Keller Company makes two models of battery-operated boats, the
Sandy Beach and the Rocky River. Basic production information
follows:
Sandy Beach | Rocky River | |||||
Direct materials cost per unit | $ | 20.00 | $ | 27.70 | ||
Direct labor cost per unit | 14.90 | 17.40 | ||||
Sales price per unit | 83.10 | 105.00 | ||||
Expected production per month | 1,200 | units | 980 | units | ||
Keller has monthly overhead of $11,245, which is divided into the following cost pools:
Setup costs | $ | 1,920 |
Quality control | 6,077 | |
Maintenance | 3,248 | |
Total | $ | 11,245 |
The company has also compiled the following information about the chosen cost drivers:
Sandy Beach | Rocky River | Total | |
Number of setups | 15 | 15 | 30 |
Number of inspections | 110 | 405 | 515 |
Number of machine hours | 1,450 | 1,450 | 2,900 |
Required:
1. Suppose Keller uses a traditional costing system with
machine hours as the cost driver. Determine the amount of overhead
assigned to each product line. (Do not
round intermediate calculations and round your final answers to the
nearest whole dollar amount.)
2. Calculate the production cost per unit for each
of Keller’s products under a traditional costing system.
(Round your intermediate calculations and final answers to
2 decimal places.)
3. Calculate Keller’s gross margin per unit for
each product under the traditional costing system. (Round
your intermediate calculations and final answers to 2 decimal
places.)
4. Select the appropriate cost driver for each
cost pool and calculate the activity rates if Keller wanted to
implement an ABC system.(Round your answers to 2 decimal
places.)
Please give positive ratings so I can keep answering. It would help me a lot. Please comment if you have any query. Thanks! |
Hickory | |||
Workings for Answer 1 | |||
Calculation of Plant wide OH Rate | Amount $ | ||
Manufacturing overhead | 11,245.00 | A | |
Machine Hours | 2,900.00 | B | |
Plant wide OH Rate | 3.88 | C=A/B | |
Answer 1 | Sandy | Rocky | Note |
Machine Hours | 1,450.00 | 1,450.00 | D |
Predetermined OH Rate | 3.88 | 3.88 | See C |
Overhead assigned | 5,623.00 | 5,622.00 | E=C*D |
Workings for Answer 2 | Sandy | Rocky | |
Overhead assigned | 5,623.00 | 5,622.00 | See E |
Expected production per month | 1,200.00 | 980.00 | F |
Overhead assigned per unit | 4.69 | 5.74 | G=E/F |
Answer 2 | Sandy | Rocky | |
Direct Materials | 20.00 | 27.70 | |
Direct Labor | 14.90 | 17.40 | |
Overhead assigned per unit | 4.69 | 5.74 | See G |
Production cost per unit | 39.59 | 50.84 | |
Answer 3 | Sandy | Rocky | |
Sell price per unit | 83.10 | 105.00 | |
Production cost per unit | 39.59 | 50.84 | |
Gross margin per unit | 43.51 | 54.16 |
Answer 4 | ||||
Calculation of ABC rates for overhead | H | I | J=H/I | |
Activity cost pool | Cost | Cost Driver | Activity usage | ABC rates |
Setup costs | 1,920.00 | Number of setups | 30.00 | 64.00 |
Quality control | 6,077.00 | Number of inspections | 515.00 | 11.80 |
Maintenance | 3,248.00 | Number of Machine-hours | 2,900.00 | 1.12 |
11,245.00 |
Keller Company makes two models of battery-operated boats, the Sandy Beach and the Rocky River. Basic...
Keller Company makes two models of battery-operated boats, the Sandy Beach and the Rocky River. Basic production information follows: Sandy Beach Rocky River Direct materials cost per unit $ 19.60 $ 27.30 Direct labor cost per unit 13.20 17.20 Sales price per unit 82.10 105.00 Expected production per month 1,250 units 950 units Keller has monthly overhead of $12,203, which is divided into the following cost pools: Setup costs $ 3,100 Quality control 5,487 Maintenance 3,616 Total $ 12,203...
