Engineering economics
I need a solution within half an hour
Engineering economics I need a solution within half an hour The installation cost of a 20...
This question concerns the Engineering economics I needed the solution within half an hour يجب اخذ ثلاث مراتب بعد الفارزة في النواتج. The installation cost of a 20 m3 (cubic meter) stainless-steel tank in 1975 was $5000. The tank is cylindrical with flat top and bottom, and the diameter is 6 m. If the entire outer surface of the tank is to be covered with 2-in. thickness of Magnesia block, estimated the present total cost for the insulated tank at...
(The installation cost of a 20 m3 (cubic meter) stainless-steel tank in 1975 was $5000. The tank is cylindrical with flat top and bottom, and the diameter is 6 m. If the entire outer surface of the tank is to be covered with 2-in. thickness of Magnesia block, estimated the present total cost for the insulated tank at 1980. The cost for the 2-in. magnesia block was $1.40 per m2 (square meter) while the labor for installing the insulation was...
The installation cost of a 20 m3 (cubic meter) stainless-steel tank in 1975 was $5000. The tank is cylindrical with flat top and bottom, and the diameter is 6 m. If the entire outer surface of the tank is to be covered with 2-in. thickness of Magnesia block, estimated the present total cost for the insulated tank at 1980. The cost for the 2-in. magnesia block was $1.40 per m2 (square meter) while the labor for installing the insulation was...
This question concerns the Engineering economics I needed the solution within half an hour Example 5. Estimation of fixed-capital investment with power facter applied to plant-capacity ratio If the process plant, described in Example 1, (was erected in the Dallas area for a fixed-capital investment of $436,000 in 1970, determine what the estimated fixed-capital investment would have been in 1975 for a similar process plant located near Los Angeles with twice the process capacity but with an equal number of...
Engineering Economics .... I need to solution this question within less than half hour necessary and very urgently , please please show step by step A reactor, which will contain corrosive liquid, has been design. If the reactor is made of mild steel, the initial installed cost will be $6000, and the useful life period will be 4 years. Since stainless steel is highly resistant to the corrosive action of the liquids, stainless steel, as the material of construction, has...