Question

Vintage Fun reproduces old−fashioned style roller skates and skateboards. The annual production and sales of roller...

Vintage Fun reproduces old−fashioned style roller skates and skateboards. The annual production and sales of roller skates is 1,000 ​units, while 1,780 skateboards are produced and sold. The company has traditionally used direct labor hours to allocate its overhead to products. Roller skates require 1.5 direct labor hours per​ unit, while skateboards require 2.25 direct labor hours per unit. The total estimated overhead for the period is $114,900. The company is looking at the possibility of changing to an activity−based costing system for its products. If the company used an activity−based costing​ system, it would have the following three activity cost​ pools:

Expected activity

Activity cost pool

Estimated overhead cost

$6,950 : Setup costs

$16,400 : Engineering costs

$91,550 : Maintenance costs

Roller skates

345 : Setup costs

440 : Engineering costs

2,175 : Maintenance costs

Skateboards

250 : Setup costs

630 : Engineering costs

2,188 : Maintenance costs

Total

595 : Setup costs

1,070 : Engineering costs

4,363 : Maintenance costs

The cost pool activity rate for Engineering Costs would be closest to​ (Round all answers to two decimal​ places.)

A. $7.50 per engineering hour.

B. $11.68 per engineering hour.

C. $20.98 per engineering hour.

D. $15.33 per engineering hour.

0 0
Add a comment Improve this question Transcribed image text
Answer #1

Thank you.

For any clarification please comment

Add a comment
Know the answer?
Add Answer to:
Vintage Fun reproduces old−fashioned style roller skates and skateboards. The annual production and sales of roller...
Your Answer:

Post as a guest

Your Name:

What's your source?

Earn Coins

Coins can be redeemed for fabulous gifts.

Not the answer you're looking for? Ask your own homework help question. Our experts will answer your question WITHIN MINUTES for Free.
Similar Homework Help Questions
  • Vintage Fun reproduces old-fashioned style roller skates and skateboards. The annual production and sales of roller...

    Vintage Fun reproduces old-fashioned style roller skates and skateboards. The annual production and sales of roller skates is 900 units, while 1,750 skateboards are produced and sold. The company has traditionally used direct labor hours to allocate its overhead to products. Roller skates require 4.5 direct labor hours per unit, while skateboards require 3.25 direct labor hours per unit. The total estimated overhead for the period is $114,400. The company is looking at the possibility of changing to an activity...

  • Vintage Fun reproduces old - fashioned style roller skates and skateboards. The annual production and sales...

    Vintage Fun reproduces old - fashioned style roller skates and skateboards. The annual production and sales of roller skates is 1,000 units, while 1,750 skateboards are produced and sold. The company has traditionally used direct labor hours to allocate its overhead to products. Roller skates require 1.5 direct labor hours per unit, while skateboards require 2.25 direct labor hours per unit. The total estimated overhead for the period is $114,700. The company is looking at the possibility of changing to...

  • Vintage Fun reproduces old - fashioned style roller skates and skateboards. The annual production and sales...

    Vintage Fun reproduces old - fashioned style roller skates and skateboards. The annual production and sales of roller skates is 900 units, while 1,700 skateboards are produced and sold. The company has traditionally used direct labor hours to allocate its overhead to products. Roller skates require 4.5 direct labor hours per unit, while skateboards require 3.25 direct labor hours per unit. The total estimated overhead for the period is $114,100. The company is looking at the possibility of changing to...

  • z Cont. Batch costs Number of batches Engineering changes Number of engineering hours Total estimated manufacturing...

    z Cont. Batch costs Number of batches Engineering changes Number of engineering hours Total estimated manufacturing overhead for the year $196,000 $188,950 $3,600,200 Total estimated direct labor hours for the company for the year are 100,250 hours. The company is evaluating whether it should use an activity-based costing system in place of its traditional costing system. Additional information about production needed for the activity-based costing system follows: Zips Dees Total Direct labor hours 61,250 39,000 100,250 Batches 2,350 400 2,750...

