A 7-cy wheel loader will be used to load a crusher from a quarry stockpile of...
#5) Find the load time if a 2 LCY articulated wheel loader transfers average material from a stockpile to 18 CY trucks. Assume that volume controls and that travel time can be neglected. Assume that the average material fill factor is 90%and the loader production is at 100% efficiency #6) If a project has an estimated production of 400 LCY/hr., find the number of haulers needed (N) if the load time is determined to be 3 minutes and the truck...
9.5 A shovel having a 5-cy bucket whose cost per hour, including the wages to an operator, is $96 will excavate well-blasted rock and load haul units under each of the stated conditions. The maximum digging height of the machine is 35 ft. Determine the cost per cubic yard for each condition Condition Height of excavation (ft) Angle of swing (degrees) Efficiency factor (min per hr45 10 60 18 90 40 24 120 30 28 150 45
Please solve problem 1 and show formulas used
Tables for reference:
Homework 6- Chapter 9 Problem 1: A crawler hoe having a 2 -cy bucket and whose cost per hour, including the wages to an operator, is $109 will excavate and load haul units under each of the stated conditions. The maximum digging depth of the machine is 22 ft. Determine the cost per bank cubic yard for each condition. (Condition 1: 315 bey/hr, S0.346/bcy; condition 2: 289 bey/hr, S0.377/bcy;...
(50) 7. Analyze the following operation. A 385C Excavator will be used to load material into a CAT 740 (no ejector) articulated truck. The excavator is equipped with a 6 cy heaped bucket and is capable of cycling every 30 seconds. The material being loaded weighs 3,300 lbs cy. The job efficiency is 90%. The trucks will be hauling the nmaterial 4000 feet over a road with a total rolling resistance of 9% to the dumpsite and 10% total rolling...