Question

1. A company manufactures two products: large fans and medium fans. Each large fan requires 3...

1. A company manufactures two products: large fans and medium fans. Each large fan requires 3 hours of wiring and 2 hours of drilling. Each medium fan requires 2 hours of wiring and 1 hour of drilling. There are 480 hours of wiring time available and 280 hours of drilling time available. Each large fan yields a profit of $25. Each medium fan yields a profit of $18. The company wants to manufacture at least 20 large fans. The objective is to maximize total profit.

(a) Formulate a linear optimization model for this problem by defining the decision variables, objective function and all the constraints. What do they represent?

(b) Find the optimal solution of this model by hand using the Corner Points graphical method.

Please show with steps and formulas on excel as to how to solve these problems; :)

0 0
Add a comment Improve this question Transcribed image text
Answer #1

(a)

Let 'L' and 'M' represent the number of large and medium fans.

Max Z = 25 L + 18 M
s.t.
3 L + 2 M <= 480 (Wiring)
2 L + 1 M <= 280 (Drilling)
L >= 20 (min L)
L, S >= 0

(b)

Formulate this table in the following way:

A B E L L>= 20 0 50 3L + 2M<= 480 =( 480-3*B3)/2 =(480-3*B4)/2 =(480-3*B5)/2 =(480-3*B6)/2 =(480-3*B7)/2 2L+1M <= 280 (280-2*

Then go to the scatter plot option to develop the graph. For the first two constraints, keep the 'L' column in X-axis and the 'C' and 'D' column in the Y-axis. For the third column, do the reverse i.e. keep the 'L' column in Y-axis and 'E' column in X-axis.

Select Data Source ? x ? X Chart data range: The data range is too complex to be displayed. If a new range is selected, it wi

Select Data Source ? x Chart data range: The data range is too complex to be displayed. If a new range is selected, it will r

Select Data Source ? x Chart data range: The data range is too complex to be displayed. If a new range is selected, it will r

(20, 210) 3 L+2 M <= 480 (80, 120) 2L+1 M <= 280 L>= 20 (20,0) 50 100 (140, 150 200

The evaluation of the corner points are as follows:

Corner points L M Z = 25 L + 18 M
(20, 0) 20 0 500
(140, 0) 140 0 3500
(80, 120) 80 120 4160
(20, 210) 20 210 4280 (max)

Optimal solution: L = 20, M = 210, Max Z = $4,280

Add a comment
Know the answer?
Add Answer to:
1. A company manufactures two products: large fans and medium fans. Each large fan requires 3...
Your Answer:

Post as a guest

Your Name:

What's your source?

Earn Coins

Coins can be redeemed for fabulous gifts.

Not the answer you're looking for? Ask your own homework help question. Our experts will answer your question WITHIN MINUTES for Free.
Similar Homework Help Questions
  • Exercise 1. Found 1 JU m b y P The Electrocomp Corporation manufactures two electrical products:...

    Exercise 1. Found 1 JU m b y P The Electrocomp Corporation manufactures two electrical products: air conditioners and large fans. The assembly process for each is similar in that both require a certain amount of wiring and drilling. Each air conditioner takes 3 hours of wiring and 2 hours of drilling. Each fan must go through 2 hours of wiring and 1 hour of drilling. During the next production period, 240 hours of wiring time are available and up...

  • .EI ot slimie Final Operations Management Similar to 7-14:0 The Electrocomp Corporation manufactures two electrical products:...

    .EI ot slimie Final Operations Management Similar to 7-14:0 The Electrocomp Corporation manufactures two electrical products: air conditioners and large fans. The assembly process for each is similar in that both require a certain amount of wiring and driling. Each air conditioner takes 6 hours of wiring and 2 hours of drilling Each fan must go through 2 hours of wiring and 1 hours of drilling, During the next production period, 240 hours of wiring time are available and up...

  • Need optimal solution for x,y, and value Z The Attaran Corporation manufactures two electrical products: portable...