  • Vandalay Industries manufactures two​ products: toasters and blenders. The annual production and sales of toasters is​...

    Vandalay Industries manufactures two​ products: toasters and blenders. The annual production and sales of toasters is​ 2,100 units, while​ 1,600 units of blenders are produced and sold. The company has traditionally used direct labor hours to allocate its overhead to products. Toasters require 1.25 direct labor hours per​ unit, while blenders require 1 direct labor hours per unit. The total estimated overhead for the period is​ $149,315. The company is looking at the possibility of changing to an activity−based costing...

  • Calculating Activity-Based Costing Overhead Rates Assume that manufacturing overhead for Goldratt Company consisted of the following...

    Calculating Activity-Based Costing Overhead Rates Assume that manufacturing overhead for Goldratt Company consisted of the following activities and costs: Setup (1,000 setup hours) $118,000 Production scheduling (400 batches) 60,000 Production engineering (60 change orders) 150,000 Supervision (2,000 direct labor hours) 46,000 Machine maintenance (12,000 machine hours) 60,000 Total activity costs $434,000 The following additional data were provided for Job 845: Direct materials costs $7,000 Direct labor cost (5 Milling direct labor hours;35 Finishing direct labor hours) $1,000 Setup hours 5...

  • Identify a cost driver that may be used to assign each cost pool to each line...

    Identify a cost driver that may be used to assign each cost pool to each line of snowmobiles. Cost Driver Budgeted Costs Machine setup, Indirect materials Inspections Tests Insurance, plant Engineering design Depreciation, machinery Machine setup, indirect labor Property taxes oil, heating Electricity, plant lighting Engineering prototypes Depreciation, plant Electricity, machinery Machine maintenance wages Exercise 4-1 (Video) Saddle Inc. has two types of handbags: standard and custom. The controller has decided to use a plantwide overhead rate based on direct...

  • Cost Behavior, Resource Usage, Excess Capacity Rolertyme Company manufactures roller skates. With the exception of the...

    Cost Behavior, Resource Usage, Excess Capacity Rolertyme Company manufactures roller skates. With the exception of the rollers, all parts of the skates are produced internally. Neeta Booth, president of Rolertyme, has decided to make the rollers instead of buying them from external suppliers. The company needs 100,000 sets per year (currently it pays $1.90 per set of rollers). The rollers can be produced using an available area within the plant. However, equipment for production of the rollers would need to...

  • Cost Behavior, Resource Usage, Excess Capacity Rolertyme Company manufactures roller skates. With the exception of the...

    Cost Behavior, Resource Usage, Excess Capacity Rolertyme Company manufactures roller skates. With the exception of the rollers, all parts of the skates are produced internally. Neeta Booth, president of Rolertyme, has decided to make the rollers instead of buying them from external suppliers. The company needs 100,000 sets per year (currently it pays $1.90 per set of rollers). The rollers can be produced using an available area within the plant. However, equipment for production of the rollers would need to...

  • Calculating Activity-Based Costing Overhead Rates Assume that manufacturing overhead for Glassman Company consisted of the following...

    Calculating Activity-Based Costing Overhead Rates Assume that manufacturing overhead for Glassman Company consisted of the following activities and costs: Setup (1,000 setup hours) $ 146,000 Production scheduling (400 batches) 60,000 Production engineering (60 change orders) 90,000 Supervision (2,000 direct labor hours) 56,000 Machine maintenance (12,000 machine hours) 96,000 Total activity costs $ 448,000 The following additional data were provided for Job 845: Direct material costs $ 8,000 Direct labor cost (5 Milling direct labor hours; 35 Finishing direct labor hours)...

ADVERTISEMENT
Free Homework Help App
Download From Google Play
Scan Your Homework
to Get Instant Free Answers
Need Online Homework Help?
Ask a Question
Get Answers For Free
Most questions answered within 3 hours.
ADVERTISEMENT
ADVERTISEMENT
ADVERTISEMENT