Keller Company makes two models of battery-operated boats, the Sandy Beach and the Rocky River. Basic production information follows: Sandy Beach Rocky River Direct materials cost per unit $ 19.30 $ 26.60 Direct labor cost per unit 14.80 19.10 Sales price per unit 83.40 105.00 Expected production per month 1,200 units 910 units Keller has monthly overhead of $11,104, which is divided into the following cost pools: Setup costs $ 2,400 Quality control 5,766 Maintenance 2,938 Total $ 11,104...
Keller Company makes two models of battery-operated boats, the Sandy Beach and the Rocky River. Basic production information follows: Rocky River $ 27.10 Sandy Beach Direct materials cost per unit $19.30 Direct labor cost per unit 13.30 Sales price per unit 83.90 Expected production per month 1, 240 units 18.60 105.00 9 10 units Keller has monthly overhead of $11,466, which is divided into the following cost pools: Setup costs Quality control Maintenance Total $ 1,920 6,212 3, 335 $...
Keller Company makes two models of battery operated boats, the Sandy Beach and the Rocky River. Basic production information follows: Direct materials cost per unit Direct labor cost per unit Sales price per unit Expected production per month Sandy Beach $19.10 15.10 83.70 1,240 units Rocky River $ 27.20 18.40 105.00 920 units Keller has monthly overhead of $11,756, which is divided into the following cost pools: Setup costs Quality control Maintenance Total $ 3,050 5,400 3,306 $ 11,756 The...
Keller Company makes two models of battery-operated boats, the Sandy Beach and the Rocky River. Basic production information follows: Direct materials cost per unit Direct labor cost per unit Sales price per unit Expected production per month Sandy Beach $18.70 15.10 82.70 1,150 units Rocky River $ 28.10 18.90 106.00 960 units Keller has monthly overhead of $10,844, which is divided into the following cost pools: Setup costs Quality control Maintenance Total $ 2,600 5,220 3,024 $ 10,844 The company...
Keller Company makes two models of battery-operated boats, the Sandy Beach and the Rocky River. Basic production information follows: Sandy Beach $19.00 Rocky River $ 27.40 17.30 106.e0 Direct materials cost per unit Direct labor cost per unit Sales price per unit Expected production per month 14.60 82.30 1,210 units 910 units Keller has monthly overhead of S11,716, which is divided into the following cost pools: $ 2,135 5,626 3,955 $ 11,716 Setup costs Quality control Maintenance Total The company...
Keller Company makes two models of battery-operated boats, the Sandy Beach and the Rocky River. Basic production information follows: Direct materials cost per unit Direct labor cost per unit Sales price per unit Expected production per month Sandy Beach $19.00 14.60 82.30 1.210 units Rocky River $ 27.40 17.30 106.00 910 units Keller has monthly overhead of $11.716, which is divided into the following cost pools: $ 2,135 Setup costs Quality control Maintenance Total 3,955 $ 11,716 The company has...
Keller Company makes two models of battery-operated boats, the Sandy Beach and the Rocky River. Basic production information follows: Sandy Beach Rocky River Direct materials cost per unit $ 19.30 $ 26.60 Direct labor cost per unit 14.80 19.10 Sales price per unit 83.40 105.00 Expected production per month 1,200 units 910 units Keller has monthly overhead of $11,104, which is divided into the following cost pools: Setup costs $ 2,400 Quality control 5,766 Maintenance 2,938 Total $ 11,104...
Pre-Built Problems Keller Company makes two models of battery operated boats, the Sandy Beach and the Rocky River Basic production information follows: Sandy Beach $19.60 HI 14.00 Rocky Riven 27.20 16. Direct materials cost per unit Direct labor cost per unit Sales price per unit Expected production per month 920 units Keller has monthly overhead of 511,632, which is divided into the following cost pools Quality control Maintenance Total The company has also compiled the following information about the chosen...
Check my work Keller Company makes two models of battery-operated boats, the Sandy Beach and the Rocky River. Basic production information follows: Sandy Beach Direct materials cost per unit $18.60 Direct labor cost per unit 14.80 Sales price per unit 83.40 Expected production per month 1,230 units Rocky River $ 26.40 18.30 105.00 930 units Keller has monthly overhead of $13,493, which is divided into the following cost pools: Setup costs Quality control Maintenance Total $ 3, 250 6, 283...