Question

How to find Standard Error

I am really struggling to figure out how to find the Standard Error. Attached is my homework question..


As concrete cures, it gains strength. The following data represent the 7-day and 28-day strength in pounds per square inch (psi) of a certain type of concrete. Complete parts (a) through (f) below.

7-Day Strength (psi), x


28-Day Strength (psi), y


(a) Treating the 7-day strength as the explanatory variable, x, use technology to determine the estimates of

and

.

1411.3

(Round to one decimal place as needed.)

1.0752

(Round to four decimal places as needed.)

(b) Compute the standard error of the estimate,

.

nothing

(Round to one decimal place as needed.)


0 0
Add a comment Improve this question Transcribed image text
Request Professional Answer

Request Answer!

We need at least 10 more requests to produce the answer.

0 / 10 have requested this problem solution

The more requests, the faster the answer.

Request! (Login Required)


All students who have requested the answer will be notified once they are available.
Know the answer?
Add Answer to:
How to find Standard Error
Your Answer:

Post as a guest

Your Name:

What's your source?

Earn Coins

Coins can be redeemed for fabulous gifts.

Similar Homework Help Questions
  • I need help with - What is the conclusion that can be​ drawn? - thank you! As concrete​ cures, it...

    I need help with - What is the conclusion that can be​ drawn? - thank you! As concrete​ cures, it gains strength. The following data represent the​ 7-day and​ 28-day strength in pounds per square inch​ (psi) of a certain type of concrete. 7-Day_Strength_(psi)_-_x   28-Day_Strength_(psi)_-_y 3390   5220 3340   4630 2300   4070 2480   4120 3380   5020 ​(a) Treating the​ 7-day strength as the explanatory​ variable, x, use technology to determine the estimates of β0 and β1. β0≈b0= 1981.5 ​(Round to one...

  • As concrete​ cures, it gains strength. The following data represent the​ 7-day and​ 28-day strength in pounds per square inch​ (psi) of a certain type of concrete. Complete parts​ (a) through​ (f) bel...

    As concrete​ cures, it gains strength. The following data represent the​ 7-day and​ 28-day strength in pounds per square inch​ (psi) of a certain type of concrete. Complete parts​ (a) through​ (f) below. ​7-Day Strength​ (psi), x 3340 3380 3330 2300 2480 ​28-Day Strength​ (psi), y 4630 5020 4850 4070 4120 ​(a) Treating the​ 7-day strength as the explanatory​ variable, x, use technology to determine the estimates of beta 0 and beta 1. beta 0almost equalsb 0equals nothing ​(Round to...

  • As concrete​ cures, it gains strength. The following data represent the​ 7-day and​ 28-day strength in...

    As concrete​ cures, it gains strength. The following data represent the​ 7-day and​ 28-day strength in pounds per square inch​ (psi) of a certain type of concrete. Complete parts​ (a) through​ (f) below. ​7-Day Strength​ (psi), x 3340 3380 3330 2300 2480 ​28-Day Strength​ (psi), y 4630 5020 4850 4070 4120 ​(a) Treating the​ 7-day strength as the explanatory​ variable, x, use technology to determine the estimates of beta 0 and beta 1. beta 0almost equalsb 0equals nothing ​(Round to...

  • As concrete cures, it gains strength. The following data represent the 7-day and 28-day strength in...

    As concrete cures, it gains strength. The following data represent the 7-day and 28-day strength in pounds per square inch (psi) of a certain type of concrete. Complete parts (a) through (f) below. 7-Day Strength (psi), x 2300 2480 2620 2890 3330 28-Day Strength (psi), y 4070 4120 4190 4620 4850 OD. Ho: Bo = 0 Hy: Bo > 0 Determine the P-value of this hypothesis test. P-value = .006 (Round to three decimal places as needed.) What is the...

  • As concrete cures, it gains strength. The following data represent the 7-day and 28-day strength ...

    As concrete cures, it gains strength. The following data represent the 7-day and 28-day strength in pounds per square inch (psi) ofa certain type of concrete. Complete parts (a) through (f) below. 7-Dy Strength (psi)x 33802620 3390 2300 3330 4070 4850 28-Day Strength (psi,y 4190 (a) Treating the 7-day strength as the explanatory variable, use technology to determine the estimates of Po and pl P 1753.9 (Round to one decimal place as needed.) P sb9707 (Round to four decimal places...

  • A researcher wants to determine a model to predict the 28-day strength of a concrete mixture....

    A researcher wants to determine a model to predict the 28-day strength of a concrete mixture. The following data represent the slump (a measure of concrete uniformity in inches) x1, 7-day strength (in pounds per square inch, or psi) x2, and the 28-day strength (in psi) y of a certain type of concrete. Slump measure of the uniformity of the concrete, with a higher slump indicating a less uniform mixture. Complete parts (a) through (j). 3.75 4.5 2.5 4 3...

  • Compute the range and sample standard deviation for the strength of the concrete​ (in psi). 3930​,...

    Compute the range and sample standard deviation for the strength of the concrete​ (in psi). 3930​, 4130​, 3400​, 3200​, 2960​, 3860​, 4130​, 4020 The range is 1170 psi S= psi​ (Round to one decimal place as​ needed.)

  • Compute the range and sample standard deviation for strength of the concrete (in psi). 3980, 4100,...

    Compute the range and sample standard deviation for strength of the concrete (in psi). 3980, 4100, 3500, 3200, 2950, 3850, 4100, 4020 The range is 1150 psi. S= psi (Round to one decimal place as needed.)

  • B) (b) Use technology to compute the standard error, the point estimate for σ. se =...

    B) (b) Use technology to compute the standard error, the point estimate for σ. se = ??? (Round to four decimal places as needed.) (c) Assuming the residuals are normally distributed, use technology to determine sb . 1 sb1= ??? (Round to four decimal places as needed.) (d) Assuming the residuals are normally distributed, test H0: β1 = 0 versus H1: β1 ≠ 0 α = 0.05 level of significance. Use the P-value approach. Determine the P-value for this hypothesis...

  • A soap manufacturer tested a bar of soap to see how long it would last. A...

    A soap manufacturer tested a bar of soap to see how long it would last. A test subject showered with the soap each day for 15 days and recorded the Weight​ (in grams) of the soap after the shower. Part of the regression output is shown below. Answer parts a through e. Variable Coefficient ​SE(Coeff) ​t-ratio ​P-value Dependent variable​ is: Weight ​R-squared=94.0​% s=7.1 Intercept 126.392 3.39 37.24 ≤0.0001 Day −5.68865 0.386 −14.74 ≤0.0001 ​a) The standard deviation of the residuals...

ADVERTISEMENT
Free Homework Help App
Download From Google Play
Scan Your Homework
to Get Instant Free Answers
Need Online Homework Help?
Ask a Question
Get Answers For Free
Most questions answered within 3 hours.
ADVERTISEMENT
ADVERTISEMENT
ADVERTISEMENT