Three components A,B and C are connected in series with the given reliabilities.
R(A)=0.99, R(B)=0.98 and R(C)=0.97
The reliability of the system will be R = R(A)*R(B)*R(C)
R = (0.99)(0.98)(0.97) = 0.94109 ~ 0.94
Hence the correct answer is the first option 0.94
Question 5 20 pts Given components with the following reliabilities, A-0.99,-0.98, and C0.97. The components A,...
Question 1 20 pts Given components with the following reliabilities A-0.99,B-0.98, and C=0.97. assume the components are connected in parallel What is the reliability of the system? (round to 6 decimal places) O 0.9998 O 0.999940 O 0.999400 0.999994 Question 2 20 pts What is the reliability of a five-component parallel system when the reliabilities of each component are 0.707 (round to 4 decimal places) O 0.9919 O 0.9976 0.9813 O 0.1681
A system is composed of three components. Two of the components are in parallel reliabilities of 0.98 and 0.99. The third component has a reliability if 0.97 and is in series with the first combination. What is the overall system reliability? a) 0.945 b) 0.873 c) 0.696 d) 0.949 e) none of the above
5. With the booming world economy, the 2x4 lumber consumed in the construction industry is considerably increasing. To obtain the 2x4's that meet the quality requirements the milling system for 2x4's needs to be effective. The following reliability diagram is established. What is the reliability of the milling system? 0.61 10.8 1 | 0.89] → [06 1 0.92] | 0.95 | | 0.65 | - 0.95 ] → 0.67 ] - 0.69 | b) A system for milling 2x6's has...
Question 3 20 pts A system has three components with reliability values A, B, and C. The reliability of the system. R. can be calculated using the equation 1.R - A+B+C 2.R-AxBxC 3. Insufficient Information has been provided. 4. R = 1 - (1 - A)(1-B1-C)] 04 O 2 U Question 4 20 pts A system is made up of four independent components in series each having a failure rate of .005 failures per hour. If time to failure is...
9.23 An engineer designs a system consisting of two subsystems in series. The reliabilities are R 0.98 and Re 0.94. The cost of the two subsystems is about equal. The engineer decides to add two redundant components Which of the following would it be better to do? (a) Duplicate subsystems 1 and 2 in high-level redundance. (b) Duplicate subsystems 1 and 2 in low-level redundance (c) Replace the second subsystem with 1/3 redundance Justify your answer. 9.23 An engineer designs...
1. With the booming world economy, the 2x4 lumber consumed in the construction industry is considerably increasing. To obtain the 2x4's that meet the quality requirements the milling system for 2x4's needs to be effective. The following reliability diagram is established. What is the reliability of the milling system? 0.55 0.87 0.94 0.6 0.94 0.64 0.93 0.65 0.65 b) A system for milling 2x6's has four sensitive components connected in series with reliabilities of 0.92, 0.72, 0.84 and 0.85. According...
[Question 4: 20 points) Find the system reliability of the following series-parallel configurations using component reliabilities. 0.75 0.80 0.90 0.75 0.90 0.80 0.80 0.90 0.9 (b)
To determine if their 1.00 centimeter washers are properly adjusted, Reeves Inc. has decided to use an x‾-Chart which uses the range to estimate the variability in the sample. Step 2 of 7 : What is the Upper Control Limit? Round your answer to three decimal places. Period obs1 obs2 obs3 obs4 obs5Sample Mean Sample Range 1.01 1.00 0.98 0.98 1.031.0000 2 |0.97 0.99 0.95 0.96 1.03 0.9800 3 1.03 0.98 1.02 1.03 1.01 1.0140 4 0.97 0.98 1.04 1.02...
A piece of equipment contains 20 components of Type A, 15 of Type B, and 10 of Type C. The probability of operating successfully in its first 5000 hours of use is 0.98 for Type A components, 0.97 for Type B components, and 0.96 for Type C components. Assuming all components operate independently, what is the probability that every component operates successfully in its first 5000 hours of use? Write your answer as a decimal rounded to 4 places.
? O I Do Homework Nice River A Manufacture of Disk Drives For Notaba MAN 3504 Spring 2020 MOD 1 Section 3445 Homework: Homework 7 Score: 0 of 1 pt 9 of 15 (8 complete) Question 9, Problem 17.14 As VP for operations at Mendez-Pinero Engineering, you must decide which product design. A or B, has the higher reliability. B is designed with backup units for components Rs and Re- Product Design A R7 -0.97 R=0.93_R=0.986 R -0.992 Product Design...