1. Given the following horizontal curve and spiral data: Total tangent deflection angle (A) = 30° Rt. D = 5° Design Speed = 5
Spiral Curve Equations Spiral Tangent Deflection 43 LD 200 Total Deflection A = 4c+ 24, Total Length L = Le + 21 Spiral Defle
Table 13.9 SPIRAL CURVE LENGTHS AND SUPERELEVATION RATES: SUPERELEVATION (e) MAXIMUM OF 0.100, TYPICAL FOR SOUTHERN CLIMATES
PI 4 I, CPI TAC To ST To sܠ܂ S.C. C.S. SPIL LS LT SPI, o 20s LC 3 g Ac 4 S.T. T.S. Back Tangent Forward Tangent 0 Symbols T.
Table 13.8 SPIRAL CURVE LENGTHS AND SUPERELEVATION RATES: SUPERELEVATION (e) MAXIMUM OF 0.06, TYPICAL FOR NORTHERN CLIMATES V
0 0
Add a comment Improve this question Transcribed image text
Answer #1

0 Two lane Road in Soutbren Climate A = 30° D=5° Design Speed - 50 mph PI Station @ 64 + 20.00 From Table 13.8 For a lone Roa

Add a comment
Know the answer?
Add Answer to:
1. Given the following horizontal curve and spiral data: Total tangent deflection angle (A) = 30°...
Your Answer:

Post as a guest

Your Name:

What's your source?

Earn Coins

Coins can be redeemed for fabulous gifts.

Not the answer you're looking for? Ask your own homework help question. Our experts will answer your question WITHIN MINUTES for Free.
Similar Homework Help Questions
  • 1. Given the following horizontal curve and spiral data: Total tangent deflection angle (A) = 30°...

    1. Given the following horizontal curve and spiral data: Total tangent deflection angle (A) = 30° Rt. D=50 Design Speed = 50 mph Two lane road in Southern Climate PI Station @ 64+20.00 Find and e from Table 13.8 or 13.9 (see handouts) Compute: R P= Compute the stations of: T.S. = S.C. = C.S. S.T. = Compute the Long Tangent and the Short Tangent PI 4 CPI To AC ST To S.C. C.S. SPI, SPI -Ls 20$ Cc 3...

  • no you dont. let someone else answer it. 1. Given the following horizontal curve and spiral...

    no you dont. let someone else answer it. 1. Given the following horizontal curve and spiral data: Total tangent deflection angle (A) = 30° Rt. D= 5° Design Speed = 50 mph Two lane road in Southern Climate PI Station @ 64+20.00 Find and e from Table 13.8 or 13.9 (see handouts) Compute: = R P= Compute the stations of: T.S. = S.C. C.S. = S.T. = Compute the Long Tangent and the Short Tangent Table 13.9 SPIRAL CURVE LENGTHS...

  • 25. A spiral curve with a length of 50 feet connects a tangent to a curve...

    25. A spiral curve with a length of 50 feet connects a tangent to a curve having a radius of 100 feet. Deter- mine the offset from the tangent to the point where the spiral connects to the curve and the length of throw from the tangent. 26. Given a spiral curve with a length of 150 feet, which connects a tangent to a curve having a radius of 200 feet, determine the offsets from the tangent to the midpoint...

  • 1)A horizontal curve connects two tangents that deflect at an angle of 45o on a two...

    1)A horizontal curve connects two tangents that deflect at an angle of 45o on a two lane rural collector highway. The point of intersection of the tangents is located at station (658 + 16.13). If the design speed of the highway is 70 km/h and max. allowable superelevation rate is used. Determine the length of curve, degree of curve, point of curvature, point of tangency, and the ordinates. 2)For the information given in question 1above, and if the highway enters...

  • 12. Consider the data taken in lab for the following reaction. Given the slopes of tangent...

    12. Consider the data taken in lab for the following reaction. Given the slopes of tangent lines for two data points, solve for the reaction rate constant for the following reaction. AB → AB 046 Rate of Change of (AB) 062 036 014 [AB] When (AB) = 0.302. AAB)-267 x 10 st 02 024 022 016 0.14 012 When (AB) = 0.149, [AB]= 6.51 x 10 00 000 004 > so 75 100 125 150 175 200 225 230 275...

  • 6. Elasticity and total revenue The following graph shows the dally demand curve for bikes in...

    6. Elasticity and total revenue The following graph shows the dally demand curve for bikes in New York City. Use the green rectangle (triangle symbols) to compute total revenue at various prices along the demand curve Note: You will not be graded on any changes made to this graph. 300 275 250 225 Total Revenue 175 150 125 100 75 50 03 6912 1518 21 24 27 30 33 36 QUANTITY (Bikes) On the following graph, use the green point...

  • Attempts: Average: 1 4 6. Elasticity and total revenue The following graph shows the daily demand...

    Attempts: Average: 1 4 6. Elasticity and total revenue The following graph shows the daily demand curve for bikes in Denver. Use the green rectangle (triangle symbols) to compute total revenue at various prices along the demand curve. Note: You will not be graded on any changes made to this graph. 300 275 250 225 a 200 Total Revenue We were unable to transcribe this imageWe were unable to transcribe this imageS 1740 1500 t 1260 1020 o 25 50...

  • Referring to the following data sheets calculate the switching loss for the IGBT: Given, E =...

    Referring to the following data sheets calculate the switching loss for the IGBT: Given, E = 400V, ID= 56A, Fs = 18.5kHz, VDS= 300V, VGS= +/- 18V, RG = 22ohm. Turn-on and Turn-off Energy: IGBT Eon E (mWs) Eoff 20 40 80 100 120 60 Ic (A) SKM50GB063D Values Unit Absolute Maximum Ratings Symbol Conditions IGBT VCES T = 25°C Ic To = 25 °C T = 150°C To = 75 °C Cnom | |сем CRM = 2xl nom 600...

ADVERTISEMENT
Free Homework Help App
Download From Google Play
Scan Your Homework
to Get Instant Free Answers
Need Online Homework Help?
Ask a Question
Get Answers For Free
Most questions answered within 3 hours.
ADVERTISEMENT
ADVERTISEMENT
ADVERTISEMENT