Question

In a food manufacturing factory, there is only one machine which can produce items A to...

In a food manufacturing factory, there is only one machine which can produce items A to F. Based on customer demands, the Production Manager has determined that the sequence of producing these items are as shown in the table: Sequence Item Production Quantity Production Duration in days 1 A 500 1 2 B 1500 3 3 C 1000 2 4 D 1500 3 5 E 500 1 6 F 500 1 Use the information in the table to draw the Gantt chart and to determine the production end date (10

0 0
Add a comment Improve this question Transcribed image text
Answer #1

Answer:

The sequence of production is shown below:

Sequence

Item

Production Quantity

Production Duration in days

1

A

500

1

2

B

1500

3

3

C

1000

2

4

D

1500

3

5

E

500

1

6

F

500

1

Based on the above data, below is the Gantt chart:

Days Sequence Item 1 3 4 5 6 7 8 9 10 11 12 13 14 15 N 1 A 500 2 B 1500 3 C 1000 4 D 1500 5 E 6 F 500 500 1 Project end date

Hence, the production end date is day 11.

------------------------------------------------------------------------

Note: If you liked the answer please give an Up-vote, this will be quite encouraging for me, thank you!

Add a comment
Know the answer?
Add Answer to:
In a food manufacturing factory, there is only one machine which can produce items A to...
Your Answer:

Post as a guest

Your Name:

What's your source?

Earn Coins

Coins can be redeemed for fabulous gifts.

Not the answer you're looking for? Ask your own homework help question. Our experts will answer your question WITHIN MINUTES for Free.
Similar Homework Help Questions
  • Question 4 (30 marks) According to Richard Lansburgh and William Spriegel (1995), "Scheduling involves establishing the...

    Question 4 (30 marks) According to Richard Lansburgh and William Spriegel (1995), "Scheduling involves establishing the amount of work to be done and the time each element of the work will start, or the order of work. (a) Why is Scheduling important in Operations & Logistics Management and explain the factors affecting Scheduling? (15 marks) (b) The Gantt chart is a scheduling method used in Operations Management Explain the use and importance of the Gantt Chart (5 marks). (c) In...

  • Please show the steps clearly 1. A company is involved in the production of two items...

    Please show the steps clearly 1. A company is involved in the production of two items (X and Y). The resources need to produce X and Y are twofold, namely machine time for automatic processing and craftsman time for hand finishing. The table below gives the number of minutes required for each item: Table 1: Minutes required for each item Item Machine time Crafstman time Item X 13 20 Item Y 19 29 The company has 40 hours of machine...

  • Previous Problem List Next (1 point) In a certain factory, the cost to produce q items...

    Previous Problem List Next (1 point) In a certain factory, the cost to produce q items during a single production run is estimated to be C(q) = 50q+0.005q² + 1000 (dollars). The factory utilizes 12-hour production runs and it is estimated that the number of units that can be produced in the first t hours of a production run is given by: 300+ if 0 <t<4 g(t) = 260t + 160 if 4 < t < 8 292t - 2+2...

  • 3.26. Manufacturing Bayes. A factory has three types of machines producing an item. The probabilities that...

    3.26. Manufacturing Bayes. A factory has three types of machines producing an item. The probabilities that the item is conforming if it is produced on the ith machine are given in the following table: Type of machine Probability of item conforming 2 3 0.94 0.95 0.97 The total production is distributed among the machines as follows: 30% is done on type 1,50% on type 2, and 20% on type 3 machines. One item is selected at random from the production...

  • (I just need Question 2)Please show the steps clearly contract to produce 10 items of x...

    (I just need Question 2)Please show the steps clearly contract to produce 10 items of x per week for a particular customer. • Part (a). Formulate the problem of deciding how much to produce per week as a linear program. • Part (b). Draw the feasible region of your LP formulation. • Part (c). Find the optimal solution of your LP model using graphical solution method. 2. Consider a factory that produces tables. The demand for the tables is known...

  • A company can either produce the substrate for a semiconductor chip in-house (at its factory) or...

    A company can either produce the substrate for a semiconductor chip in-house (at its factory) or it can buy the substrate from a contractor. If the substrate is produced in-house, there is a $20 cost each time the machine is set up and each set-up requires 2.75 days. The production rate is 100 units per day. The cost of materials is $3 for each substrate produced. If the substrate is purchased from a contractor, then it will cost $3 for...

  • A machine is supposed to produce four different products. The relevant information is given in the...

    A machine is supposed to produce four different products. The relevant information is given in the following table. Product Monthly Demand Processing time per unit Units in minutes 1 2500 6.0 2 8000 5.0 3 7000 2.0 4 1500 9.0 In a month, there are 20 working days with 8 working hours for each day. (a) (12 points) Compute the total time in minutes required to produce all the units in the month (b) (5 points) Compute total time in...

  • Q4: 3 marks A manufacturer has three machines I, Il and Il installed in his factory....

    Q4: 3 marks A manufacturer has three machines I, Il and Il installed in his factory. Machines I and Il are capable of being operated for at most 12 hours whereas machine III must be operated for at least 5 hours a day. She produces only two items M and N each requiring the use of all the three machines. The number of hours required for producing 1 unit of each of M and N on the three machines are...

  • use your own words, don't copy and paste, don't use handwriting, please. please help me to...

    use your own words, don't copy and paste, don't use handwriting, please. please help me to answer all Questions please:( ______________________ Q2: Suppose a project X is half completed by the end of first month. Upto this duration the rate of performance is 50 percent. Complete the below table by using given values and explain about the budget and schedule on the basis of calculations. Earned value calculations for project X after 1 month are as follows: PV=8000 SR                     AC=20000...

  • 2. Problems and Applications Q2 An American worker can produce either 5 cars or 9 tons...

    2. Problems and Applications Q2 An American worker can produce either 5 cars or 9 tons of grain a year. A Japanese worker can produce either 3 cars or 9 tons of grain a year. To keep things simple, assume that each country has 100 million workers. Complete the following table with the number of workers needed to make one car or 1 ton of grain in the United States and Japan. Workers Needed to Make 1 Car1 Ton of...

ADVERTISEMENT
Free Homework Help App
Download From Google Play
Scan Your Homework
to Get Instant Free Answers
Need Online Homework Help?
Ask a Question
Get Answers For Free
Most questions answered within 3 hours.
ADVERTISEMENT
ADVERTISEMENT
ADVERTISEMENT