Question

Keller Company makes two models of battery-operated boats, the Sandy Beach and the Rocky River. Basic...

Keller Company makes two models of battery-operated boats, the Sandy Beach and the Rocky River. Basic production information follows:

Sandy Beach Rocky River
Direct materials cost per unit $ 20.00 $ 27.70
Direct labor cost per unit 14.90 17.40
Sales price per unit 83.10 105.00
Expected production per month 1,200 units 980 units

      

Keller has monthly overhead of $11,245, which is divided into the following cost pools:

Setup costs $ 1,920
Quality control 6,077
Maintenance 3,248
Total $ 11,245

The company has also compiled the following information about the chosen cost drivers:

Sandy Beach Rocky River Total
Number of setups 15 15 30
Number of inspections 110 405 515
Number of machine hours 1,450 1,450 2,900

Required:
1.
Suppose Keller uses a traditional costing system with machine hours as the cost driver. Determine the amount of overhead assigned to each product line. (Do not round intermediate calculations and round your final answers to the nearest whole dollar amount.)




2. Calculate the production cost per unit for each of Keller’s products under a traditional costing system. (Round your intermediate calculations and final answers to 2 decimal places.)



3. Calculate Keller’s gross margin per unit for each product under the traditional costing system. (Round your intermediate calculations and final answers to 2 decimal places.)



4. Select the appropriate cost driver for each cost pool and calculate the activity rates if Keller wanted to implement an ABC system.(Round your answers to 2 decimal places.)

0 0
Add a comment Improve this question Transcribed image text
Answer #1
Please give positive ratings so I can keep answering. It would help me a lot. Please comment if you have any query. Thanks!
Hickory
Workings for Answer 1
Calculation of Plant wide OH Rate Amount $
Manufacturing overhead         11,245.00 A
Machine Hours            2,900.00 B
Plant wide OH Rate                   3.88 C=A/B
Answer 1 Sandy Rocky Note
Machine Hours            1,450.00       1,450.00 D
Predetermined OH Rate                   3.88               3.88 See C
Overhead assigned           5,623.00       5,622.00 E=C*D
Workings for Answer 2 Sandy Rocky
Overhead assigned            5,623.00       5,622.00 See E
Expected production per month            1,200.00           980.00 F
Overhead assigned per unit                   4.69               5.74 G=E/F
Answer 2 Sandy Rocky
Direct Materials                 20.00             27.70
Direct Labor                 14.90             17.40
Overhead assigned per unit                   4.69               5.74 See G
Production cost per unit                 39.59             50.84
Answer 3 Sandy Rocky
Sell price per unit                 83.10           105.00
Production cost per unit                 39.59             50.84
Gross margin per unit                 43.51             54.16
Answer 4
Calculation of ABC rates for overhead H I J=H/I
Activity cost pool Cost Cost Driver Activity usage ABC rates
Setup costs            1,920.00 Number of setups                 30.00             64.00
Quality control            6,077.00 Number of inspections               515.00             11.80
Maintenance            3,248.00 Number of Machine-hours               2,900.00                1.12
        11,245.00
Add a comment
Know the answer?
Add Answer to:
Keller Company makes two models of battery-operated boats, the Sandy Beach and the Rocky River. Basic...
Your Answer:

Post as a guest

Your Name:

What's your source?

Earn Coins

Coins can be redeemed for fabulous gifts.

Not the answer you're looking for? Ask your own homework help question. Our experts will answer your question WITHIN MINUTES for Free.
Similar Homework Help Questions
  • Keller Company makes two models of battery-operated boats, the Sandy Beach and the Rocky River. Basic...

    Keller Company makes two models of battery-operated boats, the Sandy Beach and the Rocky River. Basic production information follows: Sandy Beach Rocky River Direct materials cost per unit $ 19.60 $ 27.30 Direct labor cost per unit 13.20 17.20 Sales price per unit 82.10 105.00 Expected production per month 1,250 units 950 units        Keller has monthly overhead of $12,203, which is divided into the following cost pools: Setup costs $ 3,100 Quality control 5,487 Maintenance 3,616 Total $ 12,203...

  • Keller Company makes two models of battery-operated boats, the Sandy Beach and the Rocky River. Basic...

    Keller Company makes two models of battery-operated boats, the Sandy Beach and the Rocky River. Basic production information follows: Sandy Beach Rocky River Direct materials cost per unit $ 19.30 $ 26.60 Direct labor cost per unit 14.80 19.10 Sales price per unit 83.40 105.00 Expected production per month 1,200 units 910 units        Keller has monthly overhead of $11,104, which is divided into the following cost pools: Setup costs $ 2,400 Quality control 5,766 Maintenance 2,938 Total $ 11,104...

  • Keller Company makes two models of battery-operated boats, the Sandy Beach and the Rocky River. Basic...

