let consider stage1 is sawing therefore process rate = 2.5 units/hr therefore throughput time = 60/2.5 = 24 minutes
let consider stage2 is sanding and drilling therefore process rate = 5 units/hr + 2.1 units/hr = 7.1 units/hr therefore throughput time = 60/7.1 = 8.45 minutes
let consider stage3 is welding therefore process rate = 6 units/hr therefore throughput time = 60/6 = 10 minutes
let consider stage4 is assembly therefore process rate = (3 * 0.8 = 2.4) units/hr therefore throughput time = 60/2.4 = 25 minutes
since assembly consumes the highest time therefore it is bottleneck stage.
a) Assembly is the bottleneck
b) the bottleneck time is 25 minutes
c) throughput time = time of bottleneck step = 25 minutes
d) if the firm operates 8 hours per day , 20 days per month then monthly capacity
= 8 hour * 60 minutes * 20 days / throughput time
= 9600 / 25
= 384 units
A production process at Kenneth Day Manufacturing is shown in the figure below. The drilling operation...
A production process at Kenneth Day Manufacturing is shown in the figure below. The drilling operation occurs separately from, and simultaneously with the sawing and sanding, which are independent sequential operations. A product needs to go through only one of the three assembly operations (the operations are in parallel). Q 2.5 units.hr 1.8 units/hr Assembly a Sawing 0.8 units/hr Sanding Welding 5 units/hr Assembly 0.8 units/hr Driling 5 units.hr Assembly 0.8 units/hr a) Sanding is the bottleneck b) The bottleneck...
Can someone help me with bumber 3? i do not know if i did it right, i also dont know how to find 3. d. 3. A production process at Kenneth Day Manufacturing is shown in the figure below. The drilling operation occurs separately from, and simultaneously with the sawing and sanding, which are independent sequential operations. A product needs to go through only one of the three assembly operations (the operations are in parallel). 60/24-25min 60/2 = 30 min...
The three-station work cell illustrated in the figure below has a product that must go through one of the two machines at station 1 (they are parallel) before proceeding to station 2. a) The bottleneck time of the system is 6 minutos per unit (onitor your response as a whole number). b) Station 3 is the bottleneck station c) The throughout time is 13 minutes (onter your response as a whole number). d) If the firm operates 8 hours per...
A production process Kenneth Day Manufacturing is shown in the rebelow. Thengertion go through only one of the three assembly operations (the operations are in parte tod a y the wing and wegende Aroute to round your The botenecke mi t The Proughout time of the overall system a n d you to be
The following diagram describes a process that consists of eight separate operations, with sequential relationships and capacities (units per hour) as shown below. Operation A:13/hr > Operation B:11/hr > Operation C:19/hr > Operation G:28/hr > Operation H:19/hr Operation D:3/hr > Operation E:6/hr > Operation F: 10/hr > What is the throughput time (in minutes)? *Keep at least 4 decimal places in your calculation.
What is the process time of the system? b) What is the bottleneck time of this work cell? c)What is the process cycle time? d) If the firm operates 10 hours per day, 5 days per week, what is the weekly capacity of this work cell? The three-station work cell illustrated in the figure below has a product that must go through one of the two machines at station 1 (they are parallel) before proceeding to station 2. o Capacity:...
1. The process is performed by several resources. 2. Resources are shared across assembly lines (i.e., workers must multitask and perform multiple activities for every flow unit.) 3. The resource that limits hourly production is not the same resource that limits the process lead-time. From 2002 to 2009, Honda’s 1800cc cruiser-style motorcycle, the VTX1800, was assembled in Marysville, Ohio from four major subassemblies. The following is a simplified explanation of the assembly process. All resources are indicated in bold. •...
Problem 5-15 The following diagram describes a process that consists of eight separate operations with sequential relationships and capacities (units per hour) as shown. 20/hr 3 15/hr 10/hr 34/hr 30/hr 8 5/hr 4 8/hr 5 12/hr 6 a. What is the current capacity of the entire process? units b-1. If you could increase the capacity of only two operations through process Apps forquck arom place yor booinks here on 9w bookman barbsport bookmarks now- Help Problem 6-1 3 An assembly...
Question 4 1 pts Consider the assembly line below. The two fabrication operations run in parallel, such that each unit only needs to go through one of the fabrication operations. After that, portions of each unit go through both assembly and welding, which occur simultaneously (specifically, 10 components are made for each unit in the fabrication stage-some components are then assembled in the assembly area while others are welded in the welding area). The units are packaged and made ready...
1. The bottleneck time of the system is - ??? minutes per unit (enter your response as a whole number). 2. Which Station (1, 2, or 3) is the bottle neck station? 3. The throughput time is - ?????? 4. If the firm operates 11 hours per? day, 5 days per? week, the weekly capacity of this work cell is?....... units? (enter your response as a whole? number). The three-station work cell illustrated in the figure below has a product...