Question

Pre-Built Problems Keller Company makes two models of battery operated boats, the Sandy Beach and the Rocky River Basic produ
2. Calculate the production cost per unit for each of Kellers products under a traditional costing system. (Round your inter
4 Pre-Built Problems 5. Assuming an ABC system, assign overhead costs to each product based on activity demands (Round your i
6. Calculate the production cost per unit for each of Kellers products with an ABC system. (Round your intermediate calculat
0 0
Add a comment Improve this question Transcribed image text
Answer #1

Solution:

Part 1: Amount of overheads assigned to eah product line
Sandy beach Rock River Total
Machine hours 1,650 1,650 3,300
Total overheads 11,632
Overheads assigned 11,632 x (1,650/3,300) = 5816 11,632 x (1,650/3,300) = 5816 11,632
5816
Part 2: Production cost per unit under traditional costing method
Sandy beach Rock River
Direct Materials 19.60 x 1,200 = 23520 27.20 x 920 = 25024
Direct labor 14.00 x 1200 = 16800 18.6 x 920 = 17112
Overheads 5,816 5,816
Total (A) 46,136 47,952
Units Produced (B) 1,200 920
Cost per unit (A/B) 38.45 52.12
Part 3: Calculatio of Gross margin per unit
Sandy Beach Rock River
Sales price per unit 82.8 106
Cost per unit 38.45 52.12
Gross margin per unit 44.35 53.88
Part 4: Allocation of cost driver & Calculation of activity rates under ABC Costing
Total cost (A) Cost Drivers Total (B) Rate (A/B)
Setups costs 2,030 Numbers of setups 35 58
Inspections 5,674 Number of inspections 485 11.70
Maintenance 3,927 Number of machine hours 3300 1.19
Add a comment
Know the answer?
Add Answer to:
Pre-Built Problems Keller Company makes two models of battery operated boats, the Sandy Beach and the...
Your Answer:

Post as a guest

Your Name:

What's your source?

Earn Coins

Coins can be redeemed for fabulous gifts.

Not the answer you're looking for? Ask your own homework help question. Our experts will answer your question WITHIN MINUTES for Free.
Similar Homework Help Questions
  • Keller Company makes two models of battery operated boats, the Sandy Beach and the Rocky River....

    Keller Company makes two models of battery operated boats, the Sandy Beach and the Rocky River. Basic production information follows: Direct materials cost per unit Direct labor cost per unit Sales price per unit Expected production per month Sandy Beach $19.10 15.10 83.70 1,240 units Rocky River $ 27.20 18.40 105.00 920 units Keller has monthly overhead of $11,756, which is divided into the following cost pools: Setup costs Quality control Maintenance Total $ 3,050 5,400 3,306 $ 11,756 The...

  • Keller Company makes two models of battery-operated boats, the Sandy Beach and the Rocky River. Basic...

    Keller Company makes two models of battery-operated boats, the Sandy Beach and the Rocky River. Basic production information follows: Sandy Beach $19.00 Rocky River $ 27.40 17.30 106.e0 Direct materials cost per unit Direct labor cost per unit Sales price per unit Expected production per month 14.60 82.30 1,210 units 910 units Keller has monthly overhead of S11,716, which is divided into the following cost pools: $ 2,135 5,626 3,955 $ 11,716 Setup costs Quality control Maintenance Total The company...

  • Keller Company makes two models of battery-operated boats, the Sandy Beach and the Rocky River. Basic...

    Keller Company makes two models of battery-operated boats, the Sandy Beach and the Rocky River. Basic production information follows: Rocky River $ 27.10 Sandy Beach Direct materials cost per unit $19.30 Direct labor cost per unit 13.30 Sales price per unit 83.90 Expected production per month 1, 240 units 18.60 105.00 9 10 units Keller has monthly overhead of $11,466, which is divided into the following cost pools: Setup costs Quality control Maintenance Total $ 1,920 6,212 3, 335 $...

  • Keller Company makes two models of battery-operated boats, the Sandy Beach and the Rocky River. Basic...