    Keller Company makes two models of battery-operated boats, the Sandy Beach and the Rocky River. Basic production information follows: Rocky River $ 27.10 Sandy Beach Direct materials cost per unit $19.30 Direct labor cost per unit 13.30 Sales price per unit 83.90 Expected production per month 1, 240 units 18.60 105.00 9 10 units Keller has monthly overhead of $11,466, which is divided into the following cost pools: Setup costs Quality control Maintenance Total $ 1,920 6,212 3, 335 $...

  • Keller Company makes two models of battery operated boats, the Sandy Beach and the Rocky River....

    Keller Company makes two models of battery operated boats, the Sandy Beach and the Rocky River. Basic production information follows: Direct materials cost per unit Direct labor cost per unit Sales price per unit Expected production per month Sandy Beach $19.10 15.10 83.70 1,240 units Rocky River $ 27.20 18.40 105.00 920 units Keller has monthly overhead of $11,756, which is divided into the following cost pools: Setup costs Quality control Maintenance Total $ 3,050 5,400 3,306 $ 11,756 The...

  • Keller Company makes two models of battery-operated boats, the Sandy Beach and the Rocky River. Basic...

    Keller Company makes two models of battery-operated boats, the Sandy Beach and the Rocky River. Basic production information follows: Direct materials cost per unit Direct labor cost per unit Sales price per unit Expected production per month Sandy Beach $18.70 15.10 82.70 1,150 units Rocky River $ 28.10 18.90 106.00 960 units Keller has monthly overhead of $10,844, which is divided into the following cost pools: Setup costs Quality control Maintenance Total $ 2,600 5,220 3,024 $ 10,844 The company...

  • Keller Company makes two models of battery-operated boats, the Sandy Beach and the Rocky River. Basic...

    Keller Company makes two models of battery-operated boats, the Sandy Beach and the Rocky River. Basic production information follows: Sandy Beach $19.00 Rocky River $ 27.40 17.30 106.e0 Direct materials cost per unit Direct labor cost per unit Sales price per unit Expected production per month 14.60 82.30 1,210 units 910 units Keller has monthly overhead of S11,716, which is divided into the following cost pools: $ 2,135 5,626 3,955 $ 11,716 Setup costs Quality control Maintenance Total The company...

  • Keller Company makes two models of battery-operated boats, the Sandy Beach and the Rocky River. Basic...

    Keller Company makes two models of battery-operated boats, the Sandy Beach and the Rocky River. Basic production information follows: Direct materials cost per unit Direct labor cost per unit Sales price per unit Expected production per month Sandy Beach $19.00 14.60 82.30 1.210 units Rocky River $ 27.40 17.30 106.00 910 units Keller has monthly overhead of $11.716, which is divided into the following cost pools: $ 2,135 Setup costs Quality control Maintenance Total 3,955 $ 11,716 The company has...

  • Keller Company makes two models of battery-operated boats, the Sandy Beach and the Rocky River. Basic...

    Keller Company makes two models of battery-operated boats, the Sandy Beach and the Rocky River. Basic production information follows: Sandy Beach Rocky River Direct materials cost per unit $ 19.30 $ 26.60 Direct labor cost per unit 14.80 19.10 Sales price per unit 83.40 105.00 Expected production per month 1,200 units 910 units        Keller has monthly overhead of $11,104, which is divided into the following cost pools: Setup costs $ 2,400 Quality control 5,766 Maintenance 2,938 Total $ 11,104...

  • Pre-Built Problems Keller Company makes two models of battery operated boats, the Sandy Beach and the...

    Pre-Built Problems Keller Company makes two models of battery operated boats, the Sandy Beach and the Rocky River Basic production information follows: Sandy Beach $19.60 HI 14.00 Rocky Riven 27.20 16. Direct materials cost per unit Direct labor cost per unit Sales price per unit Expected production per month 920 units Keller has monthly overhead of 511,632, which is divided into the following cost pools Quality control Maintenance Total The company has also compiled the following information about the chosen...

  • Check my work Keller Company makes two models of battery-operated boats, the Sandy Beach and the...

    Check my work Keller Company makes two models of battery-operated boats, the Sandy Beach and the Rocky River. Basic production information follows: Sandy Beach Direct materials cost per unit $18.60 Direct labor cost per unit 14.80 Sales price per unit 83.40 Expected production per month 1,230 units Rocky River $ 26.40 18.30 105.00 930 units Keller has monthly overhead of $13,493, which is divided into the following cost pools: Setup costs Quality control Maintenance Total $ 3, 250 6, 283...

ADVERTISEMENT
Free Homework Help App
Download From Google Play
Scan Your Homework
to Get Instant Free Answers
Need Online Homework Help?
Ask a Question
Get Answers For Free
Most questions answered within 3 hours.
ADVERTISEMENT
ADVERTISEMENT
ADVERTISEMENT