Question

Keller Company makes two models of battery-operated boats, the Sandy Beach and the Rocky River. Basic...

Keller Company makes two models of battery-operated boats, the Sandy Beach and the Rocky River. Basic production information follows:

Sandy Beach Rocky River
Direct materials cost per unit $ 19.60 $ 27.30
Direct labor cost per unit 13.20 17.20
Sales price per unit 82.10 105.00
Expected production per month 1,250 units 950 units

      

Keller has monthly overhead of $12,203, which is divided into the following cost pools:

Setup costs $ 3,100
Quality control 5,487
Maintenance 3,616
Total $ 12,203

The company has also compiled the following information about the chosen cost drivers:

Sandy Beach Rocky River Total
Number of setups 12 38 50
Number of inspections 170 295 465
Number of machine hours 1,600 1,600 3,200

Required:
1.
Suppose Keller uses a traditional costing system with machine hours as the cost driver. Determine the amount of overhead assigned to each product line. (Do not round intermediate calculations and round your final answers to the nearest whole dollar amount.)

Overhead Assigned
Sandy Beach Model
Rocky River Model
Total Overhead Cost



2. Calculate the production cost per unit for each of Keller’s products under a traditional costing system. (Round your intermediate calculations and final answers to 2 decimal places.)

Sandy Beach Rocky River
Unit Cost



3. Calculate Keller’s gross margin per unit for each product under the traditional costing system. (Round your intermediate calculations and final answers to 2 decimal places.)

Sandy Beach Rocky River
Gross Margin



4. Select the appropriate cost driver for each cost pool and calculate the activity rates if Keller wanted to implement an ABC system. (Round your answers to 2 decimal places.)

Setup Costs
Quality Control
Maintenance



5. Assuming an ABC system, assign overhead costs to each product based on activity demands.(Round your intermediate calculations to 2 decimal places and final answers to the nearest whole dollar amount.)

Overhead Assigned To Sandy Beach Overhead Assigned To Rocky River
Setup Cost
Quality Control
Maintenance
Total Overhead Cost



6. Calculate the production cost per unit for each of Keller’s products with an ABC system. (Round your intermediate calculations and final answers to 2 decimal places.)

Sandy Beach Rocky River
Unit Cost



7. Calculate Keller’s gross margin per unit for each product under an ABC system. (Round your intermediate calculations and final answers to 2 decimal places.)

Sandy Beach Rocky River
Gross Margin



8. Compare the gross margin per unit of each product under the traditional system and ABC. (Round your answers to 2 decimal places.)

Sandy Beach Rocky River
Gross Margin (Traditional)
Gross Margin (ABC)
0 0
Add a comment Improve this question Transcribed image text
Answer #1

I Problem 1. solution Machine hour Rate - Total overhead Total machine hours $ 12,203 3200 hrs = $ 3.8134375 turi & s Disha dProblem-2. solution / Calculation of Boduction Cost Per unit for each Product line Rocky particular I Beach River ProductionProblem - 3 solution Calculation of Gross Margin for lach Product under traditional esting system particulars Sandy Beach RocProblem - 4 Solution | Cest Pool set-up lost Appropriate Cost osiver No. of set-up Onality Control No. of Inspection maintenaActivity Pates for each Cost poole set-up lost c$3100 1 = $62/ No. of set up $ 50 ouality Control = $11.8 No. of $ 5487 InspeBoblem - 5 Cost Pool solution) overhead Assignd to Sandy Beach overhead assigned to Rocky River Set-up Cest $744 (12X $62) $ooblem-6 solution Production for each Cost Bodhet o Calculation of per unit | Sandy -Beach Rocky farticular River productionProblem-7 solution) Calculation of A under Gross ABC margin system Rocky River particular Sandy Beach Sales revenue $ 102,625

Add a comment
Know the answer?
Add Answer to:
Keller Company makes two models of battery-operated boats, the Sandy Beach and the Rocky River. Basic...
Your Answer:

Post as a guest

Your Name:

What's your source?

Earn Coins

Coins can be redeemed for fabulous gifts.

Not the answer you're looking for? Ask your own homework help question. Our experts will answer your question WITHIN MINUTES for Free.
Similar Homework Help Questions
  • Keller Company makes two models of battery-operated boats, the Sandy Beach and the Rocky River. Basic...

    Keller Company makes two models of battery-operated boats, the Sandy Beach and the Rocky River. Basic production information follows: Sandy Beach Rocky River Direct materials cost per unit $ 19.30 $ 26.60 Direct labor cost per unit 14.80 19.10 Sales price per unit 83.40 105.00 Expected production per month 1,200 units 910 units        Keller has monthly overhead of $11,104, which is divided into the following cost pools: Setup costs $ 2,400 Quality control 5,766 Maintenance 2,938 Total $ 11,104...

  • Keller Company makes two models of battery-operated boats, the Sandy Beach and the Rocky River. Basic...

