The three stations work cell illustrated in the
figure below has a product that must go through one of the
two machines at station 1 ( they are parallel) before
proceeding to station 2
Capacity:30 units/hrs
Station 1
Machine A
Station 1
Machine B
Capacity:30 units / hrs
Station 2
Capacity 12 units/hrs
Station 3
Capacity 4 units/hrs
A) The bottleneck time of the system is .......minutes
per unit ( enter your response as whole
number)
B) Station 1 or station 2 or station 3
C) the throughout time is ........... minutes ( enter
your response as a whole number )
D) If the firm operates 11 hours per days ,5
days per week, the weekly capacity of this work cell is
.......units (Enter your response as a whole number)
Answer a: station 1 capacity is 60 units per hour (2 parallel machines), therefore station 3 is a bottleneck station with 4 units per hour capacity
Bottleneck time is cycle time if station 3= 60/4= 15 mins per unit
Answer b: station 3 is the bottleneck station
Answer c: Throughput time is the sum of the processing time that a product has to pass through. Time taken (station 1+station 2+ station 3) = 60/30 +60/12 +60/4= 2 + 5 + 15 = 22 mins
Answer d: Working hours= 11 hours for 5 days= 55 hours
The capacity of bottleneck= 4 units per hour
Total product per week= 55*4= 220 units
Please ask, if you have any doubts through the comment section. Do rate the answer
The three stations work cell illustrated in the figure below has a product that must go...
NEED ANSWER D. The Pullman Mfg., Inc. three-station work cell illustrated in the figure below has two machines at station 1 in parallel. (The product needs to go through only one of the two machines before proceeding to station 2.) 12 min/unit Station 1 Machine A Station 2 Station 3 5 min/unit 12 min/unit Station 1 Machine B 12 min/unit The manager, Ms. Hartley, has asked you to evaluate the system if she adds a parallel machine at station 3....
The three-station work cell illustrated in the figure below has a product that must go through one of the two machines at station 1 (they are parallel) before proceeding to station 2. a) The bottleneck time of the system is 6 minutos per unit (onitor your response as a whole number). b) Station 3 is the bottleneck station c) The throughout time is 13 minutes (onter your response as a whole number). d) If the firm operates 8 hours per...
1. The bottleneck time of the system is - ??? minutes per unit (enter your response as a whole number). 2. Which Station (1, 2, or 3) is the bottle neck station? 3. The throughput time is - ?????? 4. If the firm operates 11 hours per? day, 5 days per? week, the weekly capacity of this work cell is?....... units? (enter your response as a whole? number). The three-station work cell illustrated in the figure below has a product...
What is the process time of the system? b) What is the bottleneck time of this work cell? c)What is the process cycle time? d) If the firm operates 10 hours per day, 5 days per week, what is the weekly capacity of this work cell? The three-station work cell illustrated in the figure below has a product that must go through one of the two machines at station 1 (they are parallel) before proceeding to station 2. o Capacity:...
A work cell has four stations, and each unit produced at the cell needs to be processed by all of the stations in series. (The same unit cannot be worked on by four stations simultaneously.) The capacity of each station is (Station #, # of Machines, units per hour), (S1, 1, 4), (S2, 1, 5), (S3, 1, 6), (S4, 1, 8). What is the process time of the work cell in minutes per unit?
A production line at V. J. Sugumaran's machine shop has three stations. The first station can process a unit in 6 minutes. The second station has three identical machines, each of which can process a unit in 15 minutes (each unit only needs to be processed on one of the three machines). The third station can process a unit in 8 minutes ▼| is the bottleneck station, with a bottleneck time of] | minutes per unit (enteryourresponse as a whole...
A production process at Kenneth Day Manufacturing is shown in the figure below. The drilling operation occurs separately from, and simultaneously with the sawing and sanding, which are independent sequential operations. A product needs to go through only one of the three assembly operations (the operations are in parallel). Q 2.5 units.hr 1.8 units/hr Assembly a Sawing 0.8 units/hr Sanding Welding 5 units/hr Assembly 0.8 units/hr Driling 5 units.hr Assembly 0.8 units/hr a) Sanding is the bottleneck b) The bottleneck...
A production process at Kenneth Day Manufacturing is shown in the figure below. The drilling operation occurs separately from, and simultaneously with the sawing and sanding, which are independent sequential operations. A product needs to go through only one of the three assembly operations (the operations are in parallel). Q 2.5 units/hr Sawing 2.1 units/he Sanding Assembly 0.8 unitsthe Welding 6 units.hr Assembly 0.8 units Drilling 5 unitshe Assembly 0.8 untui is the bottleneck 0.7 units/hr a) Drilling is the...
A batch of material must visit two work stations in series to be converted into finished product. Each batch makes 100 units. Setup time at each work station is 30 minutes. Variable processing time is 3 minutes/unit and 5 minutes/unit in station 1 and station 2 respectively. After completing the operation the batch has to wait on average of 1 hour for the material handler to move it to the next machine. Assuming there is no time lost in waiting...
A work cell in a local manufacturer has a workstation with 4 machines and each unit needs to pass through each machine in order to be completed. Each machine has a production capacity of four units per hour. What is the process time of the work cell in minutes per unit?