Question

The following diagram describes a process that consists of eight separate operations, with sequential relationships and...

The following diagram describes a process that consists of eight separate operations, with sequential relationships and capacities (units per hour) as shown below.

Operation A:13/hr > Operation B:11/hr > Operation C:19/hr > Operation G:28/hr > Operation H:19/hr
Operation D:3/hr > Operation E:6/hr > Operation F: 10/hr >

What is the throughput time (in minutes)?

*Keep at least 4 decimal places in your calculation.

0 0
Add a comment Improve this question Transcribed image text
Answer #1

Answer: throughput time= 41.3008 mins

Explained in attached image

Add a comment
Know the answer?
Add Answer to:
The following diagram describes a process that consists of eight separate operations, with sequential relationships and...
Your Answer:

Post as a guest

Your Name:

What's your source?

Earn Coins

Coins can be redeemed for fabulous gifts.

Not the answer you're looking for? Ask your own homework help question. Our experts will answer your question WITHIN MINUTES for Free.
Similar Homework Help Questions
  • The following diagram describes a process that consists of eight separate operations, with sequential relationships and...

    The following diagram describes a process that consists of eight separate operations, with sequential relationships and capacities (units per hour) as shown. Operation A: 15/hr. Operation B: 12/hr. Operation c: 20/hr. Operation G: 30/hr. Operation H: 25/hr. Operation D: 5/hr. Operation : 8/hr. Operation : 12/hr. (a) What is the current capacity of the entire process? (b) What is the throughput time? (c) If you could increase the capacity of only two operations through process improvement efforts, which two operations...

  • Problem 5-15 The following diagram describes a process that consists of eight separate operations with sequential...

    Problem 5-15 The following diagram describes a process that consists of eight separate operations with sequential relationships and capacities (units per hour) as shown. 20/hr 3 15/hr 10/hr 34/hr 30/hr 8 5/hr 4 8/hr 5 12/hr 6 a. What is the current capacity of the entire process? units b-1. If you could increase the capacity of only two operations through process Apps forquck arom place yor booinks here on 9w bookman barbsport bookmarks now- Help Problem 6-1 3 An assembly...

  • A production process at Kenneth Day Manufacturing is shown in the figure below. The drilling operation...

    A production process at Kenneth Day Manufacturing is shown in the figure below. The drilling operation occurs separately from, and simultaneously with the sawing and sanding, which are independent sequential operations. A product needs to go through only one of the three assembly operations (the operations are in parallel). Q 2.5 units.hr 1.8 units/hr Assembly a Sawing 0.8 units/hr Sanding Welding 5 units/hr Assembly 0.8 units/hr Driling 5 units.hr Assembly 0.8 units/hr a) Sanding is the bottleneck b) The bottleneck...

  • A production process at Kenneth Day Manufacturing is shown in the figure below. The drilling operation...

    A production process at Kenneth Day Manufacturing is shown in the figure below. The drilling operation occurs separately from, and simultaneously with the sawing and sanding, which are independent sequential operations. A product needs to go through only one of the three assembly operations (the operations are in parallel). Q 2.5 units/hr Sawing 2.1 units/he Sanding Assembly 0.8 unitsthe Welding 6 units.hr Assembly 0.8 units Drilling 5 unitshe Assembly 0.8 untui is the bottleneck 0.7 units/hr a) Drilling is the...

  • The following diagram shows a 4-step process that begins with Operation 1 and ends with Operation...

    The following diagram shows a 4-step process that begins with Operation 1 and ends with Operation 4. The rates shown in each box represent the effective capacity of that operation. a.  Determine the capacity of this process. b.  Which action would yield the greatest increase in process capacity: (1) increase the capacity of Operations 1 by 15 percent; (2) increase the capacity of Operations 2 by 10 percent; or (3) increase the capacity of Operations 3 by 10 percent?            12/hr.                        15/hr.                          11/hr.                             14/hr.    ?Operation 1?    ?    Operation...

  • Can someone help me with bumber 3? i do not know if i did it right,...

    Can someone help me with bumber 3? i do not know if i did it right, i also dont know how to find 3. d. 3. A production process at Kenneth Day Manufacturing is shown in the figure below. The drilling operation occurs separately from, and simultaneously with the sawing and sanding, which are independent sequential operations. A product needs to go through only one of the three assembly operations (the operations are in parallel). 60/24-25min 60/2 = 30 min...

  • You have been asked to balance a flow shop assembly operation to achieve an output rate...

    You have been asked to balance a flow shop assembly operation to achieve an output rate of 80 units over two eight-hour shifts - 16 hours. Task times and precedence relationships are shown in the table below: Task Predecessor Time (minutes) A -- 2 B A 4 C 7 D A, B 11 E C 9 F D 10 G E, F 7 H D, G 4 What is the cycle time in minutes? What is the theoretical number of...

  • The three-station work cell illustrated in the figure below has a product that must go through...

    The three-station work cell illustrated in the figure below has a product that must go through one of the two machines at station 1 (they are parallel) before proceeding to station 2. a) The bottleneck time of the system is 6 minutos per unit (onitor your response as a whole number). b) Station 3 is the bottleneck station c) The throughout time is 13 minutes (onter your response as a whole number). d) If the firm operates 8 hours per...

  • Genuine Spice Inc. began operations on January 1 of the current year. The company produces eight-...

    Genuine Spice Inc. began operations on January 1 of the current year. The company produces eight- ounce bottles of hand and body lotion called Eternal Beauty. The lotion is sold wholesale in 12-bottle cases for $100 per case. There is a selling commission of $20 per case. The January direct materials, direct labor, and factory overhead costs are as follows: DIRECT MATERIALS Cost Behavior Units per Case Cost per Unit Cost per Case Cream base Variable 100 oz. $0.02 $...

  • Genuine Spice Inc. began operations on January 1 of the current year. The company produces eight-...

    Genuine Spice Inc. began operations on January 1 of the current year. The company produces eight- ounce bottles of hand and body lotion called Eternal Beauty. The lotion is sold wholesale in 12-bottle cases for $100 per case. There is a selling commission of $20 per case. The January direct materials, direct labor, and factory overhead costs are as follows: DIRECT MATERIALS Cost Behavior Units per Case Cost per Unit Cost per Case Cream base Variable 100 oz. $0.02 $...

ADVERTISEMENT
Free Homework Help App
Download From Google Play
Scan Your Homework
to Get Instant Free Answers
Need Online Homework Help?
Ask a Question
Get Answers For Free
Most questions answered within 3 hours.
ADVERTISEMENT
ADVERTISEMENT
ADVERTISEMENT