Dynamic climbing ropes are designed to be quite pliant, allowing a falling climber to slow down over a long distance. The gra

0 0
Add a comment Improve this question Transcribed image text
Answer #1

sono stress ss - F/A is modulus LY) = = strain 1 Fain) st sain strain Where A = Area = IT (8/2)2 = T(x10 m ² = 9.50xlos F =

Add a comment
Know the answer?
Add Answer to:
Dynamic climbing ropes are designed to be quite pliant, allowing a falling climber to slow down...
Your Answer:

Post as a guest

Your Name:

What's your source?

Earn Coins

Coins can be redeemed for fabulous gifts.

Not the answer you're looking for? Ask your own homework help question. Our experts will answer your question WITHIN MINUTES for Free.
Similar Homework Help Questions
  • Climbing ropes stretch when they catch a falling climber, thus increasing the time it takes the...

    Climbing ropes stretch when they catch a falling climber, thus increasing the time it takes the climber to come to rest and reducing the force on the climber. In one standardized test of ropes, an 80 kg mass falls 4.8 m before being caught by a 2.5-m-long rope. If the net force on the mass must be kept below 11 kN, what is the minimum time for the mass to come to rest at the end of the fall? PartA...

  • Climbing ropes stretch when they catch a falling climber, thus increasing the time it takes the...

    Climbing ropes stretch when they catch a falling climber, thus increasing the time it takes the climber to come to rest and reducing the force on the climber. In one standardized test of ropes, an 80 kg mass falls 4.8 m before being caught by a 2.5-m-long rope. If the net force on the mass must be kept below 11 kN, what is the minimum time for the mass to come to rest at the end of the fall?

ADVERTISEMENT
Free Homework Help App
Download From Google Play
Scan Your Homework
to Get Instant Free Answers
Need Online Homework Help?
Ask a Question
Get Answers For Free
Most questions answered within 3 hours.
ADVERTISEMENT
ADVERTISEMENT
ADVERTISEMENT