Question

Station B1 Run Time = 80 sec/unit C/O = 0 Station A Station C Run time = 35 sec/unit C/O = 0 Run Time = 38 sec/unit C/O = 0 S

0 0
Add a comment Improve this question Transcribed image text
Answer #1

Labor content total=35+80+80+38=233 secs

Total idel time = 0+0+0+0 =0secs

Labot utilization = [233/(233+0)] *100 = 100%

N=2 the utilization will be 233/116.5 (Idle time becomes half)=200%

N=6 =37.4%

N=12 =23%

Add a comment
Know the answer?
Add Answer to:
Station B1 Run Time = 80 sec/unit C/O = 0 Station A Station C Run time...
Your Answer:

Post as a guest

Your Name:

What's your source?

Earn Coins

Coins can be redeemed for fabulous gifts.

Not the answer you're looking for? Ask your own homework help question. Our experts will answer your question WITHIN MINUTES for Free.
Similar Homework Help Questions
  • B1 Run Time = 80 sec/unit Station C Station ACo- /O = 170 sec Run time...

    B1 Run Time = 80 sec/unit Station C Station ACo- /O = 170 sec Run time = 35 sec/unit CO = 72 sec Run Time 38 sec/unit CO 80 sec Station B2 Run Time = 80 sec/unit C/O 170 sec For the process shown above, calculate the raw processing times (in seconds) for the following batch sizes: N=2 N-6 N 12 Raw processing times (enter whole numbers)

  • 1. A flexible manufacturing cell consists of two machining workstations plus a load/unload station. The load/unload...

    1. A flexible manufacturing cell consists of two machining workstations plus a load/unload station. The load/unload station is station 1 with one server (human worker). Station 2 consists of one CNC machining center. Station 3 has one CNC drill press. The three stations are connected by a part-handling system that has one work carrier. The mean transport time is 2.0 min. The FMC produces three parts, A, B, and C. The part mix fractions and process routings for the three...

  • Question 9 1 pts Costs per unit (dollars per unit) o 20 40 60 80 Quantity...

    Question 9 1 pts Costs per unit (dollars per unit) o 20 40 60 80 Quantity (units per day) In the figure above, when 40 units are produced the average fixed cost is $8 O $12 $20 ОО $4 Question 10 1 pts When marginal cost is greater than average total cost, O average total cost is falling. O average total cost is rising. O marginal cost must be falling. O average variable cost must be falling. Question 11 1...

  • 1. What is the fastest a rush order of one unit can go through the process?...

    1. What is the fastest a rush order of one unit can go through the process? 2. Working 8 hours a day, what is the daily capacity of the process? 3. What is the labor content of a unit? 3. For this question consider hiring another worker and duplicating Operation D as shown in the diagram below. The two workers work on successive products; they don't work on the same product at the same time. The product still requires the...

  • Atlas Inc. is a toy bicycle manufacturing company producing a five inch small version of the...

    Atlas Inc. is a toy bicycle manufacturing company producing a five inch small version of the bike that Lance Armstrong rode to win his first Tour de France. The assembly line at Atlas Inc. consists of seven work stations, each performing a single step. Stations and processing times are summarized here: Step 1 (50 sec.): The plastic tube for the frame is cut to size. Step 2 (40 sec.): The tube is put together. Step 3 (55 sec.): The frame...

  • The three-station work cell illustrated in the figure below has a product that must go through...

    The three-station work cell illustrated in the figure below has a product that must go through one of the two machines at station 1 (they are parallel) before proceeding to station 2. a) The bottleneck time of the system is 6 minutos per unit (onitor your response as a whole number). b) Station 3 is the bottleneck station c) The throughout time is 13 minutes (onter your response as a whole number). d) If the firm operates 8 hours per...

  • o Consider the renction 2A(g) + B(g) + 2(g) 2D(8) E(s) Suppose at time =0, the...

    o Consider the renction 2A(g) + B(g) + 2(g) 2D(8) E(s) Suppose at time =0, the partial pressures of the reactant gases are 5 atm A, 10 atm B, and 8 atm C. After 20 minutes the partial pressure of A was found to be 1 atm. a) What is the initial total pressure in the flask at time=0? Bus P + P +++ b) What is the total pressure inside the flask after 20 minutes? Set up a start,...

  • Question 1 (1 point) 1. The short run is a period of time in which the...

    Question 1 (1 point) 1. The short run is a period of time in which the amount of output is fixed. nothing the firm does can be altered. the quantity of at least one factor of production is fixed. prices and wages are fixed. Question 2 (1 point) 2. When the demand for electricity peaks during the hottest days of summer, Florida Power and Light Company can generate more electricity by using more fuel and increasing the working hours of...

  • Help Save Saw Homework Asas Inc. is a toy bicycle manufacturing company producing a five-inch small...

    Help Save Saw Homework Asas Inc. is a toy bicycle manufacturing company producing a five-inch small version of the bike that Lance Armstrong rode to win his first Tour de France. The assembly line at Atlas Inc. consists of seven workstations, each performing a single step. Stations and processing times are summarized here: • Step 1 (30 sec.) The plastic tube for the frame is cut to size. . Step 2 125 sec.) The tube is put together Step 3...

  • time size weather strike subs 35 60 7 0 7 21 80 10 0 8 62...

    time size weather strike subs 35 60 7 0 7 21 80 10 0 8 62 100 8 1 10 12 50 14 0 5 72 200 12 1 11 16 50 4 0 3 83 500 15 1 12 36 75 5 0 6 46 750 10 0 10 97 1200 20 1 12 7 70 5 0 3 23 80 3 0 6 30 300 8 0 8 56 2600 14 1 13 35 110 7 0 4...

ADVERTISEMENT
Free Homework Help App
Download From Google Play
Scan Your Homework
to Get Instant Free Answers
Need Online Homework Help?
Ask a Question
Get Answers For Free
Most questions answered within 3 hours.
ADVERTISEMENT
ADVERTISEMENT
ADVERTISEMENT