Answer a)
Step 1: Here, first, find the time taken (in minutes) for processing a unit, for all the work stations as mentioned below:
Processing Time (In Minutes) = 60 Minutes / Units Processed in an Hour
Hence, processing time at workstation:
1) Sawing = 60 / 7 = 8.5714 Min / Unit (Rounded to 4 decimal places)
2) Sanding = 60 / 6 = 10 Min / Unit
3) Drilling = 60 / 2.5 = 24 Min / Unit
4) Welding = 60 / 2 = 30 Min / Unit
5) Assembly = 60 / (0.8 + 0.8 +0.8) = 60 / 2.4 = 25 Min / Unit
(Note Total processing time at assembly = 25 * 3 = 75 Min / Unit)
Step 2: Determine the Bottleneck in the process:
The bottleneck is the workstation which takes the longest processing time per unit. Hence, the bottleneck for the given process is workstation "Welding".
Answer b) As calculated in step 1 of answer a, bottleneck time is 30 Minutes Per Unit. = 30.00 Minutes per Unit (Rounded to 2 decimal places)
Answer c) We will find the throughput time of the overall system by applying the following formula:
Throughput time of the overall system = Maximum of Processing Time (Sawing-Sanding-Welding-Assembly or Drilling-Welding-Assembly)
= Maximum [(8.5714 + 10 + 30 + 75) or (24 + 30 + 75)] (Values are taken from the step 1 of answer a)
= Maximum (123.5714 Minutes or 129 Minutes)
= 129 Minutes (Rounded to 2 decimal places)
A production process at Kenneth Day Manufacturing is shown in Figure S7.9 . The drilling operation occurs separately from, and simultaneously with, sawing and sanding, which are independent and sequential operations. A product needs to go through only one of the three assembly operations (the operations are in parallel).
A production process Kenneth Day Manufacturing is shown in the rebelow. Thengertion go through only one...
A production process at Kenneth Day Manufacturing is shown in the figure below. The drilling operation occurs separately from, and simultaneously with the sawing and sanding, which are independent sequential operations. A product needs to go through only one of the three assembly operations (the operations are in parallel). Q 2.5 units.hr 1.8 units/hr Assembly a Sawing 0.8 units/hr Sanding Welding 5 units/hr Assembly 0.8 units/hr Driling 5 units.hr Assembly 0.8 units/hr a) Sanding is the bottleneck b) The bottleneck...
A production process at Kenneth Day Manufacturing is shown in the figure below. The drilling operation occurs separately from, and simultaneously with the sawing and sanding, which are independent sequential operations. A product needs to go through only one of the three assembly operations (the operations are in parallel). Q 2.5 units/hr Sawing 2.1 units/he Sanding Assembly 0.8 unitsthe Welding 6 units.hr Assembly 0.8 units Drilling 5 unitshe Assembly 0.8 untui is the bottleneck 0.7 units/hr a) Drilling is the...
Can someone help me with bumber 3? i do not know if i did it right, i also dont know how to find 3. d. 3. A production process at Kenneth Day Manufacturing is shown in the figure below. The drilling operation occurs separately from, and simultaneously with the sawing and sanding, which are independent sequential operations. A product needs to go through only one of the three assembly operations (the operations are in parallel). 60/24-25min 60/2 = 30 min...
The three-station work cell illustrated in the figure below has a product that must go through one of the two machines at station 1 (they are parallel) before proceeding to station 2. a) The bottleneck time of the system is 6 minutos per unit (onitor your response as a whole number). b) Station 3 is the bottleneck station c) The throughout time is 13 minutes (onter your response as a whole number). d) If the firm operates 8 hours per...
Problem 1: Production. In a production process, let N mean "no trouble" and T "trouble." Let the transition probabilities from one day to the next be 0.8 for NN, hence 0.2 for NT, and 0.5 for T N, hence 0.5 for T T. If today there is no trouble, what is the probability of N two days after today? Three days after today? Problem 1: Production. In a production process, let N mean "no trouble" and T "trouble." Let the...
1. What is the fastest a rush order of one unit can go through the process? 2. Working 8 hours a day, what is the daily capacity of the process? 3. What is the labor content of a unit? 3. For this question consider hiring another worker and duplicating Operation D as shown in the diagram below. The two workers work on successive products; they don't work on the same product at the same time. The product still requires the...
there maybe more than one answer (1) In the hydrogen production through steam reforming process shown in the block diagram below, (a) The steam reforming is the process to convert hydrocarbon to carbon monoxide and hydrogen. (b) Through shift reaction, carbon monoxide will be converted to carbon dioxide. (c) The whole process is endothermic. (d) In the methanation, carbon monoxide is converted to methane and eliminated. Endothermic Exothermic со, Desulfuri- zation Steam reforming Shift removal Metha- nation Ico, H co,...
Consider the following production process for manufacturing biscuits. The first step of the process is mixing where all of the ingredients are combined in the correct proportion to form dough. In the next step of the process, the dough is formed into sheets and cut into pieces in preparation for baking. The cut dough is then baked into biscuits and subsequently must be cooled. The final step of the process is packaging the biscuits for the consumer. The following table...
Quant Changa is the supervisor of a production department in a vehicle manufacturing company. Quant must decide how many sedans and how many SUV's to produce per week. The profit on the sedans is $10K per vehicle and the SUV's profit is $18K. Each type of vehicle goes through a manufacturing process and a painting process. There are only 6000 minutes available for the manufacturing processes and only 4800 minutes available for the painting processes. Each sedan requires 20 minutes...
Your skateboard manufacturing operation is broken up into two separate production areas. The first, where the decks are made, is set up as a process cost environment -- all decks go through the same lamination process in their manufacture and are given the same sealant coating. After that, the decks are cut to three different sizes for the three different models of skateboards that are sold. Then, different wheels, bearings, trucks, and other components are added in the assembly area...