2. Design a trapezoidal channel to pass a discharge of 10m3/s and the channel will be...
1. Design a suitable section for the overflow portion of a concrete gravity dam having the downstream face sloping at a slope of 0.7 H: 1 V. The design discharge for the spillway is 8,000 mº/s. The height of the spillway crest is kept at RL 204.0 m. The average river bed level at the site is 100.0 m. The spillway length consists of 6 spans having a clear width of 10 m each. Thickness of each pier may be...
4.17. Design a riprap-lined trapezoidal channel that has a capacity of 1000 cfs and a slope of 0.0005 ft/ft. Crushed rock is to be used and the channel bottom width is not to exceed 15 f. Determine the riprap size, the side slopes, and the design depth of flow 4.17. Design a riprap-lined trapezoidal channel that has a capacity of 1000 cfs and a slope of 0.0005 ft/ft. Crushed rock is to be used and the channel bottom width is...
8411446c or is m 3/s The channel wl be cxcavated through sach that a botom slope of 1 Problem 2 (10pts): rock (0B5) with a side slope IR-4V.The topography in the area is in 3500 will be suitable 8411446c or is m 3/s The channel wl be cxcavated through sach that a botom slope of 1 Problem 2 (10pts): rock (0B5) with a side slope IR-4V.The topography in the area is in 3500 will be suitable
A concrete-lined (smooth) trapezoidal channel with a bottom width of 10 ft and side slope 2 horizontal to 1 vertical has a slope 0,002 and is designed for a discharge of 160 cts. Determine the water depth in the channel,
Determine the cross section of the greatest hydraulic efficiency for a trapezoidal channel with side slope of 1 vertical to 2 horizontal if the design discharge is 250 m3/s. The channel slope is 0.001 and Manning’s roughness factor is 0.020.
Determine the cross-section of the greatest hydraulic efficiency for a trapezoidal channel with side slope of 1 vertical to 2 horizontal if the design discharge is 10 m3/s. The channel slope is 0.001 and Manning’s roughness factor is 0.020.
A trapezoidal channel has a bottom width 10 ft and side slope of 2H:1V. It carries a discharge of 250 cfs at a water depth of 4.8ft. The channel is to pass under a highway and a culvert is proposed for a smooth transition from the channel to the culvert. You are asked to design this transition under the following design criteria: First of all, it is important to keep in mind that the culvert shall not act as a...
#4 [5 points] A trapezoidal channel of bottom width 25 ft and side slope 1:2.5 carries a discharge of 450 cfs with a normal depth of 3.5 ft. The elevations at the beginning and end of the channel are 685 and 650 ft., respectively. Determine the length of the channel if n = 0.02. #5 [5 points] Water is flowing at a rate of 4.5 m3/s in a trapezoidal channel whose bottom width is 2.4 m and side slopes are...
Design a channel to carry a flow of 6 m3/s. The channel will be excavated through loose sandy soil at a channel bottom slope of 0.003 (assume n 0.025)
Q2) A canal of trapezoidal section has bed width of 8 m and bed slope of 1 in 4000. If the depth of flow is 2.4 m and side slopes of the chamel are 1 horizontal to 3 vertical, determine the average flow velocity and the discharge carried by the channel. Also compute the average shear stress at the channel boundary. Take value of Chezy's constant = 55. Q3) 6.11. A power canal of trapezoidal section has to be excavated...