    Need optimal solution for x,y, and value Z The Attaran Corporation manufactures two electrical products: portable air conditioners and portable heaters. The assembly process for each is similar in that both require a certain amount of wiring and drilling. Each air conditioner takes 3 hours of wiring and 2 hours of drilling. Each heater must go through 2 hours of wiring and 1 hour of drilling During the next production period, 240 hours of wiring time are available and up...

  • Similar to 7-14 Electrocomp Corporation manufactures two electrical product ir tu The assembly process for each...

    Similar to 7-14 Electrocomp Corporation manufactures two electrical product ir tu The assembly process for each is similar in that both require a certain amount of wiring fans. and drilling Each air conditioner takes 6 hours of wiring and 2 hours of drilling. Each fan must so through 2 hours of wiring and 1 hours of drilling. During the next production period, 240 hours of wiring time are available and up to 100 hours of drilling time may be used....

  • The Electrotech Corporation manufactures two industrial-sized electrical devices: generators and alternators. Both of these products require...

    The Electrotech Corporation manufactures two industrial-sized electrical devices: generators and alternators. Both of these products require wiring and testing during the assembly process. Each generator requires 2 hours of wiring and 1 hour of testing and can be sold for a $250 profit. Each alternator requires 3 hours of wiring and 2 hours of testing and can be sold for a $150 profit. There are 260 hours of wiring time and 140 hours of testing time available in the next...

  • Operations Management

    can someone help me to solved this problems ? the instruction is formulate mathematical model with using excel solver.objective functionconstrainsQuestionThe Attaran Corporation manufactures two electrical products: portable air conditioners and portable heaters. The assembly process for each is similar in that both require a certain amount of wiring and drilling. Each air conditioner takes 3 hours of wiring and 2 hours of drilling. Each heater must go through 2 hours of wiring and 1 hour of drilling. During the next production...

  • The Marriott Tub Company manufactures two lines of bathtubs, called model A and model B. Every...

    The Marriott Tub Company manufactures two lines of bathtubs, called model A and model B. Every tub requires a certain amount of steel and zinc; the company has available a total of 25,000 pounds of steel and 6,000 pounds of zinc. Each model A bathtub requires a total of 150 pounds of steel and 20 pounds of zinc, and each yields a profit of $90. Each model B bathtub can be sold for a profit of $70; it in turn...

  • 32) Tranquility Company manufactures ceiling fans and uses an activity-based costing system. Each ceiling fan has...

    32) Tranquility Company manufactures ceiling fans and uses an activity-based costing system. Each ceiling fan has 20 separate parts. The direct materials cost is $95 and each ceiling fan requires 2.50 hours of machine time to manufacture. There is no direct labor. Additional information is as follows: Activity Materials handling Machining Assembling Packaging Allocation Base Number of parts Machine hours Number of parts Number of finished units Predetermined Overhead Allocation Rate $ 0.07 7.40 0.40 2.50 What is the total...

  • Question Help Tranquility Company manufactures ceiling fans and uses an activity-based costing system. Each ceiling fan...

    Question Help Tranquility Company manufactures ceiling fans and uses an activity-based costing system. Each ceiling fan has 20 separate parts. The direct materials cost is $75 and each ceiling fan requires 4 hours of machine time to manufacture. There is no direct labor. Additional information is as follows: Predetermined Overhead Activity Allocation Base Allocation Rate Materials handling Number of parts $ 0.04 Machining Machine hours 68 Assembling Number of parts 0.25 Packaging Number of finished units 3.2 What is the...

  • A company produces two products on two machines. •A unit of Product 1 requires 2 hrs...

    A company produces two products on two machines. •A unit of Product 1 requires 2 hrs on machine 1 and 1 hr on machine 2. •For Product 2, a unit requires 1 hr on machine 1 and 3 hrs on machine 2. •The profitper unit of Products 1 and 2 are $30 and $20, respectively. •The total weeklyprocessing time available for each machine is 80hrs. Question 1: Let x be the number of units produced for Product 1 and y...

ADVERTISEMENT
Free Homework Help App
Download From Google Play
Scan Your Homework
to Get Instant Free Answers
Need Online Homework Help?
Ask a Question
Get Answers For Free
Most questions answered within 3 hours.
ADVERTISEMENT
ADVERTISEMENT
ADVERTISEMENT