1. Maximum output of stage 1 =2 x 30 units = 60 units per hour
Maximum output of stage 2 = 1 x 2 units = 2 per hour
Maximum output of stage 3 = 1 x4 = 4 per hour
(a) Bottleneck resource is station 2 which has output of 2 per hour
Bottleneck cycle time = 60/2 =30 minutes
(b) Station 2 is bottleneck station
(c) Throughput time = sum of time taken by all processes = 60/30+60/2+60/4 = 2 +30+15 = 47 minutes
(d) Weekly output = 40x2 = 80 per week.
Note : As per policies I can answer first 4 parts of a question. Inconvenience is regretted.
The three-station work cell illustrated in the figure below has a product that must go through...
re: 0 of 1 pt 9 of 9 (8 complete) HW Score: 66.67%, 6 of roblem S7.32 Question Help James Lawson's Bed and Breakfast, in a small historic Mississippi town, must decide how to subdivide (remodel) the large old home that will become its inn. There are three alternatives: Option A would modernize all baths and combine rooms, leaving the inn with four suites, each suitable for two to four adults. Option B would modernize only the second floor, the...
The three stations work cell illustrated in the figure below has a product that must go through one of the two machines at station 1 ( they are parallel) before proceeding to station 2 Capacity:30 units/hrs Station 1 Machine A Station 1 Machine B Capacity:30 units / hrs Station 2 Capacity 12 units/hrs Station 3 Capacity 4 units/hrs A) The bottleneck time of the system is .......minutes per unit ( enter your response as whole number) B) Station 1 or...
A production process at Kenneth Day Manufacturing is shown in the figure below. The drilling operation occurs separately from, and simultaneously with the sawing and sanding, which are independent sequential operations. A product needs to go through only one of the three assembly operations (the operations are in parallel). Q 2.5 units.hr 1.8 units/hr Assembly a Sawing 0.8 units/hr Sanding Welding 5 units/hr Assembly 0.8 units/hr Driling 5 units.hr Assembly 0.8 units/hr a) Sanding is the bottleneck b) The bottleneck...
A production process at Kenneth Day Manufacturing is shown in the figure below. The drilling operation occurs separately from, and simultaneously with the sawing and sanding, which are independent sequential operations. A product needs to go through only one of the three assembly operations (the operations are in parallel). Q 2.5 units/hr Sawing 2.1 units/he Sanding Assembly 0.8 unitsthe Welding 6 units.hr Assembly 0.8 units Drilling 5 unitshe Assembly 0.8 untui is the bottleneck 0.7 units/hr a) Drilling is the...
NEED ANSWER D. The Pullman Mfg., Inc. three-station work cell illustrated in the figure below has two machines at station 1 in parallel. (The product needs to go through only one of the two machines before proceeding to station 2.) 12 min/unit Station 1 Machine A Station 2 Station 3 5 min/unit 12 min/unit Station 1 Machine B 12 min/unit The manager, Ms. Hartley, has asked you to evaluate the system if she adds a parallel machine at station 3....
Problem 7.1 Question Help Borges Machine Shop, Inc., has a 1-year contract for the production of 200,000 gear housings for a new off-road vehicle. Owner Luis Borges hopes the contract will be extended and the volume increased next year. Borges has developed costs for three alternatives. They are general-purpose equipment (GPE), flexible manufacturing system (FMS), and expensive, but efficient, dedicated machine (DM). The cost data follow: Annual contracted units Annual fixed cost Per unit variable cost General Purpose Equipment (GPE)...
Can someone help me with bumber 3? i do not know if i did it right, i also dont know how to find 3. d. 3. A production process at Kenneth Day Manufacturing is shown in the figure below. The drilling operation occurs separately from, and simultaneously with the sawing and sanding, which are independent sequential operations. A product needs to go through only one of the three assembly operations (the operations are in parallel). 60/24-25min 60/2 = 30 min...
1. The bottleneck time of the system is - ??? minutes per unit (enter your response as a whole number). 2. Which Station (1, 2, or 3) is the bottle neck station? 3. The throughput time is - ?????? 4. If the firm operates 11 hours per? day, 5 days per? week, the weekly capacity of this work cell is?....... units? (enter your response as a whole? number). The three-station work cell illustrated in the figure below has a product...
What is the process time of the system? b) What is the bottleneck time of this work cell? c)What is the process cycle time? d) If the firm operates 10 hours per day, 5 days per week, what is the weekly capacity of this work cell? The three-station work cell illustrated in the figure below has a product that must go through one of the two machines at station 1 (they are parallel) before proceeding to station 2. o Capacity:...
The Goodparts Company produces a component that is subsequently used in the aerospace industry. The component consists of three parts (A, B, and C) that are purchased from outside and cost 40, 35, and 15 cents per piece, respectively. Parts A and B are assembled first on assembly line 1, which produces 155 components per hour. Part C undergoes a drilling operation before being finally assembled with the output from assembly line 1. There are in total six drilling machines,...