Problem 12 TOC PROBLEM GENERAL INFORMATION PRODUCT X S.P. = $3000 D= 100/WK PRODUCT Y S.P. = $2000 D= 200/WK Machine 1 ==> 1

0 0
Add a comment Improve this question Transcribed image text
Answer #1

1)

Load of Assembly station = 100*10+200*5 = 2000 minutes

Load of Machine 1 = 100*7+200*8+2*240 = 2780 minutes

Load of Machine 2 = 100*5+200*(5+3)+2*30 = 2160 minutes

Load of Machine 3 = 100*22+200*0+90 = 2290 minutes

Load of Machine 4 = 100*10+200*10+60 = 3060 minutes

Load of Machine 4 is the highest. therefore, Machine 4 is the system constraint.

.

2)

Contribution margin of product X per minute of bottleneck time = (3000-500-500)/10 = $ 200

Contribution margin of product Y per minute of bottleneck time = (2000-500-100)/10 = $ 140

Production of products is prioritized in order of their contribution margin per minute of bottleneck time.

Therefore, product X is given first priority

Time available on bottleneck machine 4 after fulfilling demand of product X = 2400 - (100*10) - 60 = 1340 minutes

Quantity of product Y that can be produced in remaining time = 1340/10 = 134

Optimal product mix is:

Product X = 100 / wk

Product Y = 134 / wk

.

3)

Profit generated by the optimal product mix = 100*(3000-500-500)+134*(2000-500-100)-15000

= $ 372,600

.

4)

Utilization of each resource = Load / Capacity

Utilization of Assembly station = (100*10+134*5)/2400 = 69.6 %

Utilization of Machine 1 = (100*7+134*8+2*240)/2400 = 93.8 %

Utilization of Machine 2 = (100*5+134*(5+3)+2*30)/2400 = 68.0 %

Utilization of Machine 3 = (100*22+134*0+90)/2400 = 95.4 %

Utilization of Machine 4 = (100*10+134*10+60)/2400 = 100 %

Add a comment
Know the answer?
Add Answer to:
Problem 12 TOC PROBLEM GENERAL INFORMATION PRODUCT X S.P. = $3000 D= 100/WK PRODUCT Y S.P....
Your Answer:

Post as a guest

Your Name:

What's your source?

Earn Coins

Coins can be redeemed for fabulous gifts.

Not the answer you're looking for? Ask your own homework help question. Our experts will answer your question WITHIN MINUTES for Free.
Similar Homework Help Questions
  • G J Problem 12 - TOC PROBLEM GENERAL INFORMATION PRODUCT X S.P. -$3000 D = 100/WK...

    G J Problem 12 - TOC PROBLEM GENERAL INFORMATION PRODUCT X S.P. -$3000 D = 100/WK Machine 1 => 1 Set-Up 240 minutes PRODUCT Y S.P. - $2000 D - 200/WK Machine 2 => 1 Set-Up 30 minutes ASSEMBLY 10 minutes/unit ASSEMBLY 5 minutes/unit Machine 3 ==> 1 Set-up 90 minutes MACHINE 3 22 minutes/unit MACHINE 4 10 minutes/unit MACHINE 2 3 minutes/unit Machine 4 => 1 Set-up 60 minutes MACHINE 1 7 minutes/unit MACHINE 2 5 minutes/unit MACHINE 1...

  • Suppose that 5 components (one unit per product unit) are used in the production of 10...

    Suppose that 5 components (one unit per product unit) are used in the production of 10 products according to the following schedule. The unit assembly cost of each product is a function of the component used: $9, $4, $6, $5, and $8 for components 1 through 5, respectively. The maximum demand for any of the products is 300 units. Use AMPL to determine the optimal product mix that minimizes the installation cost. Do not use the longhand format. Submit your...

  • Determining the optimal Product Mix with One Constrained Resource Comfy Fit Company manufactures two types of...

