Name Net ID Date: 3. For the pipe system illustrated below A. For the pipes, complete...
Net ID Date. Name 3. For the pipe system illustrated below A. For the pipes, complete the following table (compute the head losses, flows and velocities for pipes B and C) IA(fn -tales 215001018이 (in) A(t)Q(fs) 8 0.34907 60.19635 4 0.08727 Pipe 6.188 002 8.926 6000 11000」 9000 4000 002 0 02 0.34907 2.1599 6.188002 5 951 B. Compute the pressure (in psi) at junction J-1 (at an elevation of 270 t). WSE 300 ft f-0.02 all lines B. EL...