    Keller Company makes two models of battery-operated boats, the Sandy Beach and the Rocky River. Basic production information follows: Sandy Beach $19.00 Rocky River $ 27.40 17.30 106.e0 Direct materials cost per unit Direct labor cost per unit Sales price per unit Expected production per month 14.60 82.30 1,210 units 910 units Keller has monthly overhead of S11,716, which is divided into the following cost pools: $ 2,135 5,626 3,955 $ 11,716 Setup costs Quality control Maintenance Total The company...

  • Keller Company makes two models of battery-operated boats, the Sandy Beach and the Rocky River. Basic...

    Keller Company makes two models of battery-operated boats, the Sandy Beach and the Rocky River. Basic production information follows: Rocky River $ 27.10 Sandy Beach Direct materials cost per unit $19.30 Direct labor cost per unit 13.30 Sales price per unit 83.90 Expected production per month 1, 240 units 18.60 105.00 9 10 units Keller has monthly overhead of $11,466, which is divided into the following cost pools: Setup costs Quality control Maintenance Total $ 1,920 6,212 3, 335 $...

  • Keller Company makes two models of battery-operated boats, the Sandy Beach and the Rocky River. Basic...

    Keller Company makes two models of battery-operated boats, the Sandy Beach and the Rocky River. Basic production information follows: Direct materials cost per unit Direct labor cost per unit Sales price per unit Expected production per month Sandy Beach $18.70 15.10 82.70 1,150 units Rocky River $ 28.10 18.90 106.00 960 units Keller has monthly overhead of $10,844, which is divided into the following cost pools: Setup costs Quality control Maintenance Total $ 2,600 5,220 3,024 $ 10,844 The company...

  • Keller Company makes two models of battery operated boats, the Sandy Beach and the Rocky River....

    Keller Company makes two models of battery operated boats, the Sandy Beach and the Rocky River. Basic production information follows: Direct materials cost per unit Direct labor cost per unit Sales price per unit Expected production per month Sandy Beach $19.10 15.10 83.70 1,240 units Rocky River $ 27.20 18.40 105.00 920 units Keller has monthly overhead of $11,756, which is divided into the following cost pools: Setup costs Quality control Maintenance Total $ 3,050 5,400 3,306 $ 11,756 The...

  • Keller Company makes two models of battery-operated boats, the Sandy Beach and the Rocky River. Basic...

    Keller Company makes two models of battery-operated boats, the Sandy Beach and the Rocky River. Basic production information follows: Sandy Beach Rocky River Direct materials cost per unit $ 20.00 $ 27.70 Direct labor cost per unit 14.90 17.40 Sales price per unit 83.10 105.00 Expected production per month 1,200 units 980 units        Keller has monthly overhead of $11,245, which is divided into the following cost pools: Setup costs $ 1,920 Quality control 6,077 Maintenance 3,248 Total $ 11,245...

  • Pre-Built Problems Keller Company makes two models of battery operated boats, the Sandy Beach and the...

    Pre-Built Problems Keller Company makes two models of battery operated boats, the Sandy Beach and the Rocky River Basic production information follows: Sandy Beach $19.60 HI 14.00 Rocky Riven 27.20 16. Direct materials cost per unit Direct labor cost per unit Sales price per unit Expected production per month 920 units Keller has monthly overhead of 511,632, which is divided into the following cost pools Quality control Maintenance Total The company has also compiled the following information about the chosen...

  • Check my work Keller Company makes two models of battery-operated boats, the Sandy Beach and the...

    Check my work Keller Company makes two models of battery-operated boats, the Sandy Beach and the Rocky River. Basic production information follows: Sandy Beach Direct materials cost per unit $18.60 Direct labor cost per unit 14.80 Sales price per unit 83.40 Expected production per month 1,230 units Rocky River $ 26.40 18.30 105.00 930 units Keller has monthly overhead of $13,493, which is divided into the following cost pools: Setup costs Quality control Maintenance Total $ 3, 250 6, 283...

  • Keller Company makes two models of battery-operated boats, the Sandy Beach and the Rocky River. Basic...

    Keller Company makes two models of battery-operated boats, the Sandy Beach and the Rocky River. Basic production information follows: Direct materials cost per unit Direct labor cost per unit Sales price per unit Expected production per month Sandy Beach $19.00 14.60 82.30 1.210 units Rocky River $ 27.40 17.30 106.00 910 units Keller has monthly overhead of $11.716, which is divided into the following cost pools: $ 2,135 Setup costs Quality control Maintenance Total 3,955 $ 11,716 The company has...

  • Keller Company makes two models of battery-operated boats, the Sandy Beach and the Rocky River. Basic...

    Keller Company makes two models of battery-operated boats, the Sandy Beach and the Rocky River. Basic production information follows: Sandy Beach Rocky River Direct materials cost per unit $ 19.30 $ 26.60 Direct labor cost per unit 14.80 19.10 Sales price per unit 83.40 105.00 Expected production per month 1,200 units 910 units        Keller has monthly overhead of $11,104, which is divided into the following cost pools: Setup costs $ 2,400 Quality control 5,766 Maintenance 2,938 Total $ 11,104...

ADVERTISEMENT
Free Homework Help App
Download From Google Play
Scan Your Homework