Exercise 1. Found 1 JU m b y P The Electrocomp Corporation manufactures two electrical products:...
.EI ot slimie Final Operations Management Similar to 7-14:0 The Electrocomp Corporation manufactures two electrical products: air conditioners and large fans. The assembly process for each is similar in that both require a certain amount of wiring and driling. Each air conditioner takes 6 hours of wiring and 2 hours of drilling Each fan must go through 2 hours of wiring and 1 hours of drilling, During the next production period, 240 hours of wiring time are available and up...
can someone help me to solved this problems ? the instruction is formulate mathematical model with using excel solver.objective functionconstrainsQuestionThe Attaran Corporation manufactures two electrical products: portable air conditioners and portable heaters. The assembly process for each is similar in that both require a certain amount of wiring and drilling. Each air conditioner takes 3 hours of wiring and 2 hours of drilling. Each heater must go through 2 hours of wiring and 1 hour of drilling. During the next production...
PLEASE SHOW HOW TO GRAPH ON EXCEL. I DONT KNOW HOW TO GRAPH IT. please also solve as instructed in problem • B.5 The Attaran Corporation manufactures two electrical products: portable air conditioners and portable heaters. The assembly process for each is similar in that both require a certain amount of wiring and drilling. Each air conditioner takes 3 hours of wiring and 2 hours of drilling. Each heater must go through 2 hours of wiring and 1 hour of...
Need optimal solution for x,y, and value Z The Attaran Corporation manufactures two electrical products: portable air conditioners and portable heaters. The assembly process for each is similar in that both require a certain amount of wiring and drilling. Each air conditioner takes 3 hours of wiring and 2 hours of drilling. Each heater must go through 2 hours of wiring and 1 hour of drilling During the next production period, 240 hours of wiring time are available and up...
Similar to 7-14 Electrocomp Corporation manufactures two electrical product ir tu The assembly process for each is similar in that both require a certain amount of wiring fans. and drilling Each air conditioner takes 6 hours of wiring and 2 hours of drilling. Each fan must so through 2 hours of wiring and 1 hours of drilling. During the next production period, 240 hours of wiring time are available and up to 100 hours of drilling time may be used....
1. A company manufactures two products: large fans and medium fans. Each large fan requires 3 hours of wiring and 2 hours of drilling. Each medium fan requires 2 hours of wiring and 1 hour of drilling. There are 480 hours of wiring time available and 280 hours of drilling time available. Each large fan yields a profit of $25. Each medium fan yields a profit of $18. The company wants to manufacture at least 20 large fans. The objective...
The Electrotech Corporation manufactures two industrial-sized electrical devices: generators and alternators. Both of these products require wiring and testing during the assembly process. Each generator requires 2 hours of wiring and 1 hour of testing and can be sold for a $250 profit. Each alternator requires 3 hours of wiring and 2 hours of testing and can be sold for a $150 profit. There are 260 hours of wiring time and 140 hours of testing time available in the next...
The Electrotech Corporation manufactures two industrial-sized electrical devices: generators and alternators. Both products require wiring and testing during the assembly process. Each generator requires 2 hours of wiring and 1 hour of testing and can be sold for a $250 profit. Each alternator requires 3 hours of wiring and 2 hours of testing and can be sold for a $150 profit. There are 260 hours of wiring time and 140 hours of testing time available in the next production period,...
The Sharps Electrical Electronics Corporation manufactures four highly technical products that it supplies to aerospace firms that hold BGP contracts. Each of the products must pass through the following departments before they are shipped: wiring, drilling, assembly, and inspection. The time requirement in hours for each unit produced and its corresponding profit value are summarized in the following table: The production available in each department each month, and the minimum monthly production requirement to fulfil contracts, are as follows: 5 The...
Problem 3-13 (Algorithmic) Quality Air Conditioning manufactures three home air conditioners: an economy model, a standard model, and a deluxe model. The profits per unit are $59, $89, and $137, respectively. The production requirements per unit are as follows: Number of Fans Number of Cooling Coils Manufacturing Time (hours) Economy 1 1 8 Standard 1 2 12 Deluxe 1 4 14 For the coming production period, the company has 240 fan motors, 380 cooling coils, and 2500 hours of manufacturing...