please show steps A bakery prepares both cakes and cookies. Each batch of cookies requires 3...
please show steps A bakery prepares both cakes and cookies. Each batch of cookies requires 3 hours in the oven and 1 hour in the decorating room. Each batch of cakes requires 2 hours in the oven and 4 hours in the decorating room. The oven is available no more than 18 hours a day, while the decorating room can be used no more than 16 hours a day. How many batches of cookies and cakes should the bakery produce...
show work please A bakery prepares both cakes and cookies. Each batch of cookies requires 3 hours in the oven and 1 hour in the decorating room. Each batch of cakes requires 2 hours in the oven and 4 hours in the decorating room. The oven is available no more than 18 hours a day, while the decorating room can be used no more than 16 hours a day. How many batches of cookies and cakes should the bakery produce...
Review Problem Use for 1 7) A bakery prepares both cakes and cookies. Each batch of cakes requires 4 hours in the oven and 1 hour in the decorating room Each batch of cookies needs 3 hours in the oven and 2 hours in the decorating room. The oven is available no more than 12 hours a day, while the decorating room can be used no more than 6 hours a day. How many batches of cakes and cookies should...
The Kankakee Bakery produces three types of cakes: birthday, wedding, and special occasion. The cakes are made from scratch and baked in a special cake oven. During the holiday season, the two month period from November 1 through January 1, total demand for the cakes exceeds the capacity of the cake oven. The cake oven is available for baking 690 hours per month, but because of the size of the cakes, it can bake only one cake at a time....
managerial accounting The Kankakee Bakery produces three types of cakes: birthday, wedding, and special occasion. The cakes are made from scratch and baked in a special cake oven. During the holiday season, the two month period from November 1 through January 1, total demand for the cakes exceeds the capacity of the cake oven. The cake oven is available for baking 690 hours per month, but because of the size of the cakes, it can bake only one cake at...
Problem 2 (25 points). The Kankakee Bakery produces three types of cakes: birthday, wedding, and special occasion. The cakes are made from scratch and baked in a special cake oven. During the holiday season, the two month period from November through January 1, total demand for the cakes exceeds the capacity of the cake oven. The cake oven is available for baking 690 hours per month, but because of the size of the cakes, it can bake only one cake...
Managerial accounting, please show work for better understanding. Also having trouble with 3 and 4 The Kankakee Bakery produces three types of cakes: birthday, wedding, and special occasion. The cakes are made from scratch and baked in a special cake oven. During the holiday season, the two month period from November 1 through January 1, total demand for the cakes exceeds the capacity of the cake oven. The cake oven is available for baking 690 hours per month, but because...
The ISU grade 10 class has decided to host a bake sale to raise money for a class trip. Each student is required to bake 2 types of goods for sale. You have decided to bake chocolate chip cookies and lemon squares. From previous experience you know that it takes 15 minutes to bake 1 batch of cookies, while it takes 30 minutes to bake 1 batch of lemon squares. You can sell 1 batch of cookies for 6000 MNT...
1. A company manufactures two products: large fans and medium fans. Each large fan requires 3 hours of wiring and 2 hours of drilling. Each medium fan requires 2 hours of wiring and 1 hour of drilling. There are 480 hours of wiring time available and 280 hours of drilling time available. Each large fan yields a profit of $25. Each medium fan yields a profit of $18. The company wants to manufacture at least 20 large fans. The objective...
Hello Dolly, Inc. crafts three styles of dolls: Lexi, Maysy, and Dizzy. Each doll requires sewing time, painting time, and supplies. Sewing machines are available for only 206 hours, only 2760 hours are available for painting, and 666.5 lbs. of supplies are available. Each Lexi doll requires 0.6 hours of sewing, 9 hours of painting, and 1.3 lbs. of supplies. Each Maysy doll requires 0.8 hours of sewing, 6 hours of painting, and uses 2 pounds of supplies. Each Dizzy...