    Keller Company makes two models of battery-operated boats, the Sandy Beach and the Rocky River. Basic production information follows: Direct materials cost per unit Direct labor cost per unit Sales price per unit Expected production per month Sandy Beach $18.70 15.10 82.70 1,150 units Rocky River $ 28.10 18.90 106.00 960 units Keller has monthly overhead of $10,844, which is divided into the following cost pools: Setup costs Quality control Maintenance Total $ 2,600 5,220 3,024 $ 10,844 The company...

  • Keller Company makes two models of battery-operated boats, the Sandy Beach and the Rocky River. Basic...

    Keller Company makes two models of battery-operated boats, the Sandy Beach and the Rocky River. Basic production information follows: Sandy Beach Rocky River Direct materials cost per unit $ 19.60 $ 27.30 Direct labor cost per unit 13.20 17.20 Sales price per unit 82.10 105.00 Expected production per month 1,250 units 950 units        Keller has monthly overhead of $12,203, which is divided into the following cost pools: Setup costs $ 3,100 Quality control 5,487 Maintenance 3,616 Total $ 12,203...

  • Check my work Keller Company makes two models of battery-operated boats, the Sandy Beach and the...

    Check my work Keller Company makes two models of battery-operated boats, the Sandy Beach and the Rocky River. Basic production information follows: Sandy Beach Direct materials cost per unit $18.60 Direct labor cost per unit 14.80 Sales price per unit 83.40 Expected production per month 1,230 units Rocky River $ 26.40 18.30 105.00 930 units Keller has monthly overhead of $13,493, which is divided into the following cost pools: Setup costs Quality control Maintenance Total $ 3, 250 6, 283...

  • Keller Company makes two models of battery-operated boats, the Sandy Beach and the Rocky River. Basic...

    Keller Company makes two models of battery-operated boats, the Sandy Beach and the Rocky River. Basic production information follows: Sandy Beach Rocky River Direct materials cost per unit $ 19.30 $ 26.60 Direct labor cost per unit 14.80 19.10 Sales price per unit 83.40 105.00 Expected production per month 1,200 units 910 units        Keller has monthly overhead of $11,104, which is divided into the following cost pools: Setup costs $ 2,400 Quality control 5,766 Maintenance 2,938 Total $ 11,104...

  • Keller Company makes two models of battery-operated boats, the Sandy Beach and the Rocky River. Basic...

    Keller Company makes two models of battery-operated boats, the Sandy Beach and the Rocky River. Basic production information follows: Sandy Beach Rocky River Direct materials cost per unit $ 20.00 $ 27.70 Direct labor cost per unit 14.90 17.40 Sales price per unit 83.10 105.00 Expected production per month 1,200 units 980 units        Keller has monthly overhead of $11,245, which is divided into the following cost pools: Setup costs $ 1,920 Quality control 6,077 Maintenance 3,248 Total $ 11,245...

  • Keller Company makes two models of battery-operated boats, the Sandy Beach and the Rocky River. Basic...

    Keller Company makes two models of battery-operated boats, the Sandy Beach and the Rocky River. Basic production information follows: Direct materials cost per unit Direct labor cost per unit Sales price per unit Expected production per month Sandy Beach $19.00 14.60 82.30 1.210 units Rocky River $ 27.40 17.30 106.00 910 units Keller has monthly overhead of $11.716, which is divided into the following cost pools: $ 2,135 Setup costs Quality control Maintenance Total 3,955 $ 11,716 The company has...

  • PA4-4 (Algo) Selecting Cost Drivers, Assigning Costs Using Activity Rates [LO 4-1,4-3, 4-4, 4-6) Keller Company...

    PA4-4 (Algo) Selecting Cost Drivers, Assigning Costs Using Activity Rates [LO 4-1,4-3, 4-4, 4-6) Keller Company makes two models of battery-operated boats, the Sandy Beach and the Rocky River. Basic production information follows: Sandy Beach Rocky River Direct materials cost per $18.90 $ 27.00 unit Direct labor cost per unit 14.60 17.90 Sales price per unit 82.40 106.00 Expected production per month 1, 230 units 980 units Keller has monthly overhead of $12,306, which is divided into the following cost...

ADVERTISEMENT
Free Homework Help App
Download From Google Play
Scan Your Homework
to Get Instant Free Answers
Need Online Homework Help?
Ask a Question
Get Answers For Free
Most questions answered within 3 hours.
ADVERTISEMENT
ADVERTISEMENT
ADVERTISEMENT