Similar to 7-12
Let the decision variables be
Number of air conditioners = X1
Number of fans = X2
Objective function
Maximize 25X1 + 15X2
Subject to constraints
6X1 + 2X2 <= 240
2X1 + 1X2 <= 100
X1, X2 >= 0
The corner points are
(0,0)
(0,100)
Crossing point between the two constraint lines
(40,0)
Solving the crossing point between the two line is at X1 = 20 and 60. This means the objective function value at each corner points are
At (0,0) = 0
At (0,100) = 25*0 + 15*100 = 1500
At (20,60) = 25*20 + 15*60 = 1400
At (40,0) = 25*40 + 15*0 = 1000
Since it is a maximization problem, the maximum value is 1500 at the corner point (0,100). The optimal solution is 0 air conditioner and 100 fans to be produced with a maximum profit of 1500.
Similar to 7-14 Electrocomp Corporation manufactures two electrical product ir tu The assembly process for each...
.EI ot slimie Final Operations Management Similar to 7-14:0 The Electrocomp Corporation manufactures two electrical products: air conditioners and large fans. The assembly process for each is similar in that both require a certain amount of wiring and driling. Each air conditioner takes 6 hours of wiring and 2 hours of drilling Each fan must go through 2 hours of wiring and 1 hours of drilling, During the next production period, 240 hours of wiring time are available and up...
Exercise 1. Found 1 JU m b y P The Electrocomp Corporation manufactures two electrical products: air conditioners and large fans. The assembly process for each is similar in that both require a certain amount of wiring and drilling. Each air conditioner takes 3 hours of wiring and 2 hours of drilling. Each fan must go through 2 hours of wiring and 1 hour of drilling. During the next production period, 240 hours of wiring time are available and up...
Need optimal solution for x,y, and value Z The Attaran Corporation manufactures two electrical products: portable air conditioners and portable heaters. The assembly process for each is similar in that both require a certain amount of wiring and drilling. Each air conditioner takes 3 hours of wiring and 2 hours of drilling. Each heater must go through 2 hours of wiring and 1 hour of drilling During the next production period, 240 hours of wiring time are available and up...
1. A company manufactures two products: large fans and medium fans. Each large fan requires 3 hours of wiring and 2 hours of drilling. Each medium fan requires 2 hours of wiring and 1 hour of drilling. There are 480 hours of wiring time available and 280 hours of drilling time available. Each large fan yields a profit of $25. Each medium fan yields a profit of $18. The company wants to manufacture at least 20 large fans. The objective...
PLEASE SHOW HOW TO GRAPH ON EXCEL. I DONT KNOW HOW TO GRAPH IT. please also solve as instructed in problem • B.5 The Attaran Corporation manufactures two electrical products: portable air conditioners and portable heaters. The assembly process for each is similar in that both require a certain amount of wiring and drilling. Each air conditioner takes 3 hours of wiring and 2 hours of drilling. Each heater must go through 2 hours of wiring and 1 hour of...
can someone help me to solved this problems ? the instruction is formulate mathematical model with using excel solver.objective functionconstrainsQuestionThe Attaran Corporation manufactures two electrical products: portable air conditioners and portable heaters. The assembly process for each is similar in that both require a certain amount of wiring and drilling. Each air conditioner takes 3 hours of wiring and 2 hours of drilling. Each heater must go through 2 hours of wiring and 1 hour of drilling. During the next production...