Design Principles Canvas Ā 8 pts Question 35 Five batch jobs, A, B, C, D, and E, arrive at a computer system at time 0, 1, 2,

0 0
Add a comment Improve this question Transcribed image text
Answer #1

Question - 35 process А BT 7 - Flo-oom I 2 3 G D E 4 Round Robin - Tq=2 Sum = 42 Turn around time Sum= 62 Average waiting tim2 HORN :- (non -premptive) Turnaround time Sum= 51 waiting time Sum= 31 Average Average TAT= 10:20 WT - 6,20 classmateArr_time[1] : 0 Arr_time[2] : 1 Arr_time[3] : 2 Arr_time[4] : 3 Arr_time[5] : 4 Burst_time[1] : 7 Burst_time[2] : 1 Burst_timEnter the no.of processes : 5 Arr_time[1] : 0 Arr_time[2] : 1 Arr_time[3] : 2 Arr_time[4] : 3 Arr_time [5] : 4 Burst_time[1]Enter the number of Processes: 5 Arr_time[1] : 0 Arr_time[2] : 1 Arr_time [3] : 2 Arr_time[4] : 3 Arr_time[5] : 4 Burst_time[Enter the no.of processes : 5 Arr_time[1] : 0 Arr_time[2] : 1 Arr_time[3] : 2 Arr_time[4] : 3 Arr_time[5] : 4 Burst_time[1] :

Add a comment
Know the answer?
Add Answer to:
Design Principles Canvas Ā 8 pts Question 35 Five batch jobs, A, B, C, D, and...
Your Answer:

Post as a guest

Your Name:

What's your source?

Earn Coins

Coins can be redeemed for fabulous gifts.

Not the answer you're looking for? Ask your own homework help question. Our experts will answer your question WITHIN MINUTES for Free.
Similar Homework Help Questions
  • Five batch jobs, A through E, arrive in alphabetical order at a computer at almost the...

    Five batch jobs, A through E, arrive in alphabetical order at a computer at almost the same time (i.e. they all arrive before the next scheduling event occurs). They have estimated running times of 500, 300, 600, 700, and 200 ms, respectively. Using diagrams, show how the process scheduling algorithms below would schedule these jobs, and calculate the mean process turnaround time (assuming no process switching overhead): FCFS SPN RR with a quantum of 100ms RR with a quantum of...

  • C language show all work 1. [50 pts] Given the following set of processes, with arrival...

    C language show all work 1. [50 pts] Given the following set of processes, with arrival times, priorities, and the length of the CPU burst in ms: Priority Arrival Time Burst time Process P1 P2 P3 P4 4. 3 2 0 0 10 (Note: lower number means higher priority, processes P1, P2, P3, and P4 arrive at the same time, in the given order). a. Draw a Gantt chart showing a FCFS scheduling algorithm. b. Draw a Gantt chart showing...

  • XCOB 8 pts Question 1 The fill-in-the-blanks of this question are based on the problem data...

    XCOB 8 pts Question 1 The fill-in-the-blanks of this question are based on the problem data given below where 5 processes arrive in the order P1, P2, P3, p4 and P5, all at the time instant 0. In this problem priority increases with decreasing priority number, so the process with priority number 1 has the highest priority. Each of these blanks requires a single number to be written as answer, rounded off to one decimal place. For example, 5.3287 is...

  • Five batch jobs (A,D,I,J,K) arrive at a computer at the same time(at time=0). The quantum size...

    Five batch jobs (A,D,I,J,K) arrive at a computer at the same time(at time=0). The quantum size of this system is 2 units of time. For each of the scheduling methods given below, calculate the average waiting time for the 5 jobs. Show (use timing diagrams) and explain your steps. You can prepare it by hand or on a computer. The following jobs and the estimated running times are defined: A 2 B 6 C 4 D 8 E 2 F...

  • operating system question. Table 9.5 and figure 9.5: Problem Description Consider the following set of processes...

    operating system question. Table 9.5 and figure 9.5: Problem Description Consider the following set of processes and arrival and processing time in- formation: Process Arrival Time Processing Time | C C C - Perform the same analysis as depicted in Table 9.5 and Figure 9.5 from our textbook for this set of processes. For the submission of this assignment for this class, you need to do FCFS, RR with a time quantum of 4, SPN, and SRT only (though I...

  • Please answer the following question in C++ language Consider the following set of processes, with the...

    Please answer the following question in C++ language Consider the following set of processes, with the length of the CPU burst time given in milliseconds: Process            Burst Time      Priority P1. 7 5 P2 2 4 P3 11 3 P4 9 1 P5 5 3 The processes are assumed to have arrived in the order P1,P2, P3, P4, P5, all at time 0. a. Draw four Gantt charts that illustrate the execution of these processes using the following scheduling algorithms: FCFS, SJF, nonpreemptive...

  • Implement the following 3 CPU scheduling algorithms Simulate and evaluate each with the set of eight...

    Implement the following 3 CPU scheduling algorithms Simulate and evaluate each with the set of eight processes below. Use any programming language. The program listing should be submitted with the report. FCFS (First Come First Serve) non-preemptive (partial results provided) SJF non-preemptive MLFQ Multilevel Feedback Queue (absolute priority in higher queues)             Queue 1 uses RR scheduling with Tq = 5             Queue 2 uses RR scheduling with Tq = 10             Queue 3 uses FCFS All processes enter first...

  • Assume a dynamic queue which is serviced by a Priority Based Round Robin algorithm such that ther...

    Assume a dynamic queue which is serviced by a Priority Based Round Robin algorithm such that there exists three priorities (1,2,3) which are used as multipliers of the basic time quantum value with the resulting number being the maximum service time the corresponding job will receive each time it gets the CPU. For a maximum amount of time equal to 1 basic time quantum , a priority 2 job gets the CPU for the maximum amount of time equal to...

  • scheduling program in C, please help 1 Objectives This programming project is to simulate a few...

    scheduling program in C, please help 1 Objectives This programming project is to simulate a few CPU scheduling policies discussed in the class. You will write a C program to implement a simulator with different scheduling algorithms. The simulator selects a task to run from ready queue based on the scheduling algorithm. Since the project intends to simulate a CPU scheduler, so it does not require any actual process creation or execution. When a task is scheduled, the simulator will...

ADVERTISEMENT
Free Homework Help App
Download From Google Play
Scan Your Homework
to Get Instant Free Answers
Need Online Homework Help?
Ask a Question
Get Answers For Free
Most questions answered within 3 hours.
ADVERTISEMENT
ADVERTISEMENT
ADVERTISEMENT