    Determining the optimal Product Mix with One Constrained Resource Comfy Fit Company manufactures two types of university sweatshirts, the Swoop and the Rufus, with unit contribution margins of $4 and $15, respectively. Regardless of type, each sweatshirt must be fed through a stitching machine to affix the appropriate university logo. The firm leases seven machines that each provides 1,000 hours of machine time per year. Each Swoop sweatshirt requires 6 minutes of machine time, and each Rufus sweatshirt requires 30...

  • -12 Points) DETAILS ASK YOUR TEACHER A company manufactures x units of Product A and y...

    -12 Points) DETAILS ASK YOUR TEACHER A company manufactures x units of Product A and y units of Product B, on two machines, I and II. It has been determined that the company will realize a profit of $3/unit of Product A and a profit of $5/unit of Product B. To manufacture a unit of Product A requires 6 min on Machine I and 5 min on Machine II. To manufacture a unit of Product B requires 9 min on...

  • *2. In Example 4.3-2, suppose that TOYCO is studying the possibility of introducing a fourth toy:...

    *2. In Example 4.3-2, suppose that TOYCO is studying the possibility of introducing a fourth toy: fire trucks. The assembly does not make use of operation 1. Its unit assembly times on operations 2 and 3 are 1 and 3 minutes, respectively. The revenue per unit is $4. Would you advise TOYCO to introduce the new product? Example 4.3-2 TOYCO assembles three types of toys: trains, trucks, and cars, using three operations. Available assembly times for the three operations are...

  • A "product mix" problem can be solved quite easily by hand, as long as there is...

    A "product mix" problem can be solved quite easily by hand, as long as there is only one constraint (i.e. one resource in which demand > capacity). However, when there are multiple constraints it becomes quite complex. In the lab, we used Solver to find the product mix that results in the highest profit, subject to capacity constraints for each resource, and the constraint that we would not make more than the demand for any given product. Set up a...

  • Model GG $140 12 Model TS Selling price $100 Direct materials Direct labor ($12 per hour)...

    Model GG $140 12 Model TS Selling price $100 Direct materials Direct labor ($12 per hour) 24 Variable support costs (S4 per machine-hour 8 Fixed support costs 20 Variable support costs are machine time at $4 per machine hour. Model AY $120 12 24 16 T 20 | T 48 1 6 20 Required: 1) Which model has the greatest contribution margin per unit? 2) Which model has the greatest contribution margin per machine-hour? 3) If the product mix is...

  • Question 4 - What is the best solution? Asmall farm makes the similar animal fodies Product...

    Question 4 - What is the best solution? Asmall farm makes the similar animal fodies Product Are Sho whour. O material 4 minutes of mixing using a mix-machine product requires 6 hours of w a l e s of mixing and productores 4 hours of labour, Skg of raw matal i king The firm has 210 hours available during the next period for labour. 200 kg of w e aland 170 forming Product contributes $28.00 per unit to profit, product...

  • 5. What was the ratio of actual processing time for the product to total lead time?...

    5. What was the ratio of actual processing time for the product to total lead time? 1075 International Journal of Prodiction Resecarch Project Management 90,60 30 days forecast End Customers Hyerson Steel Weekly Schedule Dally Shipping Schedule Welding Finishing Assembly Wiring Fabrication 23 days CIT-140.5mn PIT-250 min C/T 126min days CT-128min PIT-480 min CIT 120 Ave CIT 120 CIO 15 days 3 days 3 days 3 days 1 days L. T. 25 days 480 min 2400 min IP.T. 3158.5 min...

  • Note that in this part you are only asked to model the problem. Do NOT try...

    Note that in this part you are only asked to model the problem. Do NOT try to solve and find the optimal solution. In models if there are two many parameters or decisions variables, like in M4, you may use parametric modeling structure, like E ci Xi <Di for every j where Di demand-j cij cost at i-j Then give an example for j=1 this constraint is 12 X1 + 8 X2 <200. Where c11=12, c12=8 and Di= 200 with...

ADVERTISEMENT
Free Homework Help App
Download From Google Play
Scan Your Homework
to Get Instant Free Answers
Need Online Homework Help?
Ask a Question
Get Answers For Free
Most questions answered within 3 hours.
ADVERTISEMENT
ADVERTISEMENT
ADVERTISEMENT