Question

• B.5 The Attaran Corporation manufactures two electrical products: portable air conditioners and portable heaters. The assemPLEASE SHOW HOW TO GRAPH ON EXCEL. I DONT KNOW HOW TO GRAPH IT. please also solve as instructed in problem

0 0
Add a comment Improve this question Transcribed image text
Answer #1

Let 'A' and 'H' denote the number of AC and Heaters respectively.

Max Z = 25 A + 15 H
s.t.
3A + 2H <= 240 (wiring time)
2A + 1H <= 140 (drilling time)
A, H >= 0

In Excel, repeat the following table, select it (as shown)

=25*15 3A +2H = 240 2A + 1H <= 140 =(240-3*B3)/2 =140-2*B3 =(240-3*B4)/2 =140-2*B4 =(240-3*B5)/2 =140-2*65 =(240-3*B6)/2 =140

Then go to Insert --> Scatter --> Scatter with smoothed line

We will get this:

-3A +2H<= 240 -2A +1H<= 140 - Isoprofit line 20 40 60 80 100

Then mark the feasibility area (manually inserting 'shapes') and move the isoprofit line away from the origin (mentally).

40,60 -3A +2H<= 240 - 2A +1H<= 140 - Isoprofit line - 20 40 60 80 100

The point at which the isoprofit line leaves the feasibility region is (40, 60) and the optimal solution is:

A = 40
H = 60
Max Z = 25*40 + 15*60 = 1900

Add a comment
Know the answer?
Add Answer to:
PLEASE SHOW HOW TO GRAPH ON EXCEL. I DONT KNOW HOW TO GRAPH IT. please also...
Your Answer:

Post as a guest

Your Name:

What's your source?

Earn Coins

Coins can be redeemed for fabulous gifts.

Not the answer you're looking for? Ask your own homework help question. Our experts will answer your question WITHIN MINUTES for Free.
Similar Homework Help Questions
  • Operations Management

    can someone help me to solved this problems ? the instruction is formulate mathematical model with using excel solver.objective functionconstrainsQuestionThe Attaran Corporation manufactures two electrical products: portable air conditioners and portable heaters. The assembly process for each is similar in that both require a certain amount of wiring and drilling. Each air conditioner takes 3 hours of wiring and 2 hours of drilling. Each heater must go through 2 hours of wiring and 1 hour of drilling. During the next production...

  • Exercise 1. Found 1 JU m b y P The Electrocomp Corporation manufactures two electrical products:...

    Exercise 1. Found 1 JU m b y P The Electrocomp Corporation manufactures two electrical products: air conditioners and large fans. The assembly process for each is similar in that both require a certain amount of wiring and drilling. Each air conditioner takes 3 hours of wiring and 2 hours of drilling. Each fan must go through 2 hours of wiring and 1 hour of drilling. During the next production period, 240 hours of wiring time are available and up...

  • Need optimal solution for x,y, and value Z The Attaran Corporation manufactures two electrical products: portable...

    Need optimal solution for x,y, and value Z The Attaran Corporation manufactures two electrical products: portable air conditioners and portable heaters. The assembly process for each is similar in that both require a certain amount of wiring and drilling. Each air conditioner takes 3 hours of wiring and 2 hours of drilling. Each heater must go through 2 hours of wiring and 1 hour of drilling During the next production period, 240 hours of wiring time are available and up...

  • .EI ot slimie Final Operations Management Similar to 7-14:0 The Electrocomp Corporation manufactures two electrical products:...

    .EI ot slimie Final Operations Management Similar to 7-14:0 The Electrocomp Corporation manufactures two electrical products: air conditioners and large fans. The assembly process for each is similar in that both require a certain amount of wiring and driling. Each air conditioner takes 6 hours of wiring and 2 hours of drilling Each fan must go through 2 hours of wiring and 1 hours of drilling, During the next production period, 240 hours of wiring time are available and up...

  • Similar to 7-14 Electrocomp Corporation manufactures two electrical product ir tu The assembly process for each...

    Similar to 7-14 Electrocomp Corporation manufactures two electrical product ir tu The assembly process for each is similar in that both require a certain amount of wiring fans. and drilling Each air conditioner takes 6 hours of wiring and 2 hours of drilling. Each fan must so through 2 hours of wiring and 1 hours of drilling. During the next production period, 240 hours of wiring time are available and up to 100 hours of drilling time may be used....

  • 1. A company manufactures two products: large fans and medium fans. Each large fan requires 3...

    1. A company manufactures two products: large fans and medium fans. Each large fan requires 3 hours of wiring and 2 hours of drilling. Each medium fan requires 2 hours of wiring and 1 hour of drilling. There are 480 hours of wiring time available and 280 hours of drilling time available. Each large fan yields a profit of $25. Each medium fan yields a profit of $18. The company wants to manufacture at least 20 large fans. The objective...

  • Dear, could u please solve this question ( i also dont understand how you know if...

    Dear, could u please solve this question ( i also dont understand how you know if the car is on piston1 or 2...) A car with a mass of 960 kg is lifted with a hydraulic press. The surface of piston 1 is 20cm² and the surface of piston 2 is 0.50m² . Piston 1 has a stroke length of 20cm.       a) What is the absolute pressure of the oil in the press?       b) What force is needed...

  • Please show the steps clearly 1. A company is involved in the production of two items...

    Please show the steps clearly 1. A company is involved in the production of two items (X and Y). The resources need to produce X and Y are twofold, namely machine time for automatic processing and craftsman time for hand finishing. The table below gives the number of minutes required for each item: Table 1: Minutes required for each item Item Machine time Crafstman time Item X 13 20 Item Y 19 29 The company has 40 hours of machine...

  • 1. Consider the following LP: Max z 5x1 X2 st. 2x1 xS6 6x1X2S 12 Plot the constraints on the graph and identify the feasible region and determine the optimal value of the objective function and t...

    1. Consider the following LP: Max z 5x1 X2 st. 2x1 xS6 6x1X2S 12 Plot the constraints on the graph and identify the feasible region and determine the optimal value of the objective function and the values of the decision variables. 2. Priceler manufactures sedans and wagons. The number of vehides that can be sold each of the next three months are listed to Table 1. Each sedan sells for $10000 and each wagon sells for $11000. It cost $7000...

  • Also please solve by either using excel or R LP solvers The Magnetron Company manufactures and markets microwave ovens. Currently, the company produces two models: full-size and compact. Produc...

    Also please solve by either using excel or R LP solvers The Magnetron Company manufactures and markets microwave ovens. Currently, the company produces two models: full-size and compact. Production is limited by the amount of labor available in the general assembly and electronic assembly departments, as well as by the demand for each model. Each full-size oven requires 2 hours of general assembly and 2 hours of electronic assembly, whereas each compact oven requires 1 hour of general assembly and...

ADVERTISEMENT
Free Homework Help App
Download From Google Play
Scan Your Homework
to Get Instant Free Answers
Need Online Homework Help?
Ask a Question
Get Answers For Free
Most questions answered within 3 hours.
ADVERTISEMENT
ADVERTISEMENT
ADVERTISEMENT