QUESTION 6
Ang company that produces pleasure boats has decided to expand
one of its lines. The company is considering three Location
alternatives. The cost structure for each location is given as
shown in the table.
Location |
Fixed Cost/yr |
variable cost/unit |
L1 |
13,515 |
2.3 |
L2 |
8,605 |
3.1 |
L3 |
6,388 |
4.1 |
Solution:
Let,
FC = Fixed Cost
VC = Variable Cost Per Unit
Then,
Cross Over Point Between Two Locations = Absolute Difference Between Fixed Costs of Two Locations / Absolute Difference Between The Variable Cost Per Unit of Two Locations
Thus,
(Rounded to the nearest whole number)
Hence,
Answer a:
The range of output for L1 resulting in the lowest total cost = 6138 and More
Answer b:
The range of output for L2 resulting in the lowest total cost = 2217 to 6138
Answer c:
The range of output for L3 resulting in the lowest total cost = 0 to 2217
Answer d:
TC = Total Cost = FC + (Q x VC)
Where, Q = 1505 Boats
Thus,
Hence, the alternative location L3 yields the lowest total cost for the expected annual volume of 1505 boats
(Kindly raise an upvote for this answer, if you found it useful)
QUESTION 6 Ang company that produces pleasure boats has decided to expand one of its lines....
Ang company that produces pleasure boats has decided to expand one of its lines. The company is considering three Location alternatives. The cost structure for each location is given as shown in the table. Location LI L2 L3 Fixed Cost/yr 13,515 8,605 6,388 variable cost/unit 2.3 3.1 4.1 (Ex. In (Ex. In a) The range of output for location alternative 1 that would yield the lowest total cost is whole number, use Q, << >, >=to specify the range) b)...
Ang company that produces pleasure boats has decided to expand one of its lines. The company is considering three Location alternatives. The cost structure for each location is given as shown in the table. Location Fixed Cost/yr variable cost/unit L1 7,958 3.1 L2 5,879 4.5 L3 11,897 2.2 a) The range of output for location alternative 1 that would yield the lowest total cost is ______ (Ex. In whole number, use Q, <, <=, >, >= to specify the range)...
QUESTION 6 Ang company that produces pleasure boats has decided to expand one of its lines. The company is considering three Location alternatives. The cost structure for each location is given as shown in the table. Location variable cost/unit LI Fixed Cost/yr 11,802 6,128 8,591 2.4 4.2 L2 L3 3.0 a) The range of output for location alternative 1 that would yield the lowest total cost is (Ex. In whole number, use Q, <<,>, >= to specify the range) b)...
QUESTION 6 Ang company that produces pleasure boats has decided to expand one of its lines. The company is considering three Location alternatives. The cost structure for each location is given as shown in the table. Location Fixed variable Costyr cost/unit LI 9.687 1.8 L2 6,358 2.8 L3 4,600 4.3 (Ex. In whole (Ex. In whole a) The range of output for location alternative I that would yield the lowest total cost is number, use Q. <<-> to specify the...
please show answers clearly Ang company that produces pleasure boats has decided to expand one of its lines. The company is considering three Location alternatives. The cost structure for each location is given as shown in the table Location LI L2 L3 Fixed Cost/yr 8,500 6,500 13,500 variable cost/unit 3.2 4.3 2.5 a) The range of output for location alternative that would yield the lowest total cost is (Ex. In whole number, use Q.<< >>=to specify the range) b) The...
h * Question Completion Status: QUESTION 6 Ang company that produces pleasure boats has decided to expand one of its lines. The company is considering three Location alternatives. The cost structure for each location is given as shown in the table. Location Fixed Cost/yr L1 L2 L3 7,958 5,879 11,897 variable cost/unit 3.1 4.5 2.2 (Ex. In a) The range of output for location alternative 1 that would yield the lowest total cost is whole number, use Q, <<, >,...
A company that produces pleasure boats has decided to expand one of its lines. Current facilities are insufficient to handle the increased workload, so the company is considering three alternatives, A (new location), B (subcontract), and C (expand existing facilities) Alternative A would involve substantial fixed costs but relatively low variable costs: fixed costs would be $305,000 per year, and variable costs would be $550 per boat. Subcontracting would involve a cost per boat of $2,520, and expansion would require...
A company that produces pleasure boats has decided to expand one of its lines. Current facilities are insufficient to handle the increased workload, so the company is considering three alternatives, A (new location), B (subcontract), and C (expand existing facilities). Alternative A would involve substantial fixed costs but relatively low variable costs: fixed costs would be $290,000 per year, and variable costs would be $570 per boat. Subcontracting would involve a cost per boat of $2,520, and expansion would require...
A company that produces pleasure boats has decided to expand one of its lines. Current facilities are insufficient to handle the increased workload, so the company is considering three alternatives, A (new location), B (subcontract), and C (expand existing facilities). Alternative A would involve substantial fixed costs but relatively low variable costs: fixed costs would be $295,000 per year, and variable costs would be $590 per boat. Subcontracting would involve a cost per boat of $2,550, and expansion would require...
Write a C program for: One technique for dealing with deadlock is called “detect and recover.” In this scheme, some procedure is used to identify when a deadlock occurs, and then another procedure is used to deal with the blocked processes. One technique to identify a deadlock is to maintain a resource graph that identifies all processes, all resources, and the relationships between them (that is, which processes exclusively own which resources, and which processes are blocked waiting for which...