26.10a For the data listed, tabulate cut, fill, and cumulative volumes in cubic yards between stations 10 +00 and 20 + 00. Use an expansion factor of 1.25 for fills. Prepare a Mass Haul Diagram. ( points) End Area (ft) Station Cut Fill 10 +000 0 11 001148 12 + 00 23410 13 +00 2545 1400 96 2 15 +000 0 16 +0015112 17 +00 3598 18 +0069198 19 + 0050145 2000 26148

0 0
Add a comment Improve this question Transcribed image text
Know the answer?
Add Answer to:
26.10a For the data listed, tabulate cut, fill, and cumulative volumes in cubic yards between stations...
Your Answer:

Post as a guest

Your Name:

What's your source?

Earn Coins

Coins can be redeemed for fabulous gifts.

Not the answer you're looking for? Ask your own homework help question. Our experts will answer your question WITHIN MINUTES for Free.
Similar Homework Help Questions
  • This is a transportation engineering problem. Help me solve number one. Thank you. ll tB the...

    This is a transportation engineering problem. Help me solve number one. Thank you. ll tB the Assignments section of the Syl Homework should be an individual effort though discussion is permissible abbus. 1. (5 points) For the data listed, tabulate cut, nill, and cumulative volumes in cubic yards between stations 10 + 00 and 20+ 00. Use an expanston factor of 1.25 for fills. Prepare a Mass Haul Dia with free haul equivalent to 500 feet and overhaul cost gram....

  • On the following Mass-haul diagram, what is the overall total cut or fill? Cumulative Volume (cubic...

    On the following Mass-haul diagram, what is the overall total cut or fill? Cumulative Volume (cubic yds) 500 1000 1500 2000 2500 3000 3500 4000 Station (ft)

  • Calculate the cubic yards of cut and fill for the following cross section. End areas are provided below. Assume shrinkage factor = 0.13. Is this a borrow (shortage in earth), waste(extra earth), or ba...

    Calculate the cubic yards of cut and fill for the following cross section. End areas are provided below. Assume shrinkage factor = 0.13. Is this a borrow (shortage in earth), waste(extra earth), or balanced (equal amounts of earth) project? Station           Cut(sf)                      Fill(sf) 102+00           150.                          150 103+00.          150.                          150 104+00(B)      175.                          175 104+00(A)      10.                             10 105+00(B)       11.                             11 105+00(A)       45.                             45 106+00.           50.                             50 106+75.           60.                             60 107+00.           70.                             70

  • Pulu tu d e8htractor to balance the cut and fill between stations 10+00 and 15+00. Problem #2: Th...

    pulu tu d e8htractor to balance the cut and fill between stations 10+00 and 15+00. Problem #2: The "T" intersection shown has Yellow Interval of 3 seconds. Lost time per phase is 5 seconds and saturation and peak hour flows are: Saturation Peak hour flow Lane Group a1 a2 b1 C1 C2 Phase Flow 1500 450 1850 | 450 350 392 A (SB) 575 B (NB) 32 Calculate the actual red times and the actual green times for each phase....

  • Part 1 Complete the following Earthwork Sheet Material: Earth and Gravel, Swell Factor: 83 Strip fill(cy...

    Part 1 Complete the following Earthwork Sheet Material: Earth and Gravel, Swell Factor: 83 Strip fill(cy Total till och Total cut beyl Adj fill (byl Sum (beyl Mass ordinate 1.23 056 2.37 1.20 2.36 3.07 3.60 3.77 3.09 3.01 4.65 Strip cut (boyil 0.04 1.04 097 3.22 2.08 2.33 2.51 1.85 161 1.74 0.88 109 35.70 5.58 18 3.12 2.03 6.77 2.01 2.53 0.82 1.08 1.20 1.92 1.59 1.82 3.95 3.25 2.74 150 7.42 556 80 End-area End area cut...

  • just one example/demonstration! Data needed to be calculated is in highlighted in green boxes. And I...

    just one example/demonstration! Data needed to be calculated is in highlighted in green boxes. And I highlighted in red an equation (not sure if thats what you use to calculate it) And ignore the lab instructions on completeing a graph!! I already know how to do that in excel, just curious how Ln (relative rate) and 1/T in K^-1 is calculated by hand* here is the rest of that lab leading up to the question as I know its typically...

ADVERTISEMENT
Free Homework Help App
Download From Google Play
Scan Your Homework
to Get Instant Free Answers
Need Online Homework Help?
Ask a Question
Get Answers For Free
Most questions answered within 3 hours.
ADVERTISEMENT
ADVERTISEMENT
ADVERTISEMENT