembly line with 5 tasks is to be balanced. The longest task takes 3.2 minutes...
Your Answer:

Post as a guest

Your Name:

What's your source?

Earn Coins

Coins can be redeemed for fabulous gifts.

Not the answer you're looking for? Ask your own homework help question. Our experts will answer your question WITHIN MINUTES for Free.
Similar Homework Help Questions
  • An assembly line with 17 tasks is to be balanced. The longest task is 2.3 minutes,...

    An assembly line with 17 tasks is to be balanced. The longest task is 2.3 minutes, and the total time for all tasks is 18 minutes. The line will operate for 490 minutes per day. a. What is the minimum number of workstations needed if the output rate is to be 170 units per day? (Round the final answer to the next whole number.) Number of workstation             b. What cycle time will provide an output rate of 126 units per...

  • An assembly line with 17 tasks is to be balanced. The longest task is 2.4 minutes,...

    An assembly line with 17 tasks is to be balanced. The longest task is 2.4 minutes, and the total time for all tasks is 18 minutes. The line will operate for 450 minutes per day. a. What are the minimum and maximum cycle times? (Round your answers to 1 decimal place.)    Minimum cycle time minutes Maximum cycle time minutes b. What range of daily output is theoretically possible for the line? (Round your answers to 1 decimal place. Enter...

  • An assembly line with 17 tas ks is to be balanced. The longest task is 2.4...

    An assembly line with 17 tas ks is to be balanced. The longest task is 2.4 minutes, and the total time for all tasks is 17 minutes. The line will operate for 474 minutes per day. a. What is the OT? minutes minutes b. What is the minimum cycle time? c. What is the maximum cycle time? minutes d. What is the range of output that is theoretically possible for the line? to units e. What is the minimum number...

  • An assembly line with 17 tasks is to be balanced. The longest task is 2.4 minutes, and the total time for all tasks is 1...

    An assembly line with 17 tasks is to be balanced. The longest task is 2.4 minutes, and the total time for all tasks is 18 minutes. The line will operate for 450 minutes per day. a. What are the minimum and maximum cycle times? (Round your answers to 1 decimal place.)    Minimum cycle time minutes Maximum cycle time minutes b. What range of daily output is theoretically possible for the line? (Round your answers to 1 decimal place. Enter the...

  • 1.An assembly line with 28 activities is to be balanced. The total amount of time required...

    1.An assembly line with 28 activities is to be balanced. The total amount of time required for all 28 activities is 39 minutes. The longest activity is 2.2 minutes and the shortest is 0.8 minutes. The line will operate for 450 minutes per day. What is the assembly line efficiency with 11 stations and a product produced every 5 minutes? 2.An assembly line consists of 3 tasks with individual times 5, 3, and 2 minutes and the cycle time of...

  • The following tasks are to be performed on an assembly line: TASK SECONDS TASKS THAT MUST...

    The following tasks are to be performed on an assembly line: TASK SECONDS TASKS THAT MUST PRECEDE A 18 — B 10 A C 25 B D 15 B E 14 C F 17 D G 12 E, F H 20 G The workday is 6.25 hours long. Demand for completed product is 750 per day. a. Find the cycle time required to meet the desired output rate. (Round your answer to 1 decimal place.) b. What is the theoretical...

  • Swoosh Snowboard Company must set up an assembly Ins for snowboards. Forecasts show that 600 units...

    Swoosh Snowboard Company must set up an assembly Ins for snowboards. Forecasts show that 600 units per day shou id be produced . The plant operates two eigt-hour sihits esch day and runs the Ine conbnuoushy durnng both shits. The 1asks requred, task times, and precedence relationships are as folows 27 26 60 C, E.F b. What is the tek: time? c. What is the thearetical number of workstations? Round up your answer to the next whole numbar.) d. Assign...

  • This problem is similar to Alt-Cat 8.2 and 8.3. An assembly line is to be designed...

    This problem is similar to Alt-Cat 8.2 and 8.3. An assembly line is to be designed to operate 9.5 hours per day and supply a steady demand of 450 units per day. Here are the tasks and their performance times: PERFORMANCE PRECEDING TASK PERFORMANCE TIME (SECONDS) 25 30 15 10 40 20 PRECEDING TASK TASKS TIME (SECONDS) TASK 56 40 38 15 39 20 h,i j, k b. What is the workstation cycle time? Hint: draw the diagram first. tion...

  • Wild Widget must set up an assembly line for widgets. Forecasts show that 68 units per...

    Wild Widget must set up an assembly line for widgets. Forecasts show that 68 units per hour should be produced. The tasks required, task times, and precedence relationships are as follows: TTT Task A B Time (seconds) 10 21 20 Predecessors A A 28 E 12 D 10 D G 40 E,F b. What is the takt time? (Round your answer to the nearest whole number.) Takt time seconds per unit c. What is the theoretical number of workstations? (Round...

  • Francis Johnson's plant needs to design an efficient assembly line to make a new product. The...

    Francis Johnson's plant needs to design an efficient assembly line to make a new product. The assembly line needs to produce 12 units per hour, and there is room for only five workstations. The tasks and the order in which they must be performed are shown in the following table. Tasks cannot be split, and it would be too expensive to duplicate any task. TASK TIME IMMEDIATE TASK (MINUTES) PREDECESSOR 2.5 2.0 2.0 3.0 3.0 3.0 3.0 A,B, C b....

ADVERTISEMENT
Free Homework Help App
Download From Google Play
Scan Your Homework
to Get Instant Free Answers
Need Online Homework Help?
Ask a Question
Get Answers For Free
Most questions answered within 3 hours.
ADVERTISEMENT
ADVERTISEMENT
Active Questions
ADVERTISEMENT