Question

The following Table gives monthly flows, precipitation, evaporation and demand rates for a critical 12- month period at a pro
0 0
Add a comment Improve this question Transcribed image text
Answer #1

for 1st month 2 As - (8.37 -0.75-0.120+ (O.13 -0.05)X 4000 X HOVO X 106 20602de 6 + GROMO z (2652 2 2084X106 m3 +0.32) x 100

For 5th month Assz (0.57 -2.4-0.1) X106 + (0.013-0453) X4X106 =(1.95-0.56 ) x106 2 -2.51 Room² for 6th Month AS - (0.25 -2.63

for 10th Month AS 3 (4.00 -0.91 -0.1) 8106 f (0.08 -0.128) x4 x106 220798x10 m² for uth month AS,= (4.20 -0.82-0-1) x 106 + C

Add a comment
Know the answer?
Add Answer to:
The following Table gives monthly flows, precipitation, evaporation and demand rates for a critical 12- month...
Your Answer:

Post as a guest

Your Name:

What's your source?

Earn Coins

Coins can be redeemed for fabulous gifts.

Not the answer you're looking for? Ask your own homework help question. Our experts will answer your question WITHIN MINUTES for Free.
Similar Homework Help Questions
  • Question 3 The following Table gives monthly flows, precipitation, evaporation and demand rates for a critical...

    Question 3 The following Table gives monthly flows, precipitation, evaporation and demand rates for a critical 12- month period at a proposed reservoir site. Existing water rights require a monthly release of 10000 m. The average reservoir area is 4 km². Compute the required reservoir capacity. Mo Monthly Monthly Monthly Pptn Evapn Demand (mm) 50 1 2 3 Natural mean flow (106m) 3.37 3.03 3.71 1.47 0.57 0.25 0.60 1.25 3.75 4.00 4.20 4.30 (mm) 130 53 45 30 13...

  • Question 3 The following Table gives monthly flows, precipitation, evaporation and demand rates for a critical...

    Question 3 The following Table gives monthly flows, precipitation, evaporation and demand rates for a critical 12- month period at a proposed reservoir site. Existing water rights require a monthly release of 10000 m'. The average reservoir area is 4 km2. Compute the required reservoir capacity. Mo Natural Monthly Monthly Monthly Water mean Pptn Evapn Demand Rights flow Release (10 m) (mm) (mm) (10ʻm') (10 m) 1 3.37 130 50 0.75 0.1 2 3.03 53 83 1.05 0.1 3 3.71...

  • 1. Two manufacturing processes are being compared to try to reduce the number of defective products...

    1. Two manufacturing processes are being compared to try to reduce the number of defective products made. During 8 shifts for each process, the following results were observed: Line A Line B n 181 | 187 Based on a 5% significance level, did line B have a larger average than line A? *Use the tables I gave you in the handouts for the critical values *Use the appropriate test statistic value, NOT the p-value method *Use and show the 5...

ADVERTISEMENT
Free Homework Help App
Download From Google Play
Scan Your Homework
to Get Instant Free Answers
Need Online Homework Help?
Ask a Question
Get Answers For Free
Most questions answered within 3 hours.
ADVERTISEMENT
ADVERTISEMENT
ADVERTISEMENT