Net ID Date. Name 3. For the pipe system illustrated below A. For the pipes, complete the followi...
Name Net ID Date: 3. For the pipe system illustrated below A. For the pipes, complete the following table (compute the head losses flows and velocities for pipes B and C) Pipe L(t) D (in) A (ft) 8 0.34907 6 0.19635 4 0.08727 80.34907 Q (cfs) 2.1599 6,188 002 8 926 11000 0.02 0.02 2.1599 6.188 002 5951 4000 B. Compute the pressure (in psi) at junction J-1 (at an elevation of 270 WSE 300 ft f-o 02 all lines...