Similar to 7-12
Let the decision variables be
Number of air conditioners = X1
Number of fans = X2
Objective function
Maximize 25X1 + 15X2
Subject to constraints
6X1 + 2X2 <= 240
2X1 + 1X2 <= 100
X1, X2 >= 0
The corner points are
(0,0)
(0,100)
Crossing point between the two constraint lines
(40,0)
Solving the crossing point between the two line is at X1 = 20 and 60. This means the objective function value at each corner points are
At (0,0) = 0
At (0,100) = 25*0 + 15*100 = 1500
At (20,60) = 25*20 + 15*60 = 1400
At (40,0) = 25*40 + 15*0 = 1000
Since it is a maximization problem, the maximum value is 1500 at the corner point (0,100). That means the optimum solution is to produce 0 air conditioner and 100 fans and make a profit of 1500.
.EI ot slimie Final Operations Management Similar to 7-14:0 The Electrocomp Corporation manufactures two electrical products:...
Similar to 7-14 Electrocomp Corporation manufactures two electrical product ir tu The assembly process for each is similar in that both require a certain amount of wiring fans. and drilling Each air conditioner takes 6 hours of wiring and 2 hours of drilling. Each fan must so through 2 hours of wiring and 1 hours of drilling. During the next production period, 240 hours of wiring time are available and up to 100 hours of drilling time may be used....
Exercise 1. Found 1 JU m b y P The Electrocomp Corporation manufactures two electrical products: air conditioners and large fans. The assembly process for each is similar in that both require a certain amount of wiring and drilling. Each air conditioner takes 3 hours of wiring and 2 hours of drilling. Each fan must go through 2 hours of wiring and 1 hour of drilling. During the next production period, 240 hours of wiring time are available and up...
can someone help me to solved this problems ? the instruction is formulate mathematical model with using excel solver.objective functionconstrainsQuestionThe Attaran Corporation manufactures two electrical products: portable air conditioners and portable heaters. The assembly process for each is similar in that both require a certain amount of wiring and drilling. Each air conditioner takes 3 hours of wiring and 2 hours of drilling. Each heater must go through 2 hours of wiring and 1 hour of drilling. During the next production...
Need optimal solution for x,y, and value Z The Attaran Corporation manufactures two electrical products: portable air conditioners and portable heaters. The assembly process for each is similar in that both require a certain amount of wiring and drilling. Each air conditioner takes 3 hours of wiring and 2 hours of drilling. Each heater must go through 2 hours of wiring and 1 hour of drilling During the next production period, 240 hours of wiring time are available and up...
PLEASE SHOW HOW TO GRAPH ON EXCEL. I DONT KNOW HOW TO GRAPH IT. please also solve as instructed in problem • B.5 The Attaran Corporation manufactures two electrical products: portable air conditioners and portable heaters. The assembly process for each is similar in that both require a certain amount of wiring and drilling. Each air conditioner takes 3 hours of wiring and 2 hours of drilling. Each heater must go through 2 hours of wiring and 1 hour of...
1. A company manufactures two products: large fans and medium fans. Each large fan requires 3 hours of wiring and 2 hours of drilling. Each medium fan requires 2 hours of wiring and 1 hour of drilling. There are 480 hours of wiring time available and 280 hours of drilling time available. Each large fan yields a profit of $25. Each medium fan yields a profit of $18. The company wants to manufacture at least 20 large fans. The objective...
12. a-d and 13. a-d 12. Quality Air Conditioning manufactures three home air conditioners: an cconomy model a standard model, and a deluxe model. The profits per unit are S63-995, and $135, np tively. The production requirements per unit are as follows Number of Fans Number of Cooling Cods Manufacturing Time hours Standard Deluxe 12 14 For the coming production period, the company has 200 fan motons, 320 cooling coils and 2400 hours of manufacturing time available. How many ecconomy...
Problem 3-13 (Algorithmic) Quality Air Conditioning manufactures three home air conditioners: an economy model, a standard model, and a deluxe model. The profits per unit are $59, $89, and $137, respectively. The production requirements per unit are as follows: Number of Fans Number of Cooling Coils Manufacturing Time (hours) Economy 1 1 8 Standard 1 2 12 Deluxe 1 4 14 For the coming production period, the company has 240 fan motors, 380 cooling coils, and 2500 hours of manufacturing...
An Air Conditioning manufactures three varieties of home air conditioners: an economy model, a standard model, and a deluxe model. The profit per unit is SAR 63, 95, and 135, respectively. The production requirements per unit are as follows: Number of Fans Number of Cooling Coils manufacturing Time (hours) Economy 1 1 8 Standard 1 2 12 Deluxe 1 4 14 For the coming production period, the company has 200 fan motors, 320 cooling coils, and 2400 hours of manufacturing...
1 2 12 1 14 Performance Cooling Inc. manufactures air conditioners for home use and they currently have three models serving this market: (1) the essential model, (2) the comfort model, and (3) the majestic model. The units sell for reasonable prices and bring in a profit of $63, 995, and $135 respectively. Currently, the resources required for production of each unit is given in the table below. Fans Cooling Coils Assembly Time (hr) Essential 8 Comfort Majestic In Stock/Available...