the question: a firm makes products A and B. Product A takes 2 hours each on...
State the linear programming problem in mathematical terms, identifying the objective function and the constraints A firm makes products A and B. Product A takes 3 hours each on machine L and machine M; product B takes 4 hours on L and 3 hours on M. Machine L can be used for 12 hours and M for 10 hours. Profit on product A is $7 and $9 on B. Maximize profit. Maximize 7A 9B Subject to: 3A +4B s 12...
Zapit, Inc. manufactures two products, Product A and Product B. Product A yields an incremental profit of $2 per unit, and Product B yields an incremental profit of $4. Product A requires four hours of processing at Machine A and two hours at Machine B. Product B requires six hours at Machine A, six hours at Machine B, and one hour at Machine C. Machine A has a maximum of 120 hours of available capacity per day, Machine B has...
A company wants to determine how many units of each of two products, A and B, they should produce. The profit on product A is $50 and the profit on product B is $45. Applying linear programming to this problem, which of the following is the objective function if the firm wants to make as much money as possible? Maximize Z = A/45B + B/50A Minimize Z = 50 A + 45 B Maximize Z = A + B Minimize...
A company makes two products (X and Y) using two machines (A and B). Each unit of X that is produced requires 50 minutes processing time on machine A and 30 minutes processing time on machine B. Each unit of Y that is produced requires 24 minutes processing time on machine A and 33 minutes processing time on machine B. At the start of the current week there are 30 units of X and 90 units of Y in stock....
A machine can make two products : A and B. the time taken to make A is Ta(hours) and that to make B is Tb(hours),the profit of a unit product B is pb.write the objective function to maximise the total profit based on a 24 hour schedule and the constraints to optimise the production quantities of A and B.
basic physics knowledge (: Problem 2) Consider six bars numbered 1 through 6. The ends of each bar are labeled A and B, and the middle of each bar is labeled m. Assume that any bars that are magnets have their poles on the ends A and B. A student makes the following observations: 2m interacts with 4A 1A is attracted to 2B 3B does not interact with 6B 4B is repelled by 6A. 2A interacts with 6m 5A is...
Hart Manufacturing makes three products. Each product requires manufacturing operations in three departments: A, B, and C. The labor-hour requirements, by department, are as follows. Department Product 1 Product 2 Product 3 A 1.50 3.00 2.00 B 2.00 1.00 2.50 с 0.25 0.25 0.25 During the next production period, the labor-hours available are 450 in department A, 350 in department B, and 50 in department C. The profit contributions per unit are $27 for product 1, $29 for product 2,...
Question 4 - What is the best solution? Asmall farm makes the similar animal fodies Product Are Sho whour. O material 4 minutes of mixing using a mix-machine product requires 6 hours of w a l e s of mixing and productores 4 hours of labour, Skg of raw matal i king The firm has 210 hours available during the next period for labour. 200 kg of w e aland 170 forming Product contributes $28.00 per unit to profit, product...
3 Question 2. Hart Manufacturing makes 3 products. Each product requires manufacturing operations in three departments: A, B, C. The labor requirements (in hour), by department, are as follows: Department Product 1 Product 2 Product 3 A 2 B 2.5 с 0.25 During the next production period the labor-hours available are 450 in department A, 350 in department B, and 50 in department C. The profit contributions per unit are $25 for product 1, $28 for product 2, and $30...
Guide Stone Manufacturing makes three products. Each product requires manufacturing operations in three departments: A, B, and C. The labor-hour requirements, by department are as follows. Department Product 1 Product 2 Product 3 A 1.50 3.00 2.00 B 2.00 1.00 2.50 C 0.25 0.25 0.25 During the next production period, the labor-hours available are 450 in department A, 350 in department B, and 50 in department C. The profit contributions per unit are $25 for product 1, $